FOUNDATIONSCHAPTER 03

A network engineer's week

Where a network engineer's hours go across watching, changing, fixing, proving and building, what a change window really costs, and how to order a week by what cannot move

35 MINNETWORK ENGINEERUPDATED 2026-11-21
PREDICT

Crustwell's head office has a two-hour change window on Tuesday night to update its pair of firewalls. About how much of your week does that one change use, counting everything it needs to go well?

Ask a network engineer what they did last week and you often hear a list of events: a change on Tuesday night, a fault on Wednesday, a meeting about Thursday’s audit. The week fills from the outside in, and what gets squeezed is the work that makes the next change safer: the plan, the rollback, the diagram, the record.

A network engineer’s week has a shape no other engineering week has. A large part of the work happens when nobody else is working, because changing a network means interrupting the thing everyone else uses. So there are two clocks. The day clock runs through stand-ups, tickets and projects. The night clock runs through change windows, often after the office empties or when a factory line stops. Your calendar has to hold both, and the second one costs more than it looks.

This chapter follows Hajara at Crustwell, the packaged food and drink company with 2,200 staff, a head office in Lagos and a factory at Agbara in Ogun. Crustwell also has a second factory, which came with last year’s acquisition of a biscuit maker, and one cloud tenancy that holds its ERP. Three network engineers serve all of it, reporting to the head of IT infrastructure. The team size, the hours and the audit details in this chapter are illustrative. They show the method, not a benchmark.

It sits beside An SRE’s week, which is about balancing operational work against projects across a rotation, and A designer’s week, which orders a week by what other people are waiting for. Yours combines the two: a rotation of watching, and fixed points set by people and machines you do not control.

The model: five kinds of network time

A network engineer’s hours fall into five kinds. They do not substitute for each other.

Watching. Alerts, the monitoring dashboards, the morning look at what happened overnight, and the short windows when you answer questions. It is bounded by naming it: this block, this person this week. The detail of what to alert on belongs to monitoring and capacity, a Practitioner chapter in this track.

Changing. Preparing, running and checking changes: a firmware update, a new route, a new VLAN. The cost is not the window. It is the plan before and the checks after. The Practitioner chapter on changes, windows and rollbacks teaches how to write the plan; here the point is the calendar cost.

Fixing. Faults and requests: a port that does not work, a VPN account that needs access, a link with loss. Some of it is urgent and cannot be scheduled. A good deal of it is a queue, and a queue can be given an owner and a time.

Proving. Documentation, diagrams, the record of each change, and the evidence an auditor asks for. Many engineers treat this as a tax on the real work. It is better treated as the product of the real work, written at the time. Compliance and audits explains what an auditor tests; the point here is when the evidence gets made.

Building. Projects that improve the network: an addressing plan, a capacity report, a better monitoring view. It is the first thing to go in a bad week and the last to be missed, which is why it needs protected blocks.

There is also overhead: stand-ups, the weekly change review, one-to-ones. It is not a kind of network work, but it takes real hours, and a plan that leaves it out is wrong by that amount.

What a change window costs

A change window has three parts, and only one is at night.

Part What happens Rule of thumb
Before Write the plan, test the pre-check commands, prepare and rehearse the rollback, agree who checks you, get the review About 1.5 times the window
During Run the change, run the post-checks, decide to keep or roll back The window itself
After Run the checks again in daylight, close the record, tell the people who asked About half an hour

For a two-hour window that gives about three hours before, two during and half an hour after: five and a half in all. For Crustwell’s three-hour window at Agbara, where the factory’s line schedule has a single stop on Sunday from 02:00 to 05:00, it gives about four and a half hours of preparation before the window. The factory network also has no outbound internet, so the firmware image has to be carried in and checked against the vendor’s hash beforehand. Part of that preparation is only possible in daylight on the preceding days.

Two habits keep the cost honest.

A driver and a checker. Most teams that run night changes put two people on each: one makes the change, one watches the plan, the clock and the checks. It stops the driver deciding alone, at 22:40, to keep going. It also means every window costs two people, which matters when the team is three.

Windows do not sit alone. The window is a fixed point on your calendar, but so is the preparation before it. If a plan must be approved on Monday, it cannot be written on Tuesday. Put the approval date on the calendar and work back from it.

Order the week by what cannot move

Most weeks have a few commitments that cannot move and many that can. The skill is telling them apart before you promise anything, and the way to tell them apart is to ask what each one is waiting for.

At Crustwell a window can be fixed by three different things:

  • A deadline. A vendor security advisory and a company rule that patches go on within 14 days of the advisory.
  • A machine. The factory’s only stop in the line schedule, which belongs to the factory and not to you.
  • A person. An auditor whose fieldwork calendar covers several teams and was set weeks ago.

A window can also be loose: a request from another team that wants the change “by the end of next week” can nearly always take a different night, if you ask early and offer a date. A request that says “this week” with no reason attached is also worth a question. People often say “this week” when they mean “soon”.

So the order is:

  1. Fixed points first. Put every date you do not control on the calendar: the windows tied to a deadline or a machine, the auditor’s dates, the weekly change review, the stand-ups.
  2. Then the preparation behind each. Each window and each deliverable gets its own blocks, placed before it.
  3. Add up. Compare the total with the hours you have. Do this on paper before Monday, not on Wednesday.
  4. Then name what moves. If the total is over, the thing to move is the one with a loose owner, and you ask that owner.

The addition matters most. People who plan a week by feel tend to find that every item fits individually and the total does not. The error is not in any item. It is in not counting preparation, the checks afterwards and the meetings.

Evidence is a by-product, or it is a week of work

The audit in Hajara’s week shows a cost that only appears when the auditor arrives. The external auditors test the company’s IT controls once a year. For the network team the request is concrete: a sample of the quarter’s changes, each with its approval, its plan and its post-change result; the record of the quarterly firewall rule review; and a list of who has administrator access to network devices. Crustwell’s auditors are not working to SOC 2, ISO 27001 or PCI DSS, but the logic is the same as in the compliance chapter. An auditor tests that a control existed and that it operated across the period, and what proves it is a record made at the time.

The cost depends on where the records are. If each change record already holds the approval, the plan and the test result, pulling a sample takes a few minutes per change. If they are in a ticket, an email thread and a chat message, it takes much longer. Suppose Crustwell’s team made 112 changes in the quarter and the auditor samples 30. At about 20 minutes each to find and assemble, the sample takes 10 hours. Add an hour and a half for the firewall review record and an hour for the administrator list, and the pack takes 12.5 hours. If each change had its evidence saved at the time, and pulling it took about five minutes, the sample would take 2.5 hours. These are illustrative figures, but the proportion is what real teams find: the cost of evidence is mostly the cost of looking for it.

The habit that cuts the cost is dull. When you close a change, attach the approval, the plan and the checks to the record before you close it. It adds a few minutes to each change and takes days off the audit.

Where practitioners disagree

Night windows or continuous change. Large cloud companies make small changes all day behind automation and testing, and some network teams in the same world avoid windows altogether. Many enterprise networks cannot. A factory line stops once a week, a branch trades during the day, and a head office network carries people who work late. The infrastructure-as-code chapter in the SRE track shows how far automation can move you toward the first model. Until it does, windows are a fact of the job.

Driver and checker, or one engineer. Two people halve the risk of a bad decision at 22:40 and double the staffing cost. A three-person team that runs three windows in a week has used most of its capacity before the first ticket arrives. Some teams use a checker for risky changes only. Others accept a remote checker on a call. There is no single answer; the point is to choose it ahead of the week.

Who carries the queue. Some teams give the on-call engineer the ticket queue by day, so the others can work in blocks. Others share the queue. The first protects project time and concentrates interruption; the second spreads interruption and costs everyone their blocks. An SRE’s week covers who catches interrupts in more depth, and the staffing arithmetic in on-call done right shows why a three-person team cannot run a full out-of-hours rota the way a large one does.

Whether the network engineer does audit work at all. Some companies have a risk or compliance team that gathers evidence. In a three-person network team there is usually no one else, and the evidence is the engineer’s job. The practical question is whether the work is planned or arrives as a surprise.

Day to day

Here is an ordinary week for Hajara. Lotte is on call for the rota this week, so the queue by day and the alerts out of hours are hers. Zawadi, the newest of the three, joined five months ago and is Hajara’s checker for the window on Wednesday night. Hajara’s working week is 40 hours and night work counts toward it, so on the day of a window she finishes earlier. The hours are an example, not a standard.

Monday.

  • 09:00–09:15. Stand-up. Fifteen minutes, every day.
  • 09:15–09:45. Triage: the weekend’s alerts and anything Lotte flagged. Thirty minutes, then close it.
  • 09:45–12:30. Project block: the capacity report for the head office to Agbara link.
  • 13:00–14:00. Write Wednesday’s change plan: scope, steps, rollback.
  • 14:00–15:00. Weekly change review. The plan is approved here, so it has to exist by 14:00.
  • 15:00–16:00. Tickets that Lotte passes on. 16:00–17:30. Project block.

Tuesday.

  • Stand-up, then a thirty-minute reactive window.
  • 09:45–11:15. Preparation: the pre-check commands, the rollback script, and a read-through with Zawadi.
  • 11:15–12:30. Documentation: fix the diagram of the head office switch closets.
  • 13:00–14:30. Tickets. 14:30–17:30. Project block.

Wednesday. The day ends at 15:30 because the window is tonight.

  • Stand-up and a thirty-minute reactive window.
  • 09:45–12:30. Project block.
  • 13:00–13:30. Run the pre-checks and send the go message.
  • 13:30–14:30. Tickets. 14:30–15:30. Project block.
  • 21:00–23:00. The window at head office, with Zawadi checking.

Thursday.

  • 09:15–09:45. Post-checks in daylight; close the change record with the evidence attached.
  • 09:45–10:15. One-to-one with the head of IT infrastructure.
  • 10:15–12:30. Documentation: a runbook page for the change.
  • 13:00–14:30. Tickets. 14:30–17:30. Project block.

Friday.

  • 09:15–10:15. The weekly review of alerts and tickets: what repeated, what is worth automating.
  • 10:15–12:30 and 14:00–15:00. Project blocks. 13:00–14:00. Tickets.
  • 15:00–16:00. Plan next week: fixed points first, then preparation, then the sum.
  • 16:00–17:30. A reactive window, which is also the buffer for whatever overran.

Count it up. The change, with its plan, window and checks, takes 5.5 hours. Watching, meaning triage, the reactive windows and Friday’s alert review, takes 4. Tickets take 6. Documentation takes 3.5. Meetings (stand-ups, review, one-to-one, planning) take 3.75. Project work takes 17.25. The total is 40. These proportions are this week’s. In an on-call week, project time falls to a few hours. The number to watch in your own week is project time: if it is regularly under ten hours, something is eating it.

Monthly. A review of the month’s changes against their plans, with a note of which ones overran and why. A check that the evidence for each change is attached to its record.

Quarterly. The firewall rule review, and a calendar audit: which commitments took the most time and which had no one waiting for them.

When it breaks. An outage, a launch week and an audit do not respect any template. In those weeks you drop building on purpose, say so to the head of IT infrastructure, and put it back afterwards. The failure is not a bad week. It is a plan that quietly dissolves, with no one told.

Where weeks go wrong

Counting the window and nothing else. Preparation and checks are left out, so every change costs two or three times what the plan allowed.

Evidence made at audit time. Each change was fine and the sample costs a week, because the records were never gathered.

No checker. One engineer decides alone at the worst hour, or the second person is named and then on leave.

Everything reactive. Answering every message within minutes trains the company to interrupt you. Name your windows and say when they are.

Promising the loose date as if it were fixed. You accept “by Thursday” for a request that would have taken the following Tuesday, then ask nobody. The cheapest move in a bad week is the one you did not ask for.

BY ORG SIZE
STARTUPunder 30 people

There is no network team, probably no network engineer. A founding engineer or an IT generalist looks after the office network and the cloud accounts alongside forty other jobs, and changes happen when it suits, often in the evening on your own. The week is requests: Wi-Fi, VPN, a new laptop that cannot reach something. Two habits pay off early. Keep one change log from the first day, with what you changed and how to undo it, because it becomes your audit evidence. And pick one fixed hour a week for changes, so people learn when the network may move.

SCALE-UP30 to 300

The function is being built, and so are its habits. One to three engineers carry windows, the queue and the first real audit, often a customer’s security review or a first certification, and that audit arrives as a surprise. A rota that is too small makes the maths hard: a driver and a checker for every window is two-thirds of a three-person team. This is where the addition matters most. Agree a weekly change slot, a named owner for the queue and an evidence habit, and write them down before the first audit does it for you.

ENTERPRISE300 and up

The network is a function with its own managers, and its calendar is shared with others. A change advisory board meets on set dates, a security team owns the firewall policy, an audit calendar runs all year, and a service desk owns the queue. Your week bends around other teams’ dates, and the risk is that process crowds out the work it summarises. Keep building blocks as recurring events with a named purpose, ask who is waiting for each ceremony, and treat evidence as something the tooling gathers rather than something you assemble by hand.

ARTEFACT Plan a week of windows and an audit ~45 MIN
YOU PRODUCEA network engineer's week plan with fixed points, a load check and a list of what moves

Template

# Week plan: <week of DD MMM>
Engineer · On call this week (name) · Hours available

## Fixed points (not mine to move)
| Day and time | What | Fixed by (deadline, machine or person) |
|---|---|---|

## Windows
| Window | Day and time | Driver / checker | Prep h | Window h | After h | Fixed or loose? |
|---|---|---|---|---|---|---|

## Evidence or other deliverable
<What is wanted, by when, by whom. Items x minutes each = hours>

## Load check
| Commitment | Hours |
|---|---|
| Stand-ups and meetings | |
| Windows (prep + window + after) | |
| Evidence and deliverables | |
| Essentials: reactive, one-to-one, planning | |
| **Total** | |
Hours available: <n> · Over or under by: <n>

## What moves
First to move: <item>, because <its owner has slack>. I ask: <name>, by <when>, offering <date>.
Never moves: <item>, because <reason>.

## If it still goes over
I tell <name> on <day>, with <the numbers>.
WORKED EXAMPLE

Crustwell, a week in November. Hajara drives three windows and the external auditors arrive on Thursday. Lotte is on call, so the queue and the alerts are hers. Hajara has 40 hours.

Fixed points. Stand-ups, 15 minutes daily (1.25 h). Change review Monday 14:00 (1 h). Audit pack due Wednesday 17:00. Auditor walkthrough Thursday 10:00 to 12:00 (2 h).

Windows.

Window When Driver / checker Prep Window After Fixed?
Firewall pair firmware, head office Tue 21:00–23:00 Hajara / Zawadi 3 2 0.5 Yes: 14-day patch rule ends Wednesday
Cloud route for the ERP reporting module Thu 21:00–23:00 Hajara / Zawadi 3 2 0.5 No: the ERP team asked for the end of next week
Agbara packing line switch Sun 02:00–05:00, on site 01:00–06:00 Hajara / Zawadi 4.5 5 0 Yes: the only line stop

Evidence. 30 sampled changes at 20 minutes each, 10 h. The firewall review record, 1.5 h. The administrator list, 1 h. Total 12.5 h.

Load check. Meetings 2.25 h (stand-ups, review). Windows 5.5 + 5.5 + 9.5 = 20.5 h. Audit 12.5 + 2 = 14.5 h. Subtotal 37.25 h. Essentials: reactive windows 4 h, one-to-one 0.5 h, planning 1 h, so 5.5 h. Total 42.75 h against 40: over by 2.75 h with no project time at all.

What moves. The Thursday cloud route, because its requester has a week of slack. I ask the ERP team’s lead on Monday morning, offering the following Thursday. The Tuesday and Sunday windows and the audit dates never move. Moving the route returns 5.5 h and leaves 2.75 h spare, which is the buffer.

If it still goes over. I tell the head of IT infrastructure on Tuesday, with the load check.

Now you

You are Zawadi, the newest of Crustwell’s three network engineers, and next week you are on call: you take the ticket queue by day and the alerts at night. Last month’s log shows the queue averages 3 hours a day. Lotte is on leave all week. Hajara is at the Agbara factory on Tuesday and Wednesday and can check your work only by phone. Your commitments: stand-ups every day for 15 minutes; the Monday 14:00 change review for 1 hour; a head office window on Wednesday from 21:00 to 23:00 to replace an access switch, where you drive and Hajara checks; the monthly capacity summary for the head office to Agbara link, which runs at 70% at peak, due to the head of IT infrastructure on Thursday at 14:00 and needing about 3 hours; the auditors’ follow-up questions, due Tuesday at 12:00 and needing about 2 hours; and a request to redraw the head office switch-closet diagrams, about 10 hours, which says only ‘this week’. You also need reactive windows (4 hours) and a one-to-one (0.5 hours). Produce the plan using the template. Decide what moves, and whom you ask.

Self-check

DECIDE

You are Hajara, one of Crustwell's three network engineers, and it is Monday 09:00. You are due to drive three windows: Tuesday 21:00 at head office for the firewall pair, which must be done by Wednesday under the company's 14-day patch rule; Thursday 21:00 for a cloud route the ERP team wants by the end of next week; and Sunday 02:00 at Agbara, the factory's only line stop. The auditors' pack (30 sampled changes, the firewall review record and the administrator list, 12.5 hours) is due Wednesday at 17:00, with a walkthrough on Thursday. Lotte is on call. Zawadi, five months in, has not driven a cloud change alone. Your commitments come to 37.25 hours, and reactive time, planning and your one-to-one need 5.5 more, so you are 2.75 hours over a 40-hour week. What do you do?

READING
  1. BOOK
    The Practice of System and Network Administration, 3rd edition, Volume 1 Thomas A. Limoncelli, Christina J. Hogan and Strata R. Chalup, 2016

    The standard general text for the job. Read it for how teams organise change, on-call and operational load, then compare its advice with your own calendar. Read: The chapters on change management and on running a team's operational work.

  2. BOOK
    Time Management for System Administrators Thomas A. Limoncelli, 2005

    A short book on time management written for people whose day is interrupts. Useful for turning the five kinds of time into a routine you keep. Read: The chapters on the Cycle system and on dealing with interruptions.

  3. DOC
    Eliminating Toil Google, in Site Reliability Engineering, 2016

    Defines toil as work that is manual, repetitive, automatable, tactical and without enduring value, and states Google's goal of keeping it below 50% of each SRE's time. Read it to judge which of your queue and window work is toil, and whether it is crowding out building.

  4. POST
    Maker's Schedule, Manager's Schedule Paul Graham, 2009

    Why a single meeting can blow a maker's whole afternoon, in Graham's words. It is the case for keeping project blocks whole and clustering meetings and reactive time around them.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: The map of network roles: enterprise, cloud, provider, data centre, security →