PRACTITIONERCHAPTER 06

Writing the PRD

A product requirements document is a decision record, not a spec: the problem, the evidence, the goals, the non-goals, and what done means

40 MINPRODUCT MANAGERUPDATED 2026-11-05
PREDICT

You open a PRD written by a strong PM. What is the first substantive section after the title?

A product requirements document, PRD, is the written record of a product decision: what problem the team is solving, for whom, why now, what done looks like, and what is deliberately out of scope. It is the one artefact that every reader of your work, engineers, designers, your manager, support, sales, and the PM who inherits the area after you, will go to when they want to know why something was built.

The name is a trap. “Requirements” suggests a contract, a list of things engineering must deliver, and the worst PRDs are exactly that: forty pages of numbered shall-statements that nobody reads and that are wrong by week three. The good ones are short, argue from evidence to a decision, and leave the solution to the people who will build it. This chapter is about writing those.

What a PRD is for

A PRD does four jobs, and it does them for four different readers.

For engineering and design, it answers “what are we trying to achieve, and what must be true when we are done?” so they can design a solution. They do not need you to design it for them. They need the constraints, the success criteria, and the things you have already ruled out.

For leadership, it answers “why this, why now, and what will we see if it works?” so they can decide whether to fund it against the other things the team could do. They will read the first page. Everything they need has to be on it.

For the team in week six, when a stakeholder asks for one more thing, it answers “is that in scope?” The non-goals section exists for this moment. A PRD without one is a PRD that will grow.

For whoever comes next, including you in a year, it answers “why did we do it this way?” The decision log at the bottom, the open questions that got closed, and the launch readout turn the document from a plan into a record.

Notice what is not on the list. A PRD is not a specification of screens or APIs. It is not a project plan with dates and owners, although it links to one. It is not a pitch deck. When a document tries to be all of those, it becomes long, and long documents are not read.

The problem statement comes first

The first real section of a PRD describes the problem, and it is the section most PMs rush. A problem statement that survives review has five parts.

Who has the problem. Not “users” but a segment you can count: merchants processing more than 1,000 transactions a month; shoppers on mobile in Kenya; the three enterprise accounts that renewed last quarter. If you cannot say how many, you cannot say whether solving it matters.

What happens to them, described as behaviour you observed rather than a feature they lack. “Shoppers abandon the card form on the second attempt” is a problem. “Shoppers cannot save their cards” is a solution wearing a problem’s clothes.

How often, with a number and its source. Analytics, support tickets, interviews, a sales call log. The number does not have to be precise. It has to be real.

What it costs, to them and to you. Abandoned checkouts are lost revenue for the merchant and lost fees for you; put a figure on both, even a rough one. A problem with no cost is a curiosity.

Why now. Something changed: a competitor shipped, a regulation landed, the number crossed a threshold, a bigger bet depends on it. If nothing changed, the honest answer may be that this can wait, and writing that down is a PRD doing its job.

The discipline is to write this section before you have a solution in mind, or at least before you write one down. Teresa Torres calls the alternative “solution-first thinking”: you fall in love with a feature, then go looking for a problem to justify it. The evidence you find will be the evidence that supports the feature. Writing the problem first, from research you did in discovery, is how you avoid that.

The anatomy of a PRD that gets built

Here is the shape. It fits on three to five pages for a quarter-sized piece of work, and on one page for a two-week one.

  1. Title and status line. Author, date, status (draft, in review, approved, in build, shipped), the engineering and design leads, and a link to the tracking board.
  2. Summary. Three to five sentences: the problem, the proposed direction, the metric that will move, the rough size. Leadership reads this and nothing else.
  3. Problem. The five parts above, with evidence linked inline.
  4. Goals. What will be true when this succeeds, stated as outcomes. Two or three, no more.
  5. Non-goals. What this work will not do, including the things people will ask for. Each with a one-line reason.
  6. Success metrics. The measure, the current value, the target, the date, and a guardrail that must not get worse. More below.
  7. Requirements. What must be true for the goals to be met. Written as conditions, not as features. Marked must or should.
  8. Proposed direction. One or two paragraphs and a sketch, if you have one, clearly labelled as a starting point for design and engineering rather than the answer.
  9. Constraints and dependencies. Regulation, platform limits, other teams, deadlines that are real.
  10. Open questions. Numbered, each with an owner and a date. This list shrinks as the work proceeds and the closed ones move to the decision log.
  11. Decision log. Date, decision, who made it, why. Scope cuts go here.
  12. Launch readout. Empty until launch. Then: what shipped, the metrics against their targets, what you learned.

Marty Cagan’s version of this list, in the PRD guide in the reading, is twenty years old and has aged well, because the structure follows the decision rather than the fashion. Amazon’s working-backwards document, the press release and FAQ, is the same structure with the summary turned into a press release. Basecamp’s pitch is the same structure for a six-week cycle, with the non-goals renamed “rabbit holes” and “no-gos”. Pick whichever your company uses. The sections matter more than the headings.

Requirements without designing the solution

The requirements section is where PMs most often overstep. The temptation is to write the feature: “the checkout page shows a ‘save this card’ checkbox below the CVV field, checked by default.” That is a design decision, a legal decision, and a fraud decision, and you have made all three in one sentence without the designer, the lawyer or the risk team.

Write conditions instead. “A returning shopper can complete checkout without re-entering card details, within the fraud team’s existing risk thresholds, with consent captured in a way legal signs off.” Now the designer owns the checkbox, legal owns the consent wording, and engineering owns the vault. The requirement says what must be true. The team decides how.

Three tests for a requirement:

  • Could an engineer tell whether it is met? “Fast” fails. “The saved-card path adds no more than 200 ms at the 95th percentile” passes.
  • Does it describe an outcome or an implementation? “Uses the existing tokenisation service” is an implementation. If it is a genuine constraint, it belongs in constraints, with the reason.
  • Would a different solution also satisfy it? If only one solution can, you have written the solution.

Mark each requirement must or should. A must is a condition without which you would not ship. A should is one you would cut under pressure, and you should expect to cut some. If every requirement is a must, nobody believes the list.

User stories, “as a shopper, I want to save my card so that checkout is faster”, are a fine way to draft requirements and a poor way to finish them. They put the user in the sentence, which helps. They also tend to smuggle a solution into the “I want” clause. Convert them to conditions before the review.

Scope and the non-goals section

Scope does not grow because people are undisciplined. It grows because nobody wrote down the things the work would not do, so every reasonable request looks like it belongs. The non-goals section is the cheapest insurance in product management.

Write it by listing what people will ask for. The sales team will ask for saved cards on the invoice product. The biggest merchant will ask for saved bank accounts. Someone will ask for Apple Pay. Each gets a line: what it is, and why not now. “Not now” is a legitimate reason when paired with where it goes instead, usually a backlog item with a link.

Scope cuts made during the build go in the decision log, not silently into the backlog. In week six, when the estimate has doubled, you will cut the “should” requirements. Record which ones and why, so the launch readout can say what shipped against what was planned. Working with engineering covers how to make those cuts without losing the outcome.

Metrics: what worked means

A PRD with no success metric cannot fail, which means it cannot succeed either. The metrics section is where you commit to a definition of done that is about the user, not about shipping.

A usable metric has five parts: the measure, the baseline, the target, the date, and a guardrail.

Part Weak Usable
Measure “Checkout experience” Checkout completion rate, mobile, returning shoppers
Baseline not stated 71% over the last 90 days
Target “improve” 76%
Date not stated end of Q2, measured over 30 days
Guardrail not stated fraud chargeback rate stays under 0.4%

The guardrail is the part most PRDs omit, and it is the one that stops you shipping a feature that moves its own metric by damaging another. Saved cards can raise completion and raise fraud; a target without a guardrail rewards the wrong trade.

Separate leading from lagging indicators. Completion rate is lagging: it takes weeks to read. The share of returning shoppers who see the saved-card option is leading: you can read it on launch day and know whether the feature is reaching anyone. Put one of each in the document. Metrics and experiments covers how to build the tree that connects them.

Be honest about what you cannot measure. If the goal is “merchants trust us more”, say that you will proxy it with renewal rate and a survey, and say that the proxy is weak. A PRD that admits the limits of its evidence is more credible than one that pretends.

Where PRDs go wrong

Written too early. A PRD drafted before discovery is a hypothesis dressed as a plan. If the problem section has no evidence, stop and go get some. A one-page problem brief is the right document at that stage.

Written too late. A PRD written after engineering has started, to justify a decision already made, is documentation rather than a decision. It is still worth writing, but call it what it is.

Too long. Past five pages, readers skim, and a skimmed PRD is one where everyone agrees to different things. Cut the background, link to the research, move the API detail to engineering’s design doc. Google’s design-doc culture, in the reading, is a useful contrast: the design doc is where engineering writes the how, and the PRD should leave room for it.

Written alone. A PRD the engineering lead and designer first see at the review meeting will be torn apart there, and should be. Draft it with them. The document is yours; the decision is shared.

Treated as a contract. When the team hits a problem in week four, the question is not “what did the PRD say?” but “what did we learn, and what does the PRD now need to say?” Change the document. Log the change.

No owner for the open questions. An open question with no name beside it stays open. Every one gets an owner and a date, and the weekly check-in reads the list.

Day to day

The PRD is not a thing you write once. It is a document you work in for the life of the project, and the rhythm looks like this.

Before the PRD, one to three weeks. You run discovery and write a problem brief: one page, the five-part problem statement, a rough size, and the open questions. You review it with your engineering manager and designer in a thirty-minute conversation, not a meeting, and with your own manager in your weekly one-to-one. If the brief survives, you draft the PRD.

Drafting, three to five days of focused writing. Protect two mornings. Most of the time goes on the problem section and the metrics, because those are the parts that need evidence you have to go and find. Share the draft with the engineering lead and designer before anyone else and take their comments in the document.

Review, one week. Circulate to the wider group: your manager, the adjacent PMs, security if the work touches data or money, support and sales if it touches customers. Set a date for comments. Hold one review meeting, forty-five minutes, to resolve the comments that need a conversation. The outcome is a status change to approved, or a list of what must change first.

During the build, every week. The PRD is open in the team’s planning session. Open questions get closed and move to the decision log. Scope cuts are logged the day they are made. When the engineering estimate moves, the summary’s size line moves with it. The PRD is the first place a new joiner is sent.

At launch. You write the readout: what shipped, the metrics against targets at 7 and 30 days, what you learned, what you would do differently. You present it in the same forum that approved the document. This is the part most PMs skip, and the part that makes the next PRD better.

In a typical week in the middle of a project, the PRD costs you an hour: fifteen minutes before planning to update the open questions, the planning session itself, and a comment or two as they arrive. Writing a new one costs a week spread over two. If it costs much more, the document is too long or the discovery was not done.

BY ORG SIZE
STARTUPunder 30 people

There is no template and nobody will make you write one. Write it anyway, as a one-pager: problem with a number, goal, non-goals, one metric with a baseline, open questions. The founder is the reviewer, the review is a conversation, and the document’s value is that it forces the problem to be stated before the three engineers start. Expect to be the only person who reads it in week four. Keep it current anyway; the launch readout is how you earn the right to write the next one.

SCALE-UP30 to 300

A template exists, or you should write one and get two other PMs to use it. The review has real readers: an engineering manager who will hold you to the metrics, a designer who will push back on any requirement that is a design, a head of product who reads the summary and the non-goals. Security and finance appear as reviewers once the work touches money or personal data. The PRD is where the roadmap meets the team, and the decision log is what you show when the roadmap changes.

ENTERPRISE300 and up

The template is mandated and probably too long. The PRD is one of several documents, beside a design doc, a privacy review, a security review and a launch plan, and your job is to keep it the one that states the decision while the others carry the detail. Reviewers include people who will never meet the team: legal, compliance, a programme office. Expect the approval step to be a gate with a date. Write the summary for the executive who reads nothing else, and keep a private one-pager for the team, because the official document will not be what they work from.

ARTEFACT Write the PRD ~60 MIN
YOU PRODUCEProduct requirements document

Template

# <Title>
Author · Date · Status: draft | in review | approved | in build | shipped
Eng lead · Design lead · Tracking: <link>

## Summary
<Three to five sentences: problem, proposed direction, the metric that will move, rough size.>

## Problem
**Who:** <countable segment, with the count>
**What happens:** <observed behaviour, not a missing feature>
**How often:** <number, and where it came from>
**What it costs:** <to them; to us>
**Why now:** <what changed>
Evidence: <links to analytics, interviews, tickets>

## Goals
1. <outcome>
2. <outcome>

## Non-goals
- <thing people will ask for> — <why not now; where it goes instead>
- ...

## Success metrics
| Measure | Baseline | Target | By | Guardrail |
|---|---|---|---|---|
| <leading indicator> | | | | |
| <lagging indicator> | | | | |

## Requirements
- MUST <condition an engineer could test>
- SHOULD <condition>

## Proposed direction
<One or two paragraphs. A sketch if you have one. Labelled as a starting point.>

## Constraints and dependencies
- <regulation, platform limit, other team, real deadline>

## Open questions
| # | Question | Owner | By |
|---|---|---|---|

## Decision log
| Date | Decision | Who | Why |
|---|---|---|---|

## Launch readout
<Empty until launch. Then: what shipped, metrics vs targets at 7 and 30 days, what you learned.>
WORKED EXAMPLE

Harbour Pay is a fictional payments company processing card payments for 4,000 online merchants in three countries, 60 people, two product teams. The checkout team’s PM drafted this after six weeks of discovery.

Summary. Returning shoppers on mobile abandon the card form at twice the rate of first-time shoppers because they re-enter details on a small screen. We propose letting shoppers save a card with the merchant, within existing fraud thresholds. Target: mobile returning-shopper completion from 71% to 76% by end of Q2, with chargebacks held under 0.4%. Size: one team, one quarter.

Problem. Who: returning shoppers on mobile, 38% of checkout sessions, about 410,000 a month. What happens: 29% abandon on the card form, against 15% for first-time shoppers; session replays show the same shopper retrying the card number. How often: every month, steady for six months in analytics. What it costs: about 57,000 lost checkouts a month, roughly $1.9M in merchant revenue and $48,000 in our fees. Why now: the two largest merchants have raised it in renewal talks, and the competitor launched saved cards in March.

Goals. Returning shoppers complete checkout without re-entering card details. Merchants see the improvement in their own dashboards.

Non-goals. Saved bank accounts (different risk model; backlog item CH-212). Apple Pay and Google Pay (separate integration, Q3 candidate). Cross-merchant saved cards (a network-level product, needs legal review; not this quarter).

Success metrics. Leading: share of eligible returning shoppers shown the saved-card option, target 90% within a week of launch. Lagging: mobile returning-shopper completion, 71% to 76% by end of Q2 over a 30-day window. Guardrail: chargeback rate under 0.4%, currently 0.31%.

Requirements. MUST: a returning shopper can complete checkout without re-entering card details. MUST: consent to store the card is captured in a form legal approves. MUST: the saved-card path adds no more than 200 ms at p95. SHOULD: a shopper can remove a saved card from the checkout page. SHOULD: merchants can disable the feature per store.

Open questions. Does storing cards change our PCI scope? Owner: security lead, by 14 March. Which consent wording for each of the three countries? Owner: legal, by 21 March.

Now you

You are the PM for the merchant dashboard at Harbour Pay. Support has logged 140 tickets in three months from merchants who cannot tell why a payout was smaller than they expected. Interviews with eight merchants show the same thing: refunds, chargebacks and fees are deducted from the payout, but the dashboard shows only the total. Two merchants have threatened to leave. The finance team has asked for an “export to CSV” button, the sales lead wants a “payout breakdown PDF” to attach to renewals, and an engineer has already prototyped a new payouts page. Write the PRD for the next quarter’s work on this problem. The problem section must use the numbers above and say what you still need to find out. The non-goals must deal with the CSV, the PDF and the prototype.

Self-check

DECIDE

You are a PM at a 60-person payments company. Discovery on a merchant problem is half done: you have the support tickets and three interviews, no analytics yet. The head of product wants a PRD by Friday so the quarter's plan can be finalised; the engineering manager wants one too, to start estimating. What do you deliver on Friday?

READING
  1. DOC
    How To Write a Good PRD Martin Cagan

    The original argument that a PRD records a decision rather than a specification, with the section list this chapter adapts. Skip the parts about 2005-era process; keep the structure.

  2. POST
    Working Backwards Werner Vogels, 2006

    The Amazon press-release-and-FAQ document, in the words of the CTO who used it. Read it to see the same structure as a PRD with the summary turned into a customer-facing announcement.

  3. POST
    Opportunity Solution Trees Teresa Torres

    Why the problem comes before the solution and how to keep several solutions open while you write. Read it before drafting the problem section.

  4. HANDBOOK
    Shape Up, chapter 6: Write the Pitch Ryan Singer

    Basecamp's version of the PRD for a six-week cycle: problem, appetite, solution sketch, rabbit holes, no-gos. The appetite idea, fixing the time and flexing the scope, is worth stealing.

  5. POST
    Painless Functional Specifications, part 1: Why Bother? Joel Spolsky, 2000

    The case for writing the document at all, aimed at teams that think they are too fast for it. Twenty-five years old and still the clearest statement of what writing it down saves.

  6. POST
    Design Docs at Google Malte Ubl

    The engineering counterpart: what a design doc holds, so you can see what a PRD should leave out. Read the section on goals and non-goals and notice it is the same list.

  7. POST
    The Product-Minded Software Engineer Gergely Orosz

    What the best engineers want from a PM, from the engineering side. Read it to understand the reader you are writing requirements for.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: Prioritisation and saying no →