LEADCHAPTER 15

Mentoring and unblocking others

Help comes in rungs from a question to doing it for them; take the lowest rung that clears the block before the date, say out loud how long to struggle, and write a growth plan so the help adds up

40 MINSOFTWARE ENGINEERUPDATED 2026-11-21
PREDICT

A graduate on your team has been stuck for two days on a failing test, and you know how to fix it. What is the most useful first move?

You can now carry a feature from a ticket to production, review someone’s change and debug a problem you have never seen. At senior level people also arrive at your desk with their problems. Some are small and some are two days old. How you answer decides whether the people around you get faster or learn to wait for you.

This chapter is narrow on purpose: unblocking one junior engineer on your own team, and growing them with a plan. The wider craft belongs elsewhere. Mentoring and sponsorship covers the difference between mentoring, coaching and sponsoring, and what a staff engineer does with influence. One-on-ones and feedback covers the meeting a manager runs with each report. Performance management covers the review. Read those for the frame. This chapter is your move in the moment, and the plan behind it.

The running case is Lumora Mobile, the mobile network operator with 31 million subscribers. Its payments engineering team builds the card top-up flow in the airtime app. Each January the team takes a graduate intake, and each graduate has a buddy, a mid-level engineer on the same team. Edet is the graduate who is stuck, and Radhika is Edet’s buddy. All figures below are illustrative.

The model: help is a ladder

When someone is stuck, you do not choose between helping and not helping. You choose a rung. From the lowest to the highest:

Rung What you do What it costs you What they keep
1. Ask “What have you tried? What do you think is happening?” Five minutes Everything; they may find it as they explain
2. Point Name where to look: a log line, a state diagram, a file Ten minutes The search and the reasoning
3. Hint Say what kind of thing is wrong, without the fix Ten minutes The fix
4. Pair, them driving They type, you navigate, for a fixed time About an hour The work and the next step
5. Show You do it while they watch, and explain as you go Half an hour The picture, not the practice
6. Do it You fix it, and explain afterwards Twenty minutes, plus the explanation The result, and a story

The ladder is this chapter’s framing, not a published method. Its use is a rule: take the lowest rung that clears the block before the date, and be willing to move up when a rung does not work. Rung 1 always comes first, because it is cheap and it tells you where the person is. Many blocks end at rung 1 or 2, because a person who explains a problem aloud to someone who listens often hears the answer in their own sentence.

Two things push you up the ladder. One is the calendar. A block with three weeks of slack can sit on rung 2 or 3 for a day. A block with two days of slack cannot. The other is cost to others: if the block holds up a release or another person’s work, the case for a higher rung grows. Two things hold you down: the person’s own learning, and your own queue. Every rescue you perform becomes a pattern of dependence, and your time is the team’s scarce resource.

Notice that the rungs are about what the other person keeps. At rung 6 they keep a working test. At rung 4 they keep a working test, and the memory of finding it. Fournier’s chapter on mentoring starts from new hires and notes that a newcomer runs into a workplace’s unwritten rules. A new person can read the explicit rules but not the implicit ones, and how long to struggle before asking is one of the implicit ones.

Say how long to struggle

The most common reason a junior is stuck for two days is that nobody told them they could stop after two hours. A graduate wants to look capable. They believe that asking early looks weak and that asking late looks fine, and they often have it backwards. A person who is stuck for two days has cost the team more than one who asked on day one, and the team would rather have the question.

So make the implicit rule explicit, ideally on the first day. As a rule of thumb, an hour or two stuck on one blocker is long enough to ask, and half a day on a task whose goal is unclear is too long. Pick your own numbers with the person and write them down in the team’s working agreement. Then add two things that make the rule safe to follow:

  • Say what a good question sounds like. “It doesn’t work” is hard to answer. “I expected the airtime to be credited within two seconds, it is not, I have checked the provider’s response and the response says pending, and I do not know what to do with that” is easy. Julia Evans’s advice on asking questions is to say what you already understand and ask whether that is right. Give a junior the post and a template: what I wanted, what happened, what I have tried, what I think.
  • Ask them on day two. Do not wait for them to come. At stand-up, or in a message, ask “what is the thing you are least sure about today?” A junior who has been stuck will often say so, once asked directly and in a way that makes it a normal thing to be.

A time box is not a cap on help. It is a trigger: when it ends, the person asks, and you answer on rung 1.

The case: Edet’s failing test

Lumora’s team has an integration test for card airtime top-ups. It buys ₦1,000 of airtime with a test card against the provider’s mock and checks that the subscriber’s balance goes up. It has been failing since Monday. It is now Wednesday morning, and the release is on Friday. Edet has spent two days making the mock return success faster, by changing the test’s configuration and then the retry settings.

You know what is wrong, because you have seen it. The mock’s third test card, which Edet is using, is born pending: that is not a failure, and the test asserts the balance as soon as the first answer arrives. A pending charge is not a declined charge, and the balance must not move until the provider says so. Payment states, failures, reversals and refunds explains why: the charge machine has a state between asked and answered, and code that treats it as a failure or as a success will eventually double-charge or credit airtime that was never paid for. The test should wait for the final event, verify it and then assert.

Run the ladder.

Rung 1, five minutes. “Walk me through what you expect and what you see.” Edet says the test expects the balance to go up, the balance does not, and the mock must be slow. Listen for what is missing. Edet has not mentioned the response’s status. That is the gap.

Rung 2, if it is enough. “What does the response say?” Edet reads out pending. Some people see it at once. Edet does not, and says the status is not an error, so it is fine. Rung 2 has not worked, because the gap is not where to look but what the word means. Move up.

Rung 4, an hour. Sit with Edet and have them drive. Ask what states a card payment can be in. Let them find the diagram in the course chapter. Ask what the test should do when the first answer is pending. Edet writes the wait, with a bounded timeout, and the test passes. You have not typed. In the last ten minutes, Edet writes two lines in the team’s notes: what pending means and how the test now handles it. That is the learning, and it goes where the next graduate will see it.

Why not rung 6? You would have the same green test by 09:20. Edet would have learned that two days stuck ends with you. And the misunderstanding that caused the failure, that pending is a kind of failure, would sit in Edet’s head until it showed up in production code.

Why not rung 3? A hint and a day’s wait is a good answer on a Monday. On Wednesday morning with a Friday release it leaves one day to fix, review and merge, and Edet would be doing it on the day the team is busiest. Move to the hour.

And the buddy? Radhika is the first person Edet should have asked, and the fact that Edet did not is information. Tell Radhika what happened, without blame, and ask her to check in with Edet on day two of any task. Sending Edet to Radhika now would be the right call if she had the context and an hour free. It is the wrong call if Edet has already shown they will not go, and two days stuck suggests that.

When fixing it yourself is right

None of this means rung 6 is wrong. It is right when the cost of waiting falls on someone other than the person you are helping.

  • A production incident. The customer is harmed now. Fix it, then hold a short debrief. On call for what you built is the setting where this happens.
  • A block that holds up a release or someone else’s work. The Friday date is real, and if the pairing hour would not have fitted, a fix and an explanation is fair.
  • A task that is not a learning task. A broken build, an expired certificate, a permissions problem. Nobody grows by suffering it.

When you do fix it yourself, do two things. Say that you are doing it, and why: “I am going to fix this because the release is blocked, and I will walk you through it at 3.” Then keep the promise. A fix without the explanation is the worst of both options.

The opposite mistake is as common. A senior who never rescues, on principle, lets a junior sit through a missed date and calls it learning. The test of any rung is not how it feels but what the person keeps and what the team pays.

Review as a teaching tool

You give the most help through code review, and nobody calls it mentoring. A review comment is a small lesson delivered at the moment a person is looking at the code. The pieces from code review, giving and receiving apply here, with a teaching bias.

Name the principle, not only the fix. “Use a constant here” teaches nothing. “The retry count appears in three places, so changing it means finding all three” teaches why. Google’s public guidance on writing review comments asks reviewers to explain their reasoning and to comment on the code and not the developer, and it is a good standard for a junior’s review.

Mark what is optional. A junior reads every comment as an order. Label a suggestion as a nit or as optional, so that three comments about naming do not outweigh the one about money.

Ask before you tell. “What happens if the provider answers twice?” teaches more than “this is not idempotent”, and it costs the same.

Keep the volume bounded. Twenty comments on a first pull request are not a review, they are a demoralising list. Pick the three that matter, say what is good, and leave the rest or take them to a conversation. The graduate’s median of three review rounds in the scenario below is a sign to look at, and the first thing to check is whether your comments arrive all at once or in a trickle.

A growth plan for one person

Unblocking is reactive. A growth plan is how you get ahead of it. It is a page, written with the person, that says where they want to be, where they are, what work will stretch them and how you will help. It is not their performance review, and it does not replace one: their manager owns that, and the line is covered in mentoring and sponsorship.

Four parts matter.

  1. A goal in their words. Not “get better at backend”, but something like being on the rota or owning a small service. The goal-setting method is in mentoring and sponsorship.
  2. Evidence of where they are. Use specifics, not impressions: pull requests merged, review rounds, how long they were stuck and on what. Two or three observations are enough. Show them to the person.
  3. Stretch work with support. Each task is a size they can finish in a week or two with help, in an area that moves them toward the goal. Each has a definition of done, a rung of help you expect to give, and a check-in date. This is delegation: hand over the outcome, the context and the constraints, not only the task, and agree when you will look.
  4. A review date. About ten weeks is a rule of thumb. At the date you look at the evidence again and either renew, change or end the plan.

The plan also states what you do about help. For Edet, the default might be: rung 1 within an hour of a question, a pairing hour for anything stuck over half a day, and a weekly look at the buddy arrangement with Radhika. A plan with no help in it is a to-do list.

Tell their manager what you see, whether it is struggle a plan cannot fix or strong work. Mentoring and sponsorship covers where the mentor ends and the manager begins.

Where practitioners disagree

Struggle or speed. Some engineers hold that productive struggle is how people learn and a fast answer wastes it. Others point out that a person stuck without progress is not learning, only waiting. Both are right, and the test is progress: struggle with progress is worth protecting, and a plateau is not.

Pairing or asynchronous help. Pairing is the strongest rung for learning and the most expensive in time. The article by Böckeler and Siessegger on Martin Fowler’s site describes the driver and navigator roles that the pairing rung relies on. Written answers scale better, and for a junior with a good habit of writing questions they are often enough.

Buddy or senior. A buddy is closer in experience and less intimidating, and a senior knows more. Most teams do best with both: the buddy first, and the senior for what the buddy cannot answer. The failure is a buddy arrangement that exists on paper.

Formal or informal. A growth plan can feel heavy for a person who is doing well. Offer it, do not impose it, and keep it to a page.

Day to day

On a junior’s first day. State the time box and what a good question looks like. Introduce the buddy and say what the buddy is for.

Every morning, five minutes. Ask each junior near you what they are least sure about today. It costs little and finds a block on day one rather than day three.

When someone asks. Start on rung 1, and say aloud that you are doing it.

In review. Three comments that teach, labelled, with at least one specific piece of praise.

Weekly, thirty minutes. Pair on whatever is hardest this week, with the junior driving. Fix the day and keep it even in a busy week.

Every two weeks. Talk to the buddy: who has been stuck, and for how long, and whether the buddy is being asked.

Monthly. Look at the plan against the evidence. Tell the manager what you see.

At the review date. Decide whether to renew, change or end the plan, and write down what the person can now do that they could not before.

BY ORG SIZE
STARTUPunder 30 people

Tallowmere has 9 engineers, no graduate programme and no buddy scheme. The senior engineer is the mentor, the buddy and the code reviewer, which makes the time box and the daily question the most important habits. A growth plan is a half page in the shared notes. Because the team is so small, every minute you spend unblocking is a minute off the product, so give help on the lowest rung that works and write down the answer once so you do not give it twice.

SCALE-UP30 to 300

Wrenpost has 55 engineers in seven teams, and the way new people are helped is still being decided team by team. Some teams have a buddy and others have nothing written. Your own habits set the standard for your team, so write the time box into the team’s working agreement and ask the engineering manager how the buddy role is meant to work. Share what you learn from unblocking, such as the questions that recur, because the same gap probably exists in the next team.

ENTERPRISE300 and up

Lumora Mobile has 6,000 staff, a yearly graduate intake and a named buddy for each graduate. The structure exists, so the problem is that it can become a box to tick: a buddy assigned in January who never hears from the graduate again. Your part is to make it real on your team by checking in with the buddy, spotting a graduate who has gone quiet, and telling the manager early. Expect programme paperwork and check-ins that you do not control, and keep your own help simple underneath them.

ARTEFACT Write a growth plan for a junior ~40 MIN
YOU PRODUCEA one-page growth plan with evidence, stretch work, planned help and a review date

Template

# Growth plan: <name>, <role>, <start date to review date>

## Goal, in their words
<What they want to be doing by the review date that they cannot do now>

## Where they are now (evidence)
- <Observation with a number or date, and the source>
- <Observation>

## Stretch work
| Task | Size | Done means | Help I expect to give | Check-in |
|---|---|---|---|---|
| <task> | <days> | <outcome> | <rung and when> | <date> |

## How we handle being stuck
<Time box. What a good question contains. Who to ask first. What I do on day two>

## Who does what
<Me, their buddy, their manager>

## Review
<Date, evidence I will look at, and what would make me renew, change or end it>
WORKED EXAMPLE

Tallowmere is a fictional online pharmacy with 9 engineers. A graduate engineer joined in September. The senior engineer who sits beside them writes the plan after ten weeks. All figures are illustrative.

Goal, in their words. “I want to change the order-status emails without asking anyone to check my work first, by the end of March.”

Where they are now. Five pull requests merged in ten weeks, median two review rounds. Two periods stuck: one and a half days on a failing local setup in week 3, and a day on a test that depended on today’s date in week 7. Both were solved after asking. Tests are the strongest part of their work: three of the five pull requests had review comments praising them.

Stretch work.

Task Size Done means Help Check-in
Add a delivery-delayed email 5 days Sent in staging, with tests and a rollback line Pair for the first hour; rung 1 after that Day 2 and day 5
Fix the date-dependent test pattern in order tests 3 days Fake clock in four test files Rung 3 only Day 3
Write the runbook for the email queue 4 days Another engineer follows it in staging Review only Day 4

Stuck. An hour is enough to ask. A good question says what was expected, what happened, what has been tried and the guess. The senior engineer asks on day two of any task.

Who does what. The senior engineer gives help and review. The engineering lead owns the review and is told monthly what the senior sees.

Review. 22 January. Evidence: review rounds, days stuck, and whether the delayed-email change went out unaided. Renew if two of three tasks finish on time.

Now you

You are a senior engineer on Lumora Mobile’s payments engineering team. Edet joined in this January’s graduate intake and it is now late November. Radhika, a mid-level engineer in her third year on the team, is Edet’s buddy. You have these notes. Edet has merged 24 pull requests since January, with a median of three review rounds. Two periods stuck: two days on the card top-up test last week, and a day and a half in March on a broken local environment; both ended only when you or Radhika noticed. Edet writes careful tests but has not asked a question in the team channel. Asked what they want, Edet said: “I would like to be on the on-call rota by June, but I do not think I am good enough yet.” The team’s January work includes changing how failed top-ups are refunded, a task with two or three small pieces. The team releases every Friday. Complication: Radhika moves to the settlement team on 1 February, and Edet’s manager has asked for a growth plan by the end of next week. Write the plan, with a review date.

Self-check

DECIDE

You are a senior engineer on Lumora Mobile's payments engineering team. It is Wednesday morning. Edet, a graduate from this January's intake, has been stuck since Monday on the failing integration test for card airtime top-ups, and the release is on Friday. You know the cause and could fix the test in 20 minutes. Edet's buddy, Radhika, is at her desk and free after lunch, and Edet has not asked her anything. Edet is quiet and works carefully, and has not said they are stuck. What do you do?

READING
  1. BOOK
    The Manager's Path Camille Fournier, 2017

    Starts from mentoring interns and new hires, and makes the point that a new person needs the unwritten rules of a workplace as much as the written ones. Read: Chapter 2, Mentoring.

  2. POST
    On Pair Programming Birgitta Böckeler and Nina Siessegger, 2020

    How to pair well, including the driver and navigator roles. It is the model for the pairing rung.

  3. DOC
    How to write code review comments Google

    Google's public review guidance: comment on the code and not the developer, and explain your reasoning. A sound standard when your review is also a lesson.

  4. POST
    How to ask good questions Julia Evans

    A practical guide to asking, written for the person who is stuck. Give it to a junior, and use it to judge your own questions.

  5. POST
    How to answer questions in a helpful way Julia Evans

    The same author on the answering side: ask for the missing details, and walk someone through your steps when they want to learn. It is rung 1 and rung 5 of the ladder, written up.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.