PRACTITIONERCHAPTER 06

Bug reports that get fixed

A bug report is an argument for a decision: reproducible steps, the smallest failing case, severity and priority kept apart, and impact written in the units the person deciding cares about

40 MINQA AND QUALITY ENGINEERINGUPDATED 2026-11-05
PREDICT

The company name is misspelled on the payment confirmation email that every customer receives. Nothing breaks; money moves correctly. How do you classify it?

A bug report is the most-read thing a QA engineer writes. Engineers read it to fix the bug. The product manager reads it to decide whether to fix it now, later or never. Support reads it to answer customers. Whoever triages it in a year reads it to work out whether it is the same bug as theirs. Most bug reports are written for none of these people. They are written for the tester, as a note that the bug was seen.

Kaner, Bach and Pettichord make the point in Lessons Learned in Software Testing that the goal of reporting is not to log bugs but to get the right ones fixed. That reframes the job. A bug report is an argument. It has to convince an engineer that the bug is real and worth their afternoon, and it has to give a decision-maker what they need to rank it against everything else. This chapter is about writing reports that do both, and about what to do when the answer comes back no.

What a bug report is for

A report does three jobs, in order.

It makes the failure reproducible. If the engineer cannot see the bug, the bug does not exist for them. Most reports that die in the backlog die here: “can’t reproduce” is, as a rule of thumb, one of the commonest resolutions after “duplicate”, and it is usually a reporting failure rather than a flaky bug.

It makes the failure understood. The engineer needs to know what is wrong, which is different from what you did. “Transfer fails” says what you saw. “The quote’s expiry is checked on the client, so a quote that expired while the app was backgrounded is submitted and rejected by the server with a generic error” says what is wrong. You will not always get to the second, but the closer you get, the faster the fix.

It makes the failure weighable. Someone has to decide whether this bug beats the feature work, the other forty bugs, and the refactor the tech lead wants. They cannot do that from steps and a stack trace. They need impact: who, how many, how often, what it costs. This is the job most reports skip, and it is the one that decides whether the bug gets fixed.

Anatomy of a report

Joel Spolsky’s “Painless Bug Tracking” reduced a bug report to three things: steps to reproduce, what you expected, and what you saw instead. That is the floor. A report that triage can act on without a follow-up conversation has these sections.

  1. Title. The failure and its condition, in one line someone can search for: “Transfer submitted twice when Send is tapped during a slow network request (Android)”. Not “Send button bug”. The title is what triage reads, and often all it reads.
  2. Summary. Two or three sentences: what fails, under what condition, and the headline impact.
  3. Environment. Build or commit, platform, browser or OS version, account type, feature flags, region, test data used. Name the environment (staging, production) and the date and time with time zone, so logs can be found.
  4. Steps to reproduce. Numbered, starting from a known state. Each step is one action. Include the data: the amount, the currency pair, the account.
  5. Expected result, and where the expectation comes from: the spec, the PRD, a previous version, a regulation, a competitor, common sense. Say which. This line is what you will argue from if the bug is closed as designed.
  6. Actual result. What happened, exactly. Error text copied, not paraphrased. Codes and IDs in full.
  7. Frequency. Every time, two in ten attempts, once. If it is intermittent, say how many attempts and what you varied.
  8. Evidence. Screenshot or screen recording, request and response, log lines with a trace or request ID, a link to the dashboard query.
  9. Severity, set by you, with the definition you used.
  10. Impact, in the reader’s terms. More below.
  11. Workaround, if one exists, and what it costs the user or support.
  12. Suggested priority, clearly labelled as a suggestion.

Simon Tatham’s essay “How to Report Bugs Effectively”, in the reading, is written for users reporting to developers, and it is the best short statement of the discipline: report what you observed, not what you guess, and give the programmer a way to see the failure for themselves.

Reproduce, isolate, generalise

The difference between a report that is fixed in a day and one that bounces for a week is usually the work done after the bug was first seen. The BBST Bug Advocacy course, Cem Kaner’s course on this subject, teaches it as a sequence: replicate the failure, isolate it to the fewest steps and the smallest data that still fail, maximise it by looking for the worst consequence it can cause, generalise it by finding the broader conditions under which it occurs, externalise it by describing the effect on people rather than on the code, and write the report clearly and neutrally.

Two of those steps change outcomes more than the others.

Isolate. Strip the steps until removing any one makes the bug go away. If it fails with a £5,000 transfer, try £50. If it fails on Android 14, try 13. If it needs a specific account, find out what about the account matters. A twelve-step report gets read as “complicated, probably an edge case”. A three-step report with the trigger named gets fixed.

Maximise. The first symptom you see is rarely the worst one. A rounding error of one cent on a receipt is cosmetic. The same rounding error in the amount sent to the payout partner is a reconciliation break that finance will find at month end. Follow the bug downstream before you file it. The double-submit bug in the opening was filed at its first symptom, a second confirmation screen, rather than its worst one, a second debit. For payment flows the idempotency lesson explains the mechanism you are usually testing.

Maximising is not inflating. You are looking for consequences that are real and reproducible, and you report what you found. If you could not make it worse, say so. Credibility is the asset a QA engineer spends on every report, and one exaggerated severity costs more than it buys.

Severity is not priority

Most bug trackers have two fields, and most teams use them as one. They answer different questions and different people own them.

Severity Priority
Question How bad is the failure when it happens? How soon will we fix it?
Nature Technical: the effect on the system and the user Business: urgency against everything else
Usually set by QA, at filing, revised by engineering The product owner or the triage group
Changes when You learn more about the failure The roadmap, a customer, a deadline or a regulator changes
Typical scale Critical, major, minor, trivial; or S1 to S4 P1 to P4, or now, next, later, never

Mozilla’s public bug-management docs are a clean real example. Severity S1 to S4 describes the scope of the problem, with S1 for things like crashes that lose data and S2 for problems serious enough that users would switch browsers. Priority is a separate field: P1 means fix in the current release cycle, P2 the next one or two, P3 the backlog, and P5 means Mozilla will not fix it but will accept a patch.

The two fields come apart in four ways, and every tester should be able to give an example of each.

  • High severity, high priority. Transfers to one corridor fail at submission. Fix now.
  • High severity, low priority. An internal admin tool used by two people crashes when exporting more than 10,000 rows; the export is run quarterly and has a workaround. Severe, not urgent.
  • Low severity, high priority. The company name is misspelled on the receipt, or the regulator-mandated disclosure text is in the wrong font size. Nothing is broken; it still goes first.
  • Low severity, low priority. A tooltip is clipped on one screen size. It may never be fixed, and that is a reasonable outcome.

Set severity from a written scale, not from how you feel about the bug. If your team has no scale, write one with four levels and an example for each, and get engineering and product to agree it. Then priority is the field you argue about, which is where the argument belongs. You may suggest a priority, and in a good triage your suggestion carries weight, but the decision belongs to whoever owns the trade-off, which is usually the PM. The prioritisation chapter in the PM track describes how they rank work; your report is one input to that ranking.

Writing impact in the reader’s terms

Impact is the section that decides priority, and it is the one testers write worst. “This is a serious bug that affects users” tells a PM nothing. They rank work by cost of delay: what does waiting cost, per week? Your impact statement should let them estimate it.

Write it in five parts.

Who. A segment they can count: senders to Poland, Android users on the current release, merchants on the annual plan. Pull the count from analytics or ask someone who can.

How often. The share of their sessions, transfers or sends that hit the condition. “Every transfer where the recipient name contains a diacritic, which is about 9% of Polish recipients in last month’s data.”

What it costs them, and you. Money moved wrongly, time lost, support contacts, refunds, chargebacks, churn risk, reputational damage, regulatory exposure. Put a figure on it with its source, or a range if you have to estimate. If a rule applies, name it: a remittance company in the US that shows the wrong received amount before payment has a disclosure problem under the CFPB’s Remittance Transfer Rule, and the PM needs to know that before triage, not after.

Workaround. Whether users can get round it, and what that costs. A workaround that runs through support is a cost per contact.

Trend. Whether it is getting worse: tied to a growing segment, a marketing push, a launch next month.

Two rules keep this credible. Give the source of every number, and mark estimates as estimates. And write in the PM’s units, not yours. “Null pointer in the quote service” is your unit. “About one in thirty Polish transfers returned by the partner bank, about 1,400 a month, each costing a £4 return fee and a support contact” is theirs.

Triage

Triage is the meeting where reports become decisions. In most teams it is short, frequent and dull, and when it works, nobody notices it.

Who attends. The PM or product owner, who owns priority. An engineering lead, who can say what a fix costs. QA, who can say what the bug is. Support, when the bug reaches customers. Thirty minutes, once or twice a week; daily in the last fortnight before a release.

What it does. For each new or reopened bug: confirm it is real and not a duplicate, agree severity, set priority, assign an owner, or record another resolution. The resolutions worth knowing by name are fixed, won’t fix, duplicate, cannot reproduce, needs more information, deferred, and works as designed. Every non-fix resolution gets a one-line reason on the ticket.

The bug bar. As a release nears, teams raise the bar: only bugs above a stated severity, or in named areas, can still go in. Writing the bar down before the last week stops every bug becoming a negotiation.

Your job in the room. Present each bug in one sentence of failure and one of impact. Know the numbers. Accept the decision when it goes against you, and make sure the reason is written down. A won’t-fix with a reason is a good outcome; it means the trade was made on purpose.

When the answer is ‘works as designed’

Engineering closes your bug: works as designed. This happens often, and it means one of three things.

You were wrong. The behaviour is in the spec and you missed it. Say so on the ticket and move on. Owning this quickly is what makes your other reports credible.

The design is wrong for a case nobody considered. The code does what the spec says, but the spec did not imagine this situation. This is the most valuable bug class a tester finds, because nobody else will.

The design was a trade-off someone made on purpose. A constraint from a partner, a cost decision, a deliberate simplification. The question is whether the trade still holds given the impact you have found.

In the second and third cases, the dispute is not between you and the engineer. The engineer built what was asked. The question is whether what was asked is still what the product owner wants. So you stop arguing about the bug and turn it into a product question: here is the behaviour, here is who it affects and what it costs, is this what we intend? Take it to the PM with the impact written out. Kaner and his co-authors make this point repeatedly: a tester who keeps reopening a ticket loses the argument and the engineer’s goodwill; a tester who moves the question to the person who owns it often gets the design changed.

What not to do: reopen it without new information, escalate over the engineer’s head without telling them, or change the severity to force attention. Each one spends credibility you will need for the next report.

Where bug reports go wrong

Opinion in place of observation. “The checkout is broken” or “this is terrible UX”. Report what happened and what you expected. The adjectives make the engineer defensive and tell them nothing.

Several bugs in one report. Each gets fixed, deferred and verified separately. One report, one failure.

Severity as a lever. When every bug is critical, the field stops meaning anything, and triage starts ignoring it.

No expected result source. Without it, “expected” is your preference, and a works-as-designed close is unanswerable.

Filed and forgotten. A report is not done when it is filed. It is done when it is fixed and verified, or closed with a reason you accept.

Day to day

Every session. You find bugs while executing tests or in exploratory sessions. You note them fast in session notes, then spend ten to thirty minutes per bug on isolation and maximising before you file. Most testers file too early. A rough rule from practice: if you have not tried to make it smaller and worse, you are not ready.

Filing. Search the tracker for duplicates first, by symptom and by component. Write the report from the template. Attach evidence. For anything severity 1 or 2, message the engineering lead directly as well, with the link; do not wait for triage.

Triage, once or twice a week. You arrive having read every new bug, with the impact numbers ready for the ones you filed. You leave with every bug either assigned or resolved with a reason.

Verification, daily. Bugs come back marked resolved. Spolsky’s rule, that the person who opened a bug is the one who closes it, still holds: you rerun the steps on the fixed build, check the neighbouring cases you found while generalising, and close or reopen with what you saw.

Weekly. Look at the shape of the backlog: what is ageing, what is clustering in one component, what keeps coming back as cannot reproduce. Clusters are a signal for the test strategy and a conversation with the engineering lead.

After an escape. When a bug reaches production, find whether it was reported and how it was triaged. If it was reported and deprioritised, the report or the triage failed, and the retrospective should say which. Release management and sign-off covers what happens next, and quality metrics covers how escapes are counted.

BY ORG SIZE
STARTUPunder 30 people

There is no QA function and probably no triage meeting. Bugs arrive in a Slack channel from founders, customers and engineers, and most are fixed by whoever reads them first. Your job, if you are the first tester, is to give the stream a shape: one tracker, a four-level severity scale everybody agrees on, a short template, and a weekly half-hour with the founder who owns priority. Impact is easy to measure here because you can name the customers. Do not import a heavyweight workflow; the template and the weekly meeting are enough.

SCALE-UP30 to 300

Several teams, several trackers, and a backlog nobody has read end to end. This is where severity and priority get merged into one field and lose meaning, and where you write the definitions and get them adopted. Triage becomes per team, with a cross-team session for bugs that span services. Support has its own queue and its own idea of urgency, so agree how a support escalation becomes a bug and who sets its priority. Your reports start being read by people you have never met; write them for that reader.

ENTERPRISE300 and up

Severity definitions exist, are mandated, and are tied to fix-time targets and sometimes to contracts or audit evidence. The work is less about writing one good report and more about the system: duplicate detection across hundreds of teams, defects that cross organisational boundaries, and a works-as-designed close that is really a dispute between two departments. Impact statements now go to people who weigh regulatory exposure and customer contracts, so cite the rule and the clause. Expect formal escalation paths; use them only after the direct conversation has failed.

ARTEFACT Write a bug report that gets fixed ~45 MIN
YOU PRODUCEBug report

Template

# <Failure> when <condition> (<platform/area>)
Reporter · Date and time (with time zone) · Component · Build/commit
Severity: S1 | S2 | S3 | S4 (scale: <link>) · Suggested priority: P1–P4 (suggestion)

## Summary
<Two or three sentences: what fails, under what condition, headline impact.>

## Environment
Environment: <staging | production> · Platform/OS/browser · Account type · Flags · Region
Test data: <accounts, amounts, IDs>

## Steps to reproduce
1. <known starting state>
2. <one action per step, with data>
3. ...

## Expected result
<What should happen.> Source: <spec / PRD section / previous version / regulation / convention>

## Actual result
<What happened. Exact error text, codes, IDs.>

## Frequency
<Every time | n of m attempts; what you varied>

## Evidence
- Recording/screenshot: <link>
- Request/response or log lines with trace ID: <link>

## Impact
**Who:** <segment, with the count and its source>
**How often:** <share of their transfers/sessions/sends>
**Cost:** <money, support contacts, churn risk, regulatory exposure; estimate marked as such>
**Workaround:** <exists? what it costs>
**Trend:** <growing, stable, tied to a launch>

## Notes
<What you tried that did not reproduce it; related tickets; suspected cause, labelled as a guess.>
WORKED EXAMPLE

Cobalt Remit is a fictional cross-border transfer company, 140 people, sending about 310,000 transfers a month from the UK and EU to twelve countries through local partner banks. A QA engineer on the payouts team filed this after an exploratory session on the Poland corridor.

Title. Transfer to Poland returned by partner bank when recipient name contains Polish diacritics (all platforms).

Summary. Recipient names with characters such as ł, ś or ż are transliterated to ASCII before submission to the Polish partner, and the partner’s name check rejects a share of them, returning the funds three to five working days later. Customers see “Delivered” until the return arrives.

Steps. 1. Log in as a verified UK sender on staging, partner sandbox enabled. 2. Create a transfer of £100 GBP to PLN to recipient “Paweł Łukasiewicz” with a valid test IBAN. 3. Confirm and send. 4. Advance the sandbox clock 72 hours.

Expected. Transfer delivered; the name is passed as entered. Source: the partner’s API guide, section 4.2, accepts UTF-8 in the beneficiary name field since its March release.

Actual. Name submitted as “Pawel Lukasiewicz”; sandbox returns code R03, name mismatch. Status in the app stays Delivered.

Frequency. 7 of 10 attempts with diacritic names; 0 of 10 without.

Impact. Who: senders to Poland, 41,000 transfers a month (payments dashboard, October). How often: 9% have a diacritic in the recipient name; the returns report shows 1,380 name-mismatch returns last month, up from 600 in June. Cost: £4 return fee each, about £5,500 a month, plus a support contact per return (support tagging, October: 1,150 contacts). Customers are told the money arrived when it did not. Workaround: none for the customer. Trend: rising with the Poland campaign.

Severity S2. Suggested priority P1, because the status shown is wrong as well as the transfer failing.

Now you

You are the QA engineer for Pipit, a fictional email and SMS marketing platform with 2,300 business customers, most in the US and UK. In an exploratory session you find that a campaign scheduled for “9 am in each contact’s local time” sends at 9 am UTC to any contact with no time-zone field, which is 18% of contacts. For US contacts that means texts arriving between 1 am and 5 am. Last month that was about 1.2 million SMS. Support has 14 complaints on file, two from enterprise accounts, and one customer asked whether this exposes them under US quiet-hours rules for marketing texts. The complication: a ticket for the same behaviour was filed six months ago at minor severity and closed as works as designed, with the note “UTC is the documented fallback”. The PM for scheduling is on leave this week, and a release freeze starts on Friday. Write the bug report, decide whether to reopen the old ticket or file a new one, and say who you send it to before triage.

Self-check

DECIDE

You are the QA engineer on Cobalt Remit's payouts team. Your report on the Polish diacritics returns has come back closed as 'works as designed'. The engineer's note says the payout service transliterates every name to ASCII because two of the twelve partner banks rejected UTF-8 when the service was built, and this was agreed with the previous PM. Returns are 1,380 a month and rising. What do you do?

READING
  1. BOOK
    Lessons Learned in Software Testing: A Context-Driven Approach Cem Kaner, James Bach, Bret Pettichord, 2001

    Read the chapter on bug advocacy: short numbered lessons on writing reports that persuade, handling disagreement, and protecting your credibility. The most practical text on the subject. Read: Chapter 4, Bug Advocacy.

  2. POST
    Painless Bug Tracking Joel Spolsky, 2000

    The three-part minimum for a report, the resolution states, and the rule that whoever opened a bug closes it. Short, opinionated, and the source of most bug tracker workflows since.

  3. DOC
    BBST Bug Advocacy Cem Kaner and the BBST team

    The course outline for Kaner's bug advocacy course: making people want to fix a bug, irreproducible bugs, objections, credibility and influence. Use it as a syllabus for going deeper.

  4. POST
    How to Report Bugs Effectively Simon Tatham

    Written for users reporting to developers, which makes it a good test of whether your reports would make sense to someone outside your team. Facts over guesses, every time.

  5. HANDBOOK
    Firefox bug severity definitions Mozilla

    A real, public severity scale with examples per level. Read it alongside the priority page to see the two fields kept apart in a project with thousands of bugs a month.

  6. HANDBOOK
    Firefox bug priority definitions Mozilla

    Priority as a statement about when, tied to release cycles, including the useful P5 meaning will not fix but will accept a patch. A model for writing your own.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: Test automation and the SDET →