PRINCIPALCHAPTER 35

Open radio networks and the changing vendor market

Open RAN promises to split a base station into parts you can buy from different vendors. Learn what it opens, what it costs to integrate, and what it changes for an operator, a host and the virtual operators on it

50 MINHOW MOBILE NETWORKS WORKUPDATED 2026-11-13
PREDICT

Lumora Mobile is pricing 400 rural sites for five years. The integrated bid costs $102,000 a site over that time (equipment, installation, support and energy). The open bid has equipment 20% cheaper, but per-site integration costs 15% of its equipment price, support costs a little more, and Lumora must also fund a $1.5 million test programme and a $400,000-a-year integration team. Which is cheaper over five years?

You met the parts of a gNB in The radio access network: the radio unit (RU) at the antenna, the distributed unit (DU) with the real-time scheduler, and the central unit (CU) that speaks to the core. This chapter is not about how they work. It is about who sells them, what happens when different vendors sell different ones, and how to judge the claims made for that.

What “open” covers

Open RAN (radio access network) is a label for three separate ideas. They arrive together in marketing and can be bought apart.

Idea What it means What you gain What it costs
Open interfaces The links between the RU, DU and CU follow a published specification, so parts from different vendors can connect Choice of supplier for each part; a way to introduce a new supplier Integration and testing across vendors; fault-finding across vendors
Virtualised or cloud RAN The DU and CU run as software on general-purpose servers, often with an accelerator card for the hardest signal processing Software upgrades without new hardware; shared servers Servers, accelerators and an operations team that can run them; the power the servers draw
Intelligence A RAN intelligent controller (RIC) runs applications that read the radio network’s data and change its settings Operator-written or third-party optimisation A new place for things to go wrong; a question about who approved the change

3GPP defines some of the interfaces and the O-RAN Alliance defines others. The Alliance is an operator-led industry group formed in 2018. It writes specifications for the fronthaul, the controller interfaces and the management of the cell. 3GPP defines the gNB as a CU and DUs, with the F1 interface between them (TS 38.401 for the architecture and TS 38.473 for the F1 application protocol), and the E1 interface between the CU’s control and user parts (TS 38.463).

The labPhoneUERANSIM uegNB: one programRU + DU + CU in softwareCoreOpen5GSsimulated airUDP 4997N2 and N3NGAP, GTP-UAn open, split RANRIC: near-real-timeSMO: non-real-time RICA1RUat the antennaDUreal-time schedulerCUcontrol and user dataCoreopenfronthaulF1NGE2E2O1: management of the RAN partsThe lab has one box where an open RAN has three. It has NG, and none of F1, the fronthaul or E2.

Three consequences follow from the table, and a procurement document that blurs them is hiding something.

First, you can have cloud RAN with no second vendor. An integrated vendor can ship its baseband as software on servers and call it open-capable. Second, you can have open fronthaul with no cloud: a vendor’s DU can speak the open fronthaul to a different vendor’s RU on purpose-built hardware. Third, the “open” figure in a market report depends on how the report counts. Always ask which of the three ideas a number measures.

The one boundary the lab already shows

In the lab, the cell and the core are different programs. gnb is UERANSIM, a simulator by one author. amf and the other functions are Open5GS, written by others. They share no code. They work together because the interface between a base station and a 5G core is standardised: NGAP over SCTP for signalling (TS 38.413) and GTP-U over UDP for user data (TS 29.281), and each side implements the document. Section 3 of the lab has you read the first message that crosses it.

That is the point to hold on to. A multi-vendor boundary that works is a standard, plus a test programme, plus years of operators finding differences. NG has had that. An operator can buy a RAN from one vendor and a core from another today, and many do. Open RAN is a bet that F1, E1 and the fronthaul can reach the same state, and the question for a buyer is how far each has got.

The fronthaul, and why it is the hard boundary

F1 and E1 are between software functions that do not have microsecond deadlines. The fronthaul is different. The O-RAN Alliance’s specification for the DU to RU link, the Control, User and Synchronization Plane specification, defines a split inside the physical layer, called 7-2x (often written 7.2x): the radio unit does the lowest signal processing and the DU does the rest. The three planes carry what the RU must do and when (control), the radio samples themselves (user) and the common timing (synchronisation). The synchronisation plane is there because radio units must share timing precisely: on a time-division carrier, such as the 3.5 GHz TDD spectrum module 2 described, units that are out of step interfere with each other.

That explains where the cost is.

  • It is sized by the radio, not by the users. Backhaul carries what subscribers send. Fronthaul at a split inside the physical layer is sized mainly by the carrier’s bandwidth and the number of antenna streams, so the link must be planned for the cell’s configuration, not for its average traffic.
  • It wants fibre or an equally clean link. It cannot sit on a shared, congested path. Where fibre is cut, which the module 4 chapter Transmission, backhaul and tower sharing takes up, a design that depends on short, fixed-delay links needs a plan for what happens at a cut.
  • A fault crosses vendors. A radio unit from one vendor, a DU from another and a timing source from a third can each cause the same symptom: a cell that comes up and carries nothing. Each vendor’s tools show their own part as healthy. The operator or an integrator must hold the picture across all three.

The mistake to avoid is treating the interface specification as the product. The specification says what the messages mean. It does not say who tests the pairing, who updates which part first, or who is called at 03:00.

Intelligence in the radio network

The O-RAN architecture adds a place for applications. A near-real-time RIC runs xApps, applications that act on a control loop of roughly 10 ms to 1 s, over an interface called E2 that connects it to the DU and CU. A non-real-time RIC sits in the service management and orchestration layer (SMO), runs rApps on loops slower than 1 s, and pushes policies and models to the near-real-time RIC over A1. O1 carries management and data collection to every part. Polese and colleagues’ survey, in the Reading list, sets all of this out. Typical applications are traffic steering between cells, energy saving by switching off carriers when traffic is low, and interference management.

Two judgements matter more than the architecture.

The first is that these applications are optimisers, and optimisers have the problems you will read about in module 4’s chapter on AI in network operations. Two xApps can change the same setting for opposite reasons, and research has proposed schedulers to mitigate the conflicts. A change that saves energy at 02:00 could leave a market town short of capacity at 19:00, when traders are online. The question is not whether the xApp works in a lab. It is who approved it, how it is switched off, and how the operator sees what it did.

The second is that the intelligence is the newest of the three ideas. In the analyst’s forecast below, cloud RAN grows to a larger share than multi-vendor deployments, and the RIC is a further step on top of both. An operator that buys an Open RAN for the RIC should ask for a deployed reference, a commercial network where the application runs, and not a demonstration.

The vendor market and why Open RAN got attention

Radio equipment is a concentrated market. Dell’Oro Group, an industry analyst, reported that the top five RAN suppliers by worldwide revenue in 2024 were Huawei, Ericsson, Nokia, ZTE and Samsung, with no change in ranking from 2023as of 2026-11. The same release says the market was down nearly $9 billion from its 2021 peak. A buyer in that market has four or five choices. Governments have acted on that concentration: the UK government published a 5G supply chain diversification strategy in late 2020, with an initial £250 million announced to support Open RAN trials and a test facility, aimed at widening the choice of suppliersas of 2026-11.

Open RAN is the industry’s answer, and the figures show how slowly it moves. Dell’Oro’s August 2024 forecast put Open RAN above 25% of the total RAN market by 2028, cloud RAN at 20 to 25% and multi-vendor RAN below 10%; its analyst said Open RAN is happening but the vision that it will significantly change vendor dynamics is fadingas of 2026-11. A February 2026 update raised the Open RAN outlook while lowering multi-vendor RAN to below 5% of the market by 2030as of 2026-11. Forecasts move, so check the analyst’s current ones.

Two cases show what “open” has meant in practice.

  • A new network built open. Rakuten Mobile in Japan launched commercial service in April 2020 on what it described as the world’s first Open RAN network. Rakuten’s own subsidiary, Rakuten Symphony, says its approach saves 40% of capital spending and 30% of operating spending against a traditional RAN, and that an independent analyst verified the figuresas of 2026-11. Treat them as the seller’s claims. A company building a new network with no old equipment to carry, and a vendor that sells the same approach, is not a neutral witness, and trade press has questioned how far the result travels (Light Reading’s “Rakuten Mobile and a tale of failed telecom disruption” is in the reading list).
  • An old network moving. In December 2023 AT&T announced a five-year arrangement with Ericsson worth up to about $14 billion, with a goal of 70% of its wireless traffic on its open RAN platform by the end of 2026as of 2026-11, and Light Reading reported that the commitment left out Nokia, a long-time AT&T supplieras of 2026-11. Read that for what it is. The largest Open RAN announcement in the United States went to one incumbent vendor that agreed to build open interfaces. It was a lever on price and direction, and it was not a mix of vendors on one site.

The reading is that Open RAN has been worth most as a negotiating position and in two kinds of network: new ones with nothing to migrate, and ones where equipment cost in thinly served places decided the case. In Africa, MTN Group announced at AfricaCom in 2019 a plan to add more than 5,000 rural sites across its 21 operations using Open RAN technology, with more than 200 commercial rural sites already deployedas of 2026-11, and a vendor, Parallel Wireless, said in January 2024 that it had deployed Open RAN at 1,500 sites across eight African countries, Nigeria among themas of 2026-11. Neither report says how the cost compared with the alternative, which is the number you would need.

What integration costs

An operator that buys from several vendors takes on the integrator’s job. It can do it itself, pay a systems integrator, or ask one vendor to carry it. Each is a cost line, and the cost has a shape.

  • Fixed costs. A test lab, interoperability trials for each pairing, tooling to monitor all vendors’ parts together, and a team that knows all of them. These do not depend on whether you build 50 sites or 5,000.
  • Per-site costs. More commissioning time, because there are more boxes and more settings, and more truck rolls when a fault could be in any of them.
  • Running costs. Each vendor releases software on its own timetable, so every upgrade is a test of the whole combination. Support is several contracts, and a fault that two vendors each say is the other’s costs engineer time.
  • Energy. General-purpose servers with accelerators draw power, and evidence on whether an open build uses more or less than an integrated one is mixed: an ABI Research analysis hosted by an Open RAN vendor models open radios as using less power than legacy ones, with results that depend on its assumptionsas of 2026-11, while a 2025 measurement study of O-RAN functional splits measures power across O-RAN functional splits on a testbed and reports that consumption does not scale significantly with network loadas of 2026-11. At a site on diesel or solar, the energy line is a large part of its cost, so a difference of a few per cent is worth knowing.

The published studies disagree, and each is written by someone with something to sell. An Analysys Mason study for Wind River, a software supplier, in 2022 finds that Open RAN could deliver savings of up to 30% in total cost of ownership for operators with the right platform strategy and skill setas of 2026-11. NEC’s 2021 white paper, from an Open RAN supplier, models a 23 to 27% reduction in total cost of ownership over ten yearsas of 2026-11. Ericsson told the US regulator that, by its own estimates, Open RAN costs more than an integrated RAN, in part because of systems-integration costas of 2026-11. An open-RAN vendor, an integrator-friendly consultancy and an incumbent each have a view that suits them.

Do not argue with the studies. Build the model with your own quotes, and find which assumption decides the answer. That is the lab.

What it means for an operator, a host and a virtual operator

For an operator with a large, mixed fleet. The question is scale and sequence. In the lab model, open pays only above a break-even number of sites, and below it the fixed costs dominate. An operator with thousands of sites can amortise a test lab. It can also use the credible threat of a second supplier to improve an integrated bid. The sensible first steps are low-risk ones: write open-interface conformance into the contract, pilot a second radio supplier on a small cluster of sites, and keep the integrated vendor accountable for the whole.

For a host. Lumora Mobile’s choice is also a choice about how much of the risk it passes on. A host that moves to a multi-vendor RAN takes on the integration costs and the fault-finding, and its virtual operators feel the result in coverage and quality, not in a bill.

For a virtual operator. Kolanut Mobile owns no radio. In the NCC’s framework for virtual operators, a Tier 3 operator (the tier with its own switching and interconnect elements) still relies on its host for radio access, and no virtual operator owns spectrum (section 4.1)as of 2026-11. At Tier 1 in its launch year, and at Tier 2 later, it relies on Lumora for the radio as completely, and for the core as well. The radio reaches it through four things it can ask for in the host agreement, which The MVNO Business course covers as a contract.

  1. Notice. How long before Lumora changes a RAN vendor in an area where Kolanut’s traders are, and what Lumora will do if coverage drops during the change.
  2. Comparable measures. Whether cell identifiers, counters and the quality pack stay comparable across vendors, so a fall in a market town’s data quality after 19:00 can be found. The Quality of service chapter taught you the figures; a vendor change can break the series.
  3. Automatic changes. Which automatic changes the host’s RAN may make at a site Kolanut depends on, such as shutting a carrier at night, and how Kolanut finds out.
  4. One accountable party. When a multi-vendor site fails, which Lumora team answers and in what time. Kolanut should never be the one deciding whether the fault is the radio unit’s or the DU’s.

Tonbara’s reply to the notice is a list of these four, with an ask for the date and a named contact for each. It costs Kolanut nothing to send and gives Lumora a reason to say what it knows.

LAB Read the cell, find the open boundary, and price a split RAN ~50 MIN
YOU NEEDDocker with Compose v2 (steps 1 to 3a read files and traces and work on any machine, including one without SCTP)Python 3.9 or later (steps 4 and 5)SCTP in the kernel and the live core, for step 3b only

You will read the lab’s cell configuration, see what the cell does on each of the lab’s networks, read the first message across the one open boundary the lab has, and then write a cost model for a split RAN. Work in labs/telecoms. Step 3b needs the live core, and its output is quoted from a recorded run. Everything else runs on any machine.

1. Read the cell’s configuration (any machine). The simulated cell is one file. Read it, and read the part of the AMF’s file it must agree with.

cat ran/gnb.yaml
grep -A8 "tai:" core/amf.yaml
# The simulated base station (gNB). UERANSIM simulates the radio: the phone
# reaches it over UDP on the "air" network instead of over spectrum.
mcc: '999'
mnc: '70'
nci: '0x000000010'   # NR cell identity, 36 bits: gNB id + cell number
idLength: 32
tac: 1               # tracking area code; must match the AMF's tai
linkIp: 10.32.0.50   # radio side: where phones find this cell
ngapIp: 10.33.0.50   # N2: signalling to the AMF
gtpIp: 10.33.0.50    # N3: user data to the UPF
amfConfigs:
  - address: 10.33.0.5
    port: 38412
slices:              # slices this cell supports; the AMF allows a phone only these
  - sst: 1
  - sst: 3
ignoreStreamIds: true

and, for the AMF:

  tai:
  - plmn_id:
      mcc: 999
      mnc: 70
    tac: 1
  plmn_support:
  - plmn_id:
      mcc: 999
      mnc: 70

Sort each line of gnb.yaml into three groups: what belongs to the radio side (RU and DU), what belongs to the CU’s link to the core, and what is a promise made to the core that the two files must keep. linkIp is the radio side. ngapIp, gtpIp and amfConfigs are the CU’s link to the core. mcc, mnc, tac, nci and slices are what the cell tells the core about itself, and the AMF checks them. In a real split RAN, a vendor’s configuration for each of the three boxes would hold its own part of this, and somebody has to keep the three consistent.

2. See what the cell does on each network (any machine with Docker). The capture records all three lab networks. Count the frames on each, with the protocol, for the reference trace.

docker run --rm -v "$PWD/traces:/t:ro" nicolaka/netshoot:v0.13 sh -c \
  "tshark -r /t/attach-and-browse.pcapng -T fields -e frame.interface_name -e _ws.col.Protocol 2>/dev/null | sort | uniq -c | sort -rn"
docker run --rm -v "$PWD/traces:/t:ro" nicolaka/netshoot:v0.13 sh -c \
  "tshark -r /t/attach-and-browse.pcapng -Y 'udp.port==4997' -T fields -e ip.src -e ip.dst 2>/dev/null | sort | uniq -c"
    779 atlas-core	TCP
     85 atlas-air	UDP
     18 atlas-core	PFCP
     16 atlas-core	SCTP
     10 atlas-core	NGAP/NAS-5GS
      9 atlas-air	ARP
      8 atlas-dn	TCP
      8 atlas-core	GTP <TCP>
      8 atlas-core	ARP
      6 atlas-dn	ICMP
      6 atlas-core	GTP <ICMP>
      4 atlas-dn	ARP
      4 atlas-core	SSL
      4 atlas-core	NGAP
      2 atlas-dn	HTTP
      2 atlas-core	GTP <HTTP>

and, for the second command, 43 frames from 10.32.0.50 to 10.32.0.60 and 42 the other way. The cell touches all three networks. On atlas-core it speaks NGAP over SCTP (the SCTP, NGAP and NGAP/NAS-5GS rows) and carries the phone’s packets in GTP-U (the GTP rows). On atlas-air it exchanges 85 UDP frames with the phone, all on port 4997, the lab’s stand-in for the radio. The 85 on atlas-air match the 85 UDP frames from the filter, so every UDP frame on the air network is that link. A real air interface cannot be captured with an Ethernet capture. A real open fronthaul can, because it runs over Ethernet, and that is part of its appeal: you can see what the RU and DU said to each other. The lab has nothing in that place, because UERANSIM has no radio unit and no physical layer.

3. Two projects, one interface (3a and the trace reading work on any machine; 3b needs the live core). First, see that the cell and the core are different images.

grep -E "^\s*image:" compose.yaml | sort | uniq -c
      1     image: busybox:1.36
      2     image: gradiant/ueransim:3.2.6
      1     image: mongo:6.0
      1   image: gradiant/open5gs:2.7.2

The core’s functions share the open5gs image through a YAML anchor, which is why it appears once. The cell and the phone are ueransim. Two projects meet at NG.

Then read the first message across the boundary. The only trace that keeps the cell’s start-up is fault-2, one of the traces module 3’s project hands you. This step does not ask you to diagnose anything; it asks you to read what a cell says about itself, so it prints only the cell’s first message. Print the lines of the NG Setup Request that name the node, the network and the slice.

docker run --rm -v "$PWD/traces:/t:ro" nicolaka/netshoot:v0.13 tshark -r /t/fault-2.pcapng \
  -Y 'frame.number==85' -V 2>/dev/null | grep -E "procedureCode|GlobalRANNodeID:|gNB-ID: gNB-ID|RANNodeName:|Mobile (Country|Network) Code|sST|PagingDRX:|protocolIEs|Item [0-9]: id-"
scripts/ladder.sh traces/fault-2.pcapng --filter 'frame.number==85'
            procedureCode: id-NGSetup (21)
                    protocolIEs: 4 items
                        Item 0: id-GlobalRANNodeID
                                    GlobalRANNodeID: globalGNB-ID (0)
                                                Mobile Country Code (MCC): Private network (999)
                                                Mobile Network Code (MNC): Unknown (70)
                                            gNB-ID: gNB-ID (0)
                        Item 1: id-RANNodeName
                                    RANNodeName: UERANSIM-gnb-999-70-1
                        Item 2: id-SupportedTAList
                                                                Mobile Country Code (MCC): Private network (999)
                                                                Mobile Network Code (MNC): Unknown (70)
                                                                            sST: 01
                        Item 3: id-DefaultPagingDRX
                                    PagingDRX: v128 (2)

and the ladder shows the one line 7.761 gNB -> AMF NGAP NGSetupRequest. Four items: the node’s identity (PLMN 999/70 and a gNB identifier, 1, which matches nci and idLength in step 1), its name, the tracking areas and slices it supports, and its paging cycle (v128, 1.28 s). That list is the interface’s contract: the cell tells the core who it is and what it serves, and the core accepts or refuses. The trace lists one slice (SST 1), where the gnb.yaml you read in step 1 lists two, so do not expect every value to match your file. Comparing the rest, and what the core did with this request, belongs to the project, and this chapter leaves it there.

Now the healthy case, which needs the live core.

docker compose up -d
docker compose logs gnb | grep "NG Setup"
scripts/metrics.sh

Recorded on 2026-11-12 and 2026-11-13. Compose puts the service name in front of each log line, and your timestamps differ. The gNB log shows

[2026-11-12 01:09:22.990] [ngap] [debug] Sending NG Setup Request
[2026-11-12 01:09:23.067] [ngap] [debug] NG Setup Response received
[2026-11-12 01:09:23.068] [ngap] [info] NG Setup procedure is successful

The Response came 77 ms after the Request. scripts/metrics.sh on an idle core (no phones) printed ## amf (10.33.0.5:9090) followed by gnb 1, then empty headings for the SMF, UPF and PCF: the AMF counts one cell connected, and nothing else has happened yet. The AMF’s own count is the operator’s first sign that a cell has joined. In a split RAN, the equivalent for the DU and RU is what an operator would add to its monitoring.

4. Price a split RAN (any machine with Python). Save this as ran_cost.py in a folder of your own, for example ~/mywork, outside the lab’s scripts/. It is standard library only. Every number in it is illustrative: they are the chapter’s assumptions, not quotes, so replace them with yours before you believe an answer.

#!/usr/bin/env python3
"""Five-year cost per site: one integrated RAN vendor against an open,
multi-vendor RAN. Every figure is illustrative (US dollars); replace them
with your own quotes before you believe any answer."""
from dataclasses import dataclass, replace


@dataclass(frozen=True)
class Plan:
    equipment: float = 60_000      # integrated bid per site: radios, baseband, software
    open_discount: float = 0.20    # how far below that the open bid's equipment sits
    install_integrated: float = 0.05   # vendor installs and commissions, share of equipment
    install_open: float = 0.15     # per-site integration and test, share of open equipment
    support_integrated: float = 0.08   # yearly support, share of equipment price
    support_open: float = 0.10     # several contracts, so a higher share
    programme: float = 1_500_000   # one-off: test lab, interoperability trials, tooling
    team_per_year: float = 400_000 # engineers who own the integration, per year (open only)
    energy_kwh: float = 12_000     # radio equipment's use per site per year
    energy_open_extra: float = 0.10    # open build uses this much more (evidence is mixed)
    price_kwh: float = 0.25        # dollars per kWh at an off-grid or hybrid site
    years: int = 5


def per_site(p: Plan, sites: int):
    """Return (integrated, open) five-year cost per site."""
    energy = p.energy_kwh * p.price_kwh * p.years
    integrated = (p.equipment * (1 + p.install_integrated)
                  + p.equipment * p.support_integrated * p.years + energy)
    eq_open = p.equipment * (1 - p.open_discount)
    open_ = (eq_open * (1 + p.install_open)
             + eq_open * p.support_open * p.years
             + energy * (1 + p.energy_open_extra)
             + (p.programme + p.team_per_year * p.years) / sites)
    return integrated, open_


def break_even_sites(p: Plan):
    """Smallest number of sites at which the open plan is no dearer, or None."""
    for n in range(1, 100_001):
        a, b = per_site(p, n)
        if b <= a:
            return n
    return None


def break_even_discount(p: Plan, sites: int):
    """Smallest open discount (to the nearest 0.1 point) at which open wins."""
    for tenths in range(0, 1000):
        d = tenths / 1000
        a, b = per_site(replace(p, open_discount=d), sites)
        if b <= a:
            return d
    return None


if __name__ == "__main__":
    base = Plan()
    print("Five-year cost per site (US$, illustrative)")
    print(f"{'sites':>6} {'integrated':>11} {'open':>9} {'open vs integrated':>19}")
    for n in (50, 250, 400, 1000, 5000):
        a, b = per_site(base, n)
        print(f"{n:>6} {a:>11,.0f} {b:>9,.0f} {100 * (b - a) / a:>+18.1f}%")
    print(f"\nBreak-even: open is no dearer from {break_even_sites(base):,} sites")

    print("\nDiscount the open bid needs at 400 sites, by per-site integration cost")
    for pct in (0.05, 0.10, 0.15, 0.20, 0.30):
        d = break_even_discount(replace(base, install_open=pct), 400)
        text = "never (under 100%)" if d is None else f"{100 * d:.1f}%"
        print(f"  integration {100 * pct:>4.0f}% of equipment -> discount {text}")

    print("\nOne change at a time, 400 sites: open cost per site, then against integrated")
    a, b0 = per_site(base, 400)
    changes = [
        ("baseline", {}),
        ("discount 10%", {"open_discount": 0.10}),
        ("discount 30%", {"open_discount": 0.30}),
        ("integration 30%", {"install_open": 0.30}),
        ("no extra energy", {"energy_open_extra": 0.0}),
        ("energy +30%", {"energy_open_extra": 0.30}),
        ("no team after year 1", {"team_per_year": 80_000}),
        ("programme x2", {"programme": 3_000_000}),
    ]
    for label, kw in changes:
        a, b = per_site(replace(base, **kw), 400)
        print(f"  {label:<22}{b:>9,.0f}  {100 * (b - a) / a:>+6.1f}%")
python3 ran_cost.py
Five-year cost per site (US$, illustrative)
 sites  integrated      open  open vs integrated
    50     102,000   165,700              +62.5%
   250     102,000   109,700               +7.5%
   400     102,000   104,450               +2.4%
  1000     102,000    99,200               -2.7%
  5000     102,000    96,400               -5.5%

Break-even: open is no dearer from 556 sites

Discount the open bid needs at 400 sites, by per-site integration cost
  integration    5% of equipment -> discount 17.5%
  integration   10% of equipment -> discount 20.1%
  integration   15% of equipment -> discount 22.5%
  integration   20% of equipment -> discount 24.8%
  integration   30% of equipment -> discount 29.0%

One change at a time, 400 sites: open cost per site, then against integrated
  baseline                104,450    +2.4%
  discount 10%            114,350   +12.1%
  discount 30%             94,550    -7.3%
  integration 30%         111,650    +9.5%
  no extra energy         102,950    +0.9%
  energy +30%             107,450    +5.3%
  no team after year 1    100,450    -1.5%
  programme x2            108,200    +6.1%

The figures are deterministic, so yours match to the digit. Read them as a shape. At 50 sites the fixed costs ($3.5 million over five years, or $70,000 a site) swamp a $12,000 equipment saving: open costs 62.5% more. The break-even is 556 sites, so the 400-site rural build of the chapter’s opening is a little below it. The discount the open bid needs to match the integrated one rises with the integration cost, from 17.5% at 5% to 29.0% at 30%, which is why studies with different integration assumptions can reach opposite answers. The one-change-at-a-time table says what to negotiate: at 400 sites a ten-point change in the discount moves the answer by about ten points either way, the integration cost by seven, and the fixed costs and the energy assumption by three to four. The model leaves out what could matter most: the cost of a site being down while two vendors disagree about whose fault it is.

5. Check what the model says about energy and size (any machine with Python). Use the file from step 4 to answer a question the table does not: what discount makes the 400-site build break even if the open build draws no more power, and what if it draws 30% more?

python3 -c "
import ran_cost as r
from dataclasses import replace
for extra in (0.0, 0.10, 0.30):
    p = replace(r.Plan(), energy_open_extra=extra)
    print(f'energy +{100*extra:.0f}%: discount needed at 400 sites', f'{100*r.break_even_discount(p, 400):.1f}%')"
energy +0%: discount needed at 400 sites 21.0%
energy +10%: discount needed at 400 sites 22.5%
energy +30%: discount needed at 400 sites 25.6%

Each ten points of extra energy draw needs about one and a half more points of equipment discount at this site size and energy price. The effect is small beside the integration assumption, and it grows with the price of power, so at a site that burns diesel for most of its energy, run the model again with the real price.

Make the cost of integration someone else’s problem. Set the programme and the team to zero, as if a systems integrator carried them under a fixed price, and run the model for 50, 400 and 5,000 sites:

python3 -c "
import ran_cost as r
from dataclasses import replace
p = replace(r.Plan(), programme=0, team_per_year=0)
for n in (50, 400, 5000):
    a, b = r.per_site(p, n)
    print(n, round(a), round(b))"

It prints 50 102000 95700, 400 102000 95700 and 5000 102000 95700: open is 6.2% cheaper at every size, with no break-even at all. The fixed costs did not vanish; they moved into a contract. Write the two sentences you would need from a systems integrator before you believed it: what price it is quoting for the programme and the team, and what it will do about a fault at 03:00 that its own part did not cause. Then say which of the two Lumora, and not Kolanut, would carry if the integrator failed.

DECIDE

Sotonye has two bids for 400 rural sites. The integrated vendor's bid costs $102,000 a site over five years. The multi-vendor open bid has equipment 20% cheaper, but needs a $1.5 million test programme and a $400,000-a-year integration team that Lumora Mobile does not yet have. In the chapter's model the open bid comes out 2.4% dearer at 400 sites. The finance director wants the lower equipment price, and Lumora expects to build more rural sites over the next three years. What does Sotonye recommend?

READING
  1. PAPER
    Understanding O-RAN: Architecture, Interfaces, Algorithms, Security, and Research Challenges Michele Polese, Leonardo Bonati, Salvatore D'Oro, Stefano Basagni, Tommaso Melodia, 2023

    The clearest single account of the O-RAN architecture by researchers rather than sellers, covering the near-real-time and non-real-time loops this chapter names. Read the architecture and interface sections; skip the algorithm and testbed detail on a first pass. Read: the architecture and interfaces sections (RIC, xApps, rApps, E2, A1, O1) and the security discussion.

  2. DOC
    O-RAN ALLIANCE overview O-RAN ALLIANCE

    The Alliance's own summary of what it specifies and which working group does what, useful for seeing where the fronthaul, the controller and the management interfaces are defined. It is the organisation's view of itself, so read it for the structure and not for its claims about adoption.

  3. DOC
    ETSI TS 103 859: O-RAN Fronthaul Control, User and Synchronization Plane Specification ETSI, from the O-RAN ALLIANCE

    The open fronthaul specification itself, in the free ETSI publication of the O-RAN Alliance text. Read the overview of the three planes; the message tables are for implementers. It is one version of a document the Alliance keeps revising, so check for a newer one.

  4. DOC
    3GPP TS 38.401: NG-RAN; Architecture description 3GPP

    The standard's description of the gNB as a CU and DUs, with the F1 and E1 interfaces. Read the overall architecture clause to see what 3GPP defines and what it leaves to others. Read: the overall architecture and the CU, DU and CU-CP and CU-UP descriptions.

  5. DOC
    3GPP TS 38.413: NG-RAN; NG Application Protocol (NGAP) 3GPP

    The interface the lab's cell and core share. Read the NG Setup procedure and its failure cases to see the contract you looked at in step 3; skip the handover and paging procedures first time. Read: the NG Setup procedure and the NG Setup Request and Failure message definitions.

  6. POST
    Dell'Oro Group: North America Leading the Open RAN Movement Dell'Oro Group, 2024

    An industry analyst's forecast and its caveat that Open RAN is progressing while its effect on the vendor market is smaller than hoped. The figures are from August 2024 and later updates differ, so use it to see how a forecast is framed and look for the current one.

  7. POST
    Rakuten Mobile and a tale of failed telecom disruption Light Reading

    A critical trade-press view of the Open RAN showcase, useful beside the company's own account of its savings. Read it for the questions it raises about whether a greenfield result carries to other operators; weigh its argument as you would the company's.

  8. DOC
    NCC: License Framework for the Establishment of Mobile Virtual Network Operators in Nigeria Nigerian Communications Commission

    The primary source for what each virtual operator tier owns and relies on the host for, including radio access. Read section 4 for the tiers; the fees and procedures belong to the MVNO Business course.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: What not to build →