LEADCHAPTER 12

Architecture reviews and governance

Run the review as a process with a door and an exit: written triggers, entry criteria checked before the meeting, a decision recorded with its conditions, and a follow-up that checks what was built

45 MINSTAFF AND PRINCIPAL ENGINEERUPDATED 2026-11-07
PREDICT

Your architecture review board's median wait from submission to decision is five weeks, and teams have started going around it. Which change usually does most to fix it?

By the time you are a principal engineer you review other people’s designs every week, and often you are the person who runs the review. This chapter is about that job: designing an architecture review as a process with written triggers, entry criteria and exit criteria; chairing it so it ends in decisions; and keeping it from becoming the queue that teams route around.

Two neighbouring chapters set the edges. Writing RFCs and design docs covers the document an author brings and how an author runs the review of their own proposal; read it first, because this chapter assumes it. Architecture governance and platform investment covers the executive’s side: build vs buy, which decisions reach the head of engineering, and how platforms are funded.

The principal runs the review; the executive decides the investment

The head of engineering and the principal both “own architecture governance” in most job descriptions. They own different halves of it.

Head of engineering Principal engineer
Policy Chooses gate or advice as the default, and sponsors it Designs the mechanism: triggers, tiers, entry and exit criteria
Which decisions get scrutiny Publishes the short list of one-way doors that need executive sign-off Turns that list into triggers a team lead can apply to their own design, and rules on cases at the edge
People Gives senior engineers the time to review, in their goals and their calendars Chooses reviewers for each design, chairs, coaches reviewers who block on taste
Money Funds platforms, replacements and vendors Writes the case when reviews show the same gap in five teams; does not fund it
Record Reads the ADRs for the expensive decisions Makes sure every review ends in an ADR with conditions, owners and dates
Judged on The portfolio: what the company built, bought and kept Whether reviews caught what they should, how long they took, and whether teams came

The line that matters is money and policy. A review can say a design is unsafe, approve it with conditions, or say not yet. It cannot give a team three engineers or commit the company to a vendor. When the honest answer to a review is “this needs a team for a year”, the review’s job is to escalate, with the evidence, to the person who owns the budget. A principal who approves a design only if the team builds a shared platform on the side has taken a funding decision that was not theirs, and the team’s manager is right to object.

At Lead level, the principal or distinguished engineer owns the review system across the organisation: its shape, its reviewers, its measures, and the escalation path to the executive team.

What a review is for

A review does four jobs.

It catches the expensive mistake while it is cheap. A new primary datastore, a change on the money path, an interface twenty teams will depend on: decisions where being wrong costs a quarter.

It moves context. Will Larson, in “Managing technical quality in a codebase”, describes architecture reviews, investment strategies and tool adoption as “the organizational leverage points to inject context into decision-making.” At a few hundred engineers, most bad designs are not foolish; they are missing something another team knows.

It records why. The output of a review is a decision someone can find in a year. Michael Nygard’s architecture decision record, ADR, is the usual form.

It grows designers. A review that explains its judgement teaches what the organisation cares about; one that only judges teaches people to write for the reviewers.

Larson also puts the review in its place. In the same essay, of curating technology change through architecture reviews, he writes: “Many organizations start here, but it’s the last box of tools that I recommend opening.” His reason is a question: “How can you provide consistent architecture reviews without an articulated vision?” A review with no written technical strategy behind it is the reviewers’ taste, applied inconsistently.

Three shapes: board, forum, office hours

Shape Who decides Cadence Good at Fails by
Review board The board approves or rejects Fortnightly or monthly Consistency; one place to see risk; a record an auditor accepts A queue; designs written to pass the board
Advisory forum The author, after seeking advice Weekly, open to all Speed and ownership; decisions visible to everyone Advice skipped when inconvenient; nobody catches the one-way door
Office hours The author Drop-in, several times a week Help early, before the design hardens Invisible; depends on teams choosing to come; no record unless one is written

Andrew Harmel-Law’s description of the advice process starts from the premise that “anyone can make an architectural decision”, provided the decision-taker consults the people affected and the people with expertise. His Architecture Advisory Forum is a weekly hour where proposals are aired, and “Decisions taken to the AAF are still owned and made by the originators.”

Gregor Hohpe describes four ways to organise architecture work, from a “benevolent dictator”, through architects embedded as peers in teams and architecture as a shared team responsibility, to a failure mode he calls “inmates running the asylum”, in which architecture happens “even though no one is entirely sure how.” His point is that shape follows maturity: “Your organization has to earn its way to an effective architecture function.”

Larson’s “Scaling technical consistency” is the most practical guide to designing the group itself. On size: “If it’s six or fewer folks, it’s possible for them to gel into a true team.” On membership, he prefers fixed terms without term limits, a structured application because membership becomes a status signal, and deliberate representation so reviews are not “missing frontend and product engineers.” On failure: such groups “tend to be domineering, bottlenecks, status-oriented or inert.”

Most organisations above a few hundred engineers end with a tiered mix: office hours and the advice process for most cross-team design, and a small group with authority over a short, published list.

Triggers and entry criteria

The review starts before the meeting, at two doors.

The first door is the trigger. The RFC chapter gives a rule of thumb for which changes need which document. Your job is to make it operational, so a team lead can tell from their own design whether it goes to review. Good triggers are observable facts, not judgements. “A new datastore, queue or cache that holds production data.” “A change to an interface consumed by more than three teams.” “Anything that moves money or changes how a payment is authorised.” “A new vendor that receives customer data.” “A design that adds on-call load to another team.” “Significant” is not a trigger; every team will decide its own change is not significant.

Sort designs into tiers. Tier 1, inside one team and reversible: nothing beyond the pull request. Tier 2, crossing teams but reversible: advice from the people affected, an office-hours conversation if wanted, and an ADR. Tier 3, the one-way doors: the review. The tier-3 list should match the head of engineering’s sign-off list, and be a little wider, because some decisions need technical scrutiny without needing an executive.

The second door is the entry check. Entry criteria are what a design must contain before a session is booked. Keep them under ten, and keep each one because reviews kept asking for it:

  • The decision asked for, who the approvers are, and the date it is needed.
  • At least two options, one of them doing nothing, argued fairly.
  • Measured numbers for today and for the planned volume.
  • The rollback, and what is irreversible.
  • Failure modes and the on-call impact on every team affected.
  • A security and data section, reviewed by security when customer data is involved.
  • Evidence that the leads of affected teams have seen it.

A named reviewer checks entry within two working days and returns the design with the specific gaps, or books it. The arithmetic is the point. A design returned at the door costs the author a day. A design returned at the session cost a slot and a wait first. At Pimento, 29 of the 131 designs were sent back in the session for missing basics, each after waiting its turn in the queue.

Running the session

Four roles. The chair runs the clock and the outcome, not the design. The author owns the design and answers. Three to five reviewers are chosen for this design: someone from each team that will run or depend on it, someone who has operated something similar, and security when customer data is involved. A scribe writes the decision as it is made. For tier 3 the reviewers give the outcome and the RFC’s named approvers sit among them; in tier 2 the author decides after advice, as the RFC chapter describes.

Require the pre-read. Squarespace’s Architecture Review, which Tanya Reilly describes, “doesn’t include a presentation”; the group spends fifty minutes in discussion and the last ten deciding.

Ask about mechanism, because that is where designs fail. What happens when the new component is slow, full or gone? How do you get back, and what cannot be undone? Is every consumer idempotent, since most brokers deliver at least once, as the idempotency lesson explains? Will the vendor’s redeliveries and your own retries combine into a storm, as in retries, backoff and jitter? Who is paged, and do they know yet?

Then ask for the assumptions. Hohpe’s observation is that “Unconscious decisions often come in the form of assumptions”, and that the most important decision in a design is sometimes one its authors did not know they had made. The cards cache at Pimento rested on an assumption nobody wrote down: that a stale authorisation decision for thirty seconds was harmless. Asking “what are you assuming will stay true?” surfaces it.

Discipline yourself as a reviewer. Mark every point as blocking or preference. Speak last, because your title turns a passing remark into a requirement. Ask rather than redesign; the author owns the design, and a review that ends with the principal’s architecture has taught the team to wait for the principal. The chapter on staff philosophies covers the weight a senior title carries.

Keep the architecture review separate from the readiness review. Google’s SRE book describes a Production Readiness Review whose aim is to “Verify that a service meets accepted standards of production setup and operational readiness”. The architecture review asks whether the design is right before it is built; the readiness review asks whether what was built can be run.

Exit criteria: what leaves the room

Every session ends in one of four outcomes.

  • Approved.
  • Approved with conditions. Reilly’s “Yes, if”: a condition the author can meet without coming back. Each condition gets an owner and a date.
  • Not yet. With the specific gap named and a date to return. “Needs more thought” is not an outcome.
  • Escalated. The answer needs money, an exception to policy, or crosses a door on the executive’s sign-off list. The chair writes the escalation the same week, with the review’s evidence, to the head of engineering.

Exit criteria for the process are the checks you apply after each session. The decision is written as an ADR with status accepted, in Nygard’s five sections, title, context, decision, status and consequences; “The whole document should be one or two pages long.” Dissent is recorded with names, so a reviewer who was overruled can be shown to have been heard. The decision met the deadline you publish. And a follow-up date is set.

The follow-up is the step most processes skip. Sixty to ninety days after launch, a fifteen-minute check: was it built as decided, were the conditions closed, what surprised the team? Without it, reviewers never learn which of their concerns mattered.

Governance outside the meeting

The review is the most expensive enforcement you have: senior people, in a room, one design at a time. Larson’s advice is to “Encapsulate your approach in your workflows and tooling.” When a review raises the same finding three times, the fourth should not need a review.

  • Fitness functions. Neal Ford, Rebecca Parsons and Patrick Kua’s Building Evolutionary Architectures describes architectural fitness functions; Paula Paul and Rosemary Wang’s Thoughtworks article defines them: “Fitness functions describe how close an architecture is to achieving an architectural aim.” A check in the pipeline that fails any service in the cards domain that reads the ledger’s database directly does the review’s job on every commit.
  • Standards and linters. The rule that a machine can check belongs in a machine, as standards and code review at scale argues.
  • Paved roads. A supported template that makes the reviewed pattern the easy one, as in security champions and paved roads.
  • The radar. The head of engineering refreshes it; you bring the evidence from reviews about what designs keep proposing and what keeps failing.
  • An exceptions register. When a review approves a departure from a standard, record it with an owner and an expiry date, so exceptions do not quietly become the standard.

And when the pattern needs money, write the escalation. Five teams each building their own cache is not a review finding; it is a platform investment question, and the build vs buy memo for it belongs to the executive’s process. Your part is the evidence and the case, in the form influence and executive communication describes.

Measuring the review

Unmeasured, a review drifts into a queue or a stamp, and you will not see which.

Measure What it tells you
Time from passing the entry check to decision, median and slowest tenth Whether teams can afford to come
Share returned at the door, and at the session Whether entry criteria are known and checked
Share approved, with conditions, not yet, escalated Near 100% approved is a stamp; mostly “not yet” is a gate
Conditions closed by their date Whether “Yes, if” means anything
Bypass rate from a sample of production changes Whether teams come at all
Incidents traced to reviewed and to unreviewed tier-3 designs Whether the review catches what it exists for
A two-question author survey after each review Whether it was worth their time

The bypass sample is the measure most often missing. Each quarter, check thirty to sixty production changes against the triggers; that is how Pimento found 11 of 60 that should have come and did not. A decision within ten working days of passing the entry check is a reasonable target as a rule of thumb; publish whatever you choose and report against it.

Where practitioners disagree

Question One camp The other camp
Gate or advice? A board with authority, because some decisions are too expensive to leave to one team The advice process, because authority creates queues and teams learn to pass rather than to design well
Standing board or reviewers per design? A standing group builds shared judgement and consistency Reviewers chosen per design bring the right expertise and spread the load
Architects who review or architects who build? A dedicated architecture function sees across the company Reviewers must also build and run systems, or they lose the feedback from consequences; Larson warns that groups become domineering when members are “abstracted from the consequences”
Review early or late? A sketch, while the design can still change A full design, so reviewers have something concrete to check
Can the review block a launch? Yes, for the tier-3 list, or it is not governance No; it advises, and the decision and its accountability stay with the team and its manager

Where reviews go wrong

The queue: demand above capacity, and teams learning that going around is faster. The stamp: nearly everything approved, nothing ever “not yet”, a review that exists so a policy can say designs are reviewed. Review by redesign: the author leaves with someone else’s architecture and no ownership of it. Status, not contribution: membership becomes a mark of seniority; Larson’s fixed terms and structured selection are the remedy. Designs written to pass: every design picks the option the board likes, for the same stated reasons. The principal as the bottleneck: every tier-3 design waits for one calendar; train other chairs and rotate.

Day to day

Weekly. Two office-hours sessions of forty-five minutes, mostly early-stage designs and “does this need review?” questions. Entry checks as designs arrive, each within two working days. One review session, as chair or reviewer, with the pre-read done the day before. Thirty minutes reading the week’s new ADRs for decisions that should have come and did not.

Monthly. The metrics, published where the teams can see them. One co-review with a newer reviewer, after which you give them feedback on their comments: which blocked, which should have, which were taste. Follow-up checks on designs launched two to three months ago.

Quarterly. The bypass sample. A short retrospective on the process with the reviewer group and two or three authors, with one change to triggers or entry criteria. Evidence from reviews into the technology radar refresh. Any escalation memos the quarter’s reviews produced, sent to the head of engineering.

Yearly. Rotate part of the reviewer group at the end of fixed terms, and ask whether the shape still fits the organisation.

BY ORG SIZE
STARTUPunder 30 people

There is no review process and should not be one. The CTO and two or three senior engineers talk through anything hard to reverse at a whiteboard, and someone writes a few lines in a decisions file in the repository. The governance that matters is the list of one-way doors: the primary database, the payments provider, the tenancy model. If you are the most senior engineer, your job is to notice when one is being walked through and to ask for the decision to be written down. Anything more formal costs more than it catches.

SCALE-UP30 to 300

This is where the review is built, often by the first principal or the most senior staff engineer. Teams now collide, and nobody reads every design. Start with written triggers, an ADR folder and office hours; add a tier-3 review only when a one-way door has gone wrong or nearly did. Keep the group to six or fewer and borrow reviewers from affected teams. The executive sponsor is a VP Engineering who funds what reviews reveal. The risk is copying a large company’s board before there is enough to review.

ENTERPRISE300 and up

A board almost certainly exists, often with enterprise architects, risk and security members, and a regulatory or audit reason for existing. Your job is rarely to abolish it. It is to shrink what it hears to the real one-way doors, add a door check and a published deadline, move everything else to office hours and the advice process, and measure the bypass. Expect politics: members whose role depends on the board’s volume, and a risk team that must sign off any change to how assessments are recorded.

ARTEFACT Design an architecture review process ~75 MIN
YOU PRODUCEAn architecture review process with entry and exit criteria

Template

# Architecture review process: <organisation or domain>
Owner: <principal> · Executive sponsor: <head of engineering>
Status: draft | trial | adopted · Next review of this process: <date>

## Purpose
<Two sentences: which decisions this exists to catch, and what it does not do.>

## Tiers and triggers
| Tier | Trigger (observable fact) | Path |
|---|---|---|
| 1 | Inside one team, reversible | Pull request only |
| 2 | Crosses teams, reversible | Advice from affected teams + ADR; office hours optional |
| 3 | <one-way door triggers, listed> | Entry check, review session, ADR |

## Entry criteria (tier 3)
- [ ] Decision asked for, approvers named, date needed
- [ ] Two or more options, including doing nothing
- [ ] Measured numbers, today and at planned volume
- [ ] Rollback, and what cannot be undone
- [ ] Failure modes and on-call impact on each affected team
- [ ] Security and data section
- [ ] Affected team leads have seen it
Checked by: <role>, within <n> working days.

## The session
Cadence and length · Reviewers (max 6) and how chosen · Pre-read, no presentation
Roles: chair, author, reviewers, scribe

## Outcomes and exit criteria
Approved | Approved with conditions | Not yet (gap + return date) | Escalated
- ADR written within <n> days, dissent named
- Each condition: owner, date
- Follow-up check <n> days after launch

## Deadline
Decision within <n> working days of passing the entry check. If no session falls inside it: <fallback>.

## Escalation
To <executive> when: <money, policy exception, executive sign-off list>.

## Office hours
When, who staffs them, what gets written down.

## Measures
| Measure | Target | Reported to |
|---|---|---|
| Entry to decision, median | | |
| Returned at door / at session | | |
| Outcome mix | | |
| Conditions closed on time | | |
| Bypass rate (sample of n changes a quarter) | | |
| Author survey | | |
WORKED EXAMPLE

Saffron is a fictional accounting SaaS for small businesses: 260 people, 90 engineers in 12 teams, 140,000 paying customers whose bank feeds, invoices and VAT returns run through it. Rhea is its only principal engineer, with five staff engineers; Dawit, the VP Engineering, sponsors the process. Why now: in one half-year two teams built separate receipt-ingestion pipelines, and a ledger schema change broke bank-feed reconciliation for three days.

Tiers. Tier 3 triggers: a new datastore, queue or cache holding production data; any change to the ledger schema or ledger API; anything touching tax submissions; a new vendor receiving customer financial data; a design adding on-call load to another team. Everything else crossing teams is tier 2: advice from the affected leads and an ADR.

Entry. The seven criteria in the template, checked by Rhea or the staff engineer on rota within two working days.

Session. Monthly, 90 minutes, at most two designs. Reviewers: Rhea, two staff engineers on six-month terms, one engineer from each affected team, security when customer financial data is involved; six at most. Pre-read, no slides, the last ten minutes for the decision.

Exit. One of four outcomes; ADR within two working days, dissent named; follow-up 60 days after launch.

Deadline. Ten working days from passing entry. If the monthly session is further away, Rhea books a 60-minute slot.

Escalation. To Dawit for headcount, vendor spend, or anything on his sign-off list.

Office hours. Tuesday and Thursday, 45 minutes, staffed by Rhea and one staff engineer; a one-line note in the ADR index.

First six months. Nine tier-3 reviews, three in extra slots; 41 office-hours conversations; median seven working days from entry to decision; two designs returned at the door, none at a session; one escalation, the duplicated ingestion pipelines, for which Dawit funded two engineers for a quarter to merge them. Bypass sample: 30 changes a quarter, one miss found, a cache added to the invoicing service, now an ADR. Next review of the process: month twelve.

Now you

You are a principal engineer at Pimento, a digital bank: 1,100 people, 320 engineers in 38 teams across six domains, 2.4 million customers. Its architecture review board has nine members, meets fortnightly for two hours and hears four designs a session, about 104 a year. Last year 131 were submitted; the median wait was 34 days; 29 were sent back in the session for missing basics. Your sample of 60 production changes found 11 that met the board’s triggers and never went to it, including the cards cache change behind a 47-minute sev-1. Emeka, the CTO, wants a replacement process within a month. Complications: the bank’s technology risk policy requires a recorded technical assessment for changes to important business services, so the risk team will not accept advice alone for those. Quentin, the enterprise architect who chairs the board, and his two colleagues see a smaller board as removing their role. Paolo’s team wants a promise that no design waits more than two weeks. Write the process: which designs go where, how the risk requirement is met, what the enterprise architects do, and how you will know in six months whether it works.

Self-check

DECIDE

You are a principal engineer at Pimento, a digital bank with 320 engineers in 38 teams. Its architecture review board of nine meets fortnightly and hears four designs a session, about 104 a year. Last year 131 were submitted, the median wait was 34 days, and in a sample of 60 production changes you found 11 that met the board's triggers but never went to it, one of them the card-authorisation cache behind a 47-minute sev-1. The bank's risk policy requires a recorded technical assessment for changes to important business services. Emeka, the CTO, asks: keep the board, or replace it with office hours?

READING
  1. POST
    Scaling the Practice of Architecture, Conversationally Andrew Harmel-Law, 2021

    The advice process and the Architecture Advisory Forum, described by someone who ran them, including why the forum advises and does not decide. The working alternative to a board, and the source for the office-hours half of a tiered process.

  2. POST
    Scaling technical consistency Will Larson, 2018

    How to design an architecture group: influence, interface, size, terms, selection and representation, and its four failure modes. Read it before you choose who sits on your review.

  3. POST
    Managing technical quality in a codebase Will Larson, 2020

    Where architecture reviews sit among the other tools for quality, and why Larson opens that box last. The case for moving repeated review findings into tooling.

  4. POST
    Would you like architects with your architecture? Gregor Hohpe

    Four ways to organise architecture work, from a central dictator to architecture done inside teams, and why an organisation earns its way along that line. Use it to decide which shape fits your company now.

  5. POST
    Your most important architecture decisions might be the ones you didn't know you made Gregor Hohpe, 2020

    Why the decisions that matter often arrive as unstated assumptions. The reason a reviewer asks for the assumption list before discussing the diagram.

  6. POST
    Documenting Architecture Decisions Michael Nygard, 2011

    The original ADR: five sections, one or two pages, superseded rather than edited. The record every review in this chapter ends with.

  7. POST
    The Power of 'Yes, if': Iterating on our RFC Process Tanya Reilly, 2019

    A principal engineer's account of a review that works: a small group, no presentation, fifty minutes of discussion and ten of decision, and conditional approval.

  8. BOOK
    The Evolving SRE Engagement Model Acacio Cruz and Ashish Bhambhani

    Google's Production Readiness Review and how it moved earlier into design and then into frameworks. The sibling of the architecture review, and a model for replacing reviews with defaults. Read: Site Reliability Engineering (O'Reilly, 2016), chapter 32.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: The principal and the business: build vs buy, vendors, the frontier →