Billing and Charging Engineer

After this track you can configure a tariff and prove it charges correctly, build a provisioning flow that completes or rolls back, investigate a wrong balance to its cause, run and check a bill run, integrate a recharge channel so that a top-up happens once, release a charging change safely, lead a migration between charging systems, and decide what to build and what to buy.

0/15 CHAPTERS4 LEVELS

BEFORE YOU START

This track assumes you can already do the following. Each line says where ATLAS teaches it.

WHY THE ROLE EXISTS

Every naira an operator earns passes through its charging and billing systems, and every complaint about a wrong balance ends there too. The billing and charging engineer exists because these systems must be right under load, in real time, for every subscriber, and because the regulator tests them. It is software engineering with money in it: the bugs are races and rounding, and they show up as revenue lost or customers overcharged.

THE LADDER

LevelTitlesWhat changes
FOUNDATIONSJunior Billing Engineer, Support Systems AnalystYou configure plans, run reports and investigate simple balance queries. Your horizon is a ticket. You are judged on accuracy.
PRACTITIONERBilling and Charging EngineerYou build and change provisioning, rating and recharge flows and you find the cause of a wrong balance. Your horizon is a release. You are judged on changes that charge correctly the first time.
LEADSenior Billing Engineer, Support Systems ArchitectYou own the architecture of the charging stack, lead migrations and set the testing standard. Your horizon is a year. You are judged on leakage, availability and safe change.
HEADHead of Support Systems, Head of ITYou own the function: its people, vendors and budget. Your horizon is years. You are judged on revenue protected, on cost, and on passing the regulator's billing tests.

KNOWLEDGE MAP

GETTING IN

People arrive from backend software engineering, from database and integration work, and from an operator's own support-systems team, where they learned the vendor's product. Fintech engineers move across easily, because a prepaid balance is a ledger. Employers ask for SQL, an understanding of concurrency, and the habit of reconciling. A typical interview gives you a wrong balance and a set of records and asks you to find out why.

ADJACENT ROLES

Core network engineer
Owns the network functions that ask for permission to carry traffic; the billing engineer owns the answer.
Revenue assurance analyst
Checks from the outside that revenue is complete; the billing engineer builds the systems being checked.
Backend software engineer
Builds general services; the billing engineer builds the ones where a race is a financial loss.
Telecom product manager
Decides the plan and its price; the billing engineer makes it charge as designed.
SHOW UP TO
MODULE 1

Foundations

FOUNDATIONS 0/4 WRITTEN

Why the role exists, how it thinks, the week, and the map around it.

  1. 01 Why billing and charging engineers exist: the software that holds the moneyCOMING
  2. 02 Philosophies: correct before fast, and every balance explainableCOMING
  3. 03 A billing engineer's weekCOMING
  4. 04 The map of support systems and who owns eachCOMING
MODULE 2

Practitioner

PRACTITIONER 0/6 WRITTEN

The role's core artefacts, produced to a standard a senior would accept.

  1. 05 Configuring a tariff and proving it charges correctlyCOMING
  2. 06 Building a provisioning flowCOMING
  3. 07 Investigating a wrong balanceCOMING
  4. 08 Running and checking a bill runCOMING
  5. 09 Integrating a recharge channelCOMING
  6. 10 Releases and regression for charging changesCOMING
MODULE 3

Lead

LEAD 0/3 WRITTEN

Beyond one piece of work: design, the hard cases, and AI in the role.

  1. 11 Charging architecture reviewsCOMING
  2. 12 Leading a migration between charging systemsCOMING
  3. 13 AI in support systems: what may be automatedCOMING
MODULE 4

Head

HEAD 0/2 WRITTEN

The function: its people, its strategy and its budget.

  1. 14 Building a support systems teamCOMING
  2. 15 Support systems strategy: build, buy and the budgetCOMING