An SRE's week
An SRE's week is one week of a rotation: on-call weeks written off for projects, a ticket week, project weeks protected by both, the reviews that hold the team together, and a time log that tells you when operational work has passed half
An SRE team of six runs a weekly primary on-call and a weekly secondary on-call, each person taking one of each per cycle. Before counting any tickets, releases or manual tasks, what is the smallest share of each SRE's time that goes to operational work?
Most jobs have a typical week. An SRE has a typical cycle. The rotation decides, weeks in advance, whether next week is spent on the pager, on the ticket queue or on a project, and the three kinds of week have almost nothing in common. A plan written for one week will be wrong for the next. A plan written for the whole cycle can balance.
The SRE week is also the only one in this site’s career tracks where the split between kinds of work is a stated policy. An engineering manager’s week, in an EM’s week, is judged by whose work each hour moves. A staff engineer’s week, in a staff engineer’s week, is a portfolio of attention defended against other people’s agendas. Both are rules of thumb the person sets for themselves. SRE, as Google wrote it down, comes with a number: operational work stays under half of each SRE’s time, and the rest is engineering. Whether your week honours that number is something you can measure, and at Foundations level, measuring it is most of the skill.
This chapter is for the Junior SRE and the DevOps Engineer: someone who carries a pager with a backup, runs defined procedures, automates small things and plans a week ahead. The on-call policy itself, the error-budget policy in SLOs in practice and the toil audit in toil and automation are taught at Practitioner level; this chapter shows where each one lands in your calendar.
The model: a rotation, not a week
Start from the rotation, because it is fixed before anything else. A common shape is a weekly primary on-call and a weekly secondary, plus, on teams with enough people, a weekly ticket duty. With eight SREs and one of each per cycle, the cycle is eight weeks long and has four kinds of week in it.
- Primary week. You hold the pager and handle what it brings. The SRE book’s chapter on interrupts is blunt: “When an engineer is on-call for a week, that week should be written off as far as project work is concerned.” Plan it as zero project hours. If the week is quiet, the spare time goes to the alerts and runbooks that paged you, which is still operational work.
- Secondary week. The SRE book says the split between primary and secondary “varies from team to team”: on some teams the secondary is a fall-through for pages the primary misses, on others the secondary takes all non-urgent production work. Find out which yours is, because it decides whether you get half a week of project time or none.
- Ticket week. On teams that separate them, one person takes the non-paging requests so the others can work uninterrupted. More on this below.
- Project weeks. Everything else. This is where the engineering half of the job lives, and it only exists if the other three kinds of week hold their boundaries.
The arithmetic follows. The SRE book’s chapter on toil works it through: one primary and one secondary week per cycle means “in a 6-person rotation, at least 2 of every 6 weeks are dedicated to on-call shifts”, a lower bound of 2/6 = 33%, and in an eight-person rotation 2/8 = 25%. Add a ticket week and an eight-person team starts at 3/8 = 37.5% before a single unplanned task. That is why the size of the rotation, which you do not choose, shapes your week more than any habit you do choose. The staffing maths and the rotation shapes are in runbooks, on-call rotations and alert fatigue, and the policy that sets them is on-call done right.
Four kinds of work, and the half that is engineering
The SRE book sorts an SRE’s time into four kinds, and you will use the same four when you log yours.
| Kind | What it is in your week | Examples |
|---|---|---|
| Software engineering | Writing or changing code | The automation that removes a manual task; a tool; a fix to the service |
| Systems engineering | Configuring and changing production systems with lasting effect | A monitoring change; a load-balancer rework; capacity work |
| Toil | Manual, repetitive, automatable work with no enduring value, which grows with the service | Routing a number range by hand; restarting a stuck job; a data pull for support |
| Overhead | Work not tied to running the service | Team meetings, one-to-ones, hiring, training, reviews of your own work |
Toil has a precise definition, which toil and automation works through. Not all operational work is toil. Investigating a novel failure during an incident is hard engineering under time pressure. Running the same five commands for the fortieth time is toil. Your log will be more useful if it keeps them apart, but the 50% line in the book counts operational work as a whole, on-call weeks included.
The line itself: “Our SRE organization has an advertised goal of keeping operational work (i.e., toil) below 50% of each SRE’s time.” Two details matter for planning. First, it is an average: the book says every SRE needs at least half their time on engineering “when averaged over a few quarters or a year”, because toil is spiky. A ticket week at 85% is not a breach; a quarter at 60% is. Second, Google reported the reality alongside the goal: quarterly surveys of its SREs put the average time spent toiling at “about 33%”, and the top source was interrupts, “non-urgent service-related messages and emails”, followed by on-call response, then releases and pushes. Expect the same order in your own log.
Why the line exists is the career argument, and the same chapter makes it: too little project time stalls your career, too much toil causes burnout, and a team that accepts toil teaches its development counterparts to send more. The reasoning behind the cap belongs to SRE philosophies; the point here is that your week is where the cap is either kept or quietly lost.
Interrupts: who catches them
The fastest way to lose the engineering half is the pattern in the opening: one shared channel, and whoever answers first owns the request. The quickest and most helpful person answers most, and that is usually the newest. The SRE book’s chapter on dealing with interrupts names three kinds, pages, tickets and ongoing operational responsibilities such as rollouts and ad hoc questions, and gives a direct instruction about the second: “If you currently assign tickets randomly to victims on your team, stop.”
Its alternative is to dedicate people. The primary on-call “should focus solely on on-call work.” Tickets become a rotation, “a full-time role, for an amount of time that’s manageable for a person”, with two people on it if the volume needs that. And both rotations hand over: “There should be a handoff for tickets, as well as for on-call work.” The argument is about flow. One person absorbing every interrupt for a week costs that person a week; spreading the same interrupts across a team costs everyone their concentration every day.
What this means for you, whatever your team’s structure:
- In a ticket week, own the queue completely. Acknowledge every request the same day, close what you can, and for each one note how long it took and whether it could be automated or refused. That note is the raw material for the next toil-reduction project, possibly yours.
- Outside it, redirect. When someone asks you directly, point them at the queue or the person on duty, politely and every time. Answering is faster for both of you today and teaches everyone that the queue is optional.
- At handoff, write it down. The shape of an on-call handoff, with open incidents, silences and changes in flight, is in runbooks, on-call rotations and alert fatigue; a ticket handoff is the same idea with open requests and their state.
If your team has no ticket rotation and nobody owns the channel, that is not something you fix alone in your second month. It is something you measure and bring to your lead, which is the next section.
Measuring your week
You cannot defend a split you do not measure. The SRE Workbook’s chapter on toil recommends a unit “that expresses the amount of human effort applied to this toil”, and says “Minutes and hours are a natural choice because they are objective and universally understood.” It also warns that the measuring must not become toil itself.
A log that works for a junior SRE costs five minutes a day:
- Blocks of half an hour, each tagged with one of the four kinds of work, and for toil a short source tag: the ticket type, the alert, the manual procedure.
- A weekly total in a sheet, by kind and by week type, so a primary week is compared with other primary weeks.
- A cycle total at the end of each rotation cycle: share of operational work, share of project work, and the top three toil sources by hours.
Two habits make the numbers persuasive rather than anecdotal. Keep it for a full cycle before drawing conclusions, because one ticket week proves nothing. And record the count and the minutes for each top source: “routing tickets, 45 a month at about 40 minutes each, 30 hours” is a sentence your lead can take into planning; “tickets are endless” is not. The team-wide audit, with automation ROI and the order of options, is toil and automation; your personal log is one of its inputs.
When the cycle total is over half, the book is clear about what the organisation does: it redirects “excess operational work to the product development teams”, by reassigning bugs and tickets or putting developers back on the pager, until the load “drops back to 50% or lower.” Notice who does that: not the junior SRE at 22:00. Your job is the data and a proposal; the redirect is your lead’s decision and, often, the head of engineering’s. The Decide at the end of this chapter is that conversation.
The reviews and meetings
An SRE’s week has fewer meetings than a manager’s, and the ones it has are about production. Know which are yours and what you bring.
| Meeting | Cadence | What it is for | Your part |
|---|---|---|---|
| Production meeting | Weekly, 30 to 60 minutes | One shared picture of production: the SRE book lists upcoming changes, metrics, outages, paging events, non-paging events and prior action items | In your primary week, report the pages; otherwise bring changes you are making. Many teams rotate the chair, so expect to run it |
| Postmortem review | Weekly or fortnightly | Read and challenge the week’s postmortems, assign actions | Read before you arrive; for incidents you handled, write the timeline. The document is in incidents and postmortems, the review programme in incident management |
| Capacity and cost review | Monthly, with the plan refreshed quarterly | Headroom on the binding constraints, cost movers, upcoming demand | Prepare one chart for a system you know; ask why the forecast moved. The method is capacity and cost |
| Launch and readiness reviews | When a service is about to launch | Check a service is operable before it takes traffic | Take a section of the checklist with a senior SRE; the programme is production readiness reviews |
| Disaster role-play | Weekly on some teams | A game master runs a past incident and two people play primary and secondary | Play when picked; the SRE book’s chapter on training calls the exercise “Wheel of Misfortune” |
| Team planning and one-to-one | Per sprint or quarter; weekly | Your project, its scope and its protected time | Bring your cycle totals |
The production meeting deserves the most care. The SRE book says its goal is for everyone to leave with the same idea of what is going on, and attendance “is compulsory for all the members of the SRE team”. It is where a junior SRE learns the system fastest, because every page and change of the week is explained by someone who handled it.
Project time
The engineering half of a junior SRE’s week usually has three kinds of project, in rough order of how often you will get them.
Toil reduction. Automating the top source in your own log, with a senior reviewing the design. This is the best first project: you know the task, you can measure before and after, and the result shows in everyone’s week. The Workbook’s advice applies: “Don’t try to design the perfect system that eliminates all toil”, and consider “a partially automated approach as an interim step”. Its stronger advice is to ask first whether the task needs doing at all.
Alert and runbook work. Deleting or downgrading noisy alerts and rewriting the runbook that failed you at 03:00. It is project work when it changes things for the whole rotation. How to judge an alert is in alert design.
A slice of a larger project. A migration, a new region, capacity work, owned by a senior and with a piece that is yours.
Project time is counted in blocks, not hours. Three hours on Tuesday morning and three on Thursday move a project; six scattered half-hours do not. In project weeks, put two or three half-day blocks in the calendar before the week starts, put the production meeting and the reviews around them, and decline what lands on top, unless it is an incident.
Where practitioners disagree
Should the person on call do project work? The SRE book says no: write the week off. Teams with small rotations argue they cannot afford a lost week every few weeks, and let the primary do project work between pages. The cost is that the project and the pager both get half attention, and the follow-up from pages, the part that makes the next shift quieter, is what gets dropped.
A separate ticket rotation, or tickets on the on-call? A separate rotation protects everyone’s flow but costs another week in the cycle; on an eight-person team it raises the structural lower bound from 25% to 37.5%. Folding tickets into the secondary week costs nothing in the calendar and works when ticket volume is low. Measure the volume before choosing.
Is 50% a policy or a hope? At Google it is a stated goal with a defined consequence. In many companies whose job title is DevOps Engineer, there is no cap at all and the platform team is the queue for everything. Some argue the number matters less than the habit of measuring and the right to push back. Most agree that a team with no number has no argument.
How much to log? Half-hour blocks every day are accurate and annoying. Some teams log only toil, by ticket type, from the ticket system; others run a quarterly survey, as Google did. The minimum that works is enough to name your top three sources with hours.
Day to day
Here is the cycle for a junior SRE on an eight-person team with weekly primary, secondary and ticket duty. The times are an example; the shape is the point.
Primary week.
- Monday: read the outgoing handoff before the pager moves to you; check silences and changes in flight. Production meeting: listen for this week’s risky changes.
- Every day: acknowledge pages inside the response target, handle or escalate, write each one up the same day: what fired, was it actionable, which runbook, what you changed.
- Spare hours: fix the alert or runbook that paged you. No project work.
- Sunday or Monday: write the handoff and read it through with the incoming primary.
Secondary week. Back up the primary or take the non-urgent production work, as your team defines it. Join any incident the primary declares. Use the remaining time on project work only if your team’s definition leaves you time.
Ticket week. Own the queue. Same-day acknowledgement; a note of minutes and source for each request; refuse or redirect what is not yours, with the reason. Friday: hand over open requests in writing and list the three request types that cost most.
Project week.
- Monday: production meeting; set the week’s two or three project blocks if planning has not already.
- Tuesday and Thursday mornings: project blocks, chat closed.
- Wednesday: design review or pairing with the senior who owns your project; one-to-one with your lead.
- Thursday or Friday: postmortem review; disaster role-play when it runs.
- Friday: update your log; write two lines on project progress for the team.
- Every day: five minutes on the time log; redirect requests to whoever is on duty.
Monthly. The capacity review. Your own log reviewed over the month, with the top toil sources.
Each cycle. The cycle total: share of operational work, share of project work, top three toil sources by hours, compared with the target. Take it to your one-to-one.
Quarterly. Planning, where your project is chosen and sized, ideally from your own toil data. If the cycle totals have been above half for the quarter, this is where it gets said, with numbers.
There is no SRE team and probably no SRE. A founding engineer or the first DevOps Engineer holds production alongside feature work, often on a rotation of three or four developers, and the week is mostly interrupts. The four-way split still works as a lens. Keep a rough log, even only of the manual tasks, so that when the company hires its first platform or SRE person the top sources of toil are known. Protect one half-day a week for the automation that stops the same request arriving twice.
The function is being built. The first SRE or platform team inherits a request channel the whole company already uses and a rotation that is too small for the book’s arithmetic. This is where the week is most at risk and where measuring pays off most: a ticket rotation, a written handoff and a cycle total are cheap to start and give the lead the evidence to redirect work to development teams. Expect your project to be toil reduction, and expect to explain the 50% line to people who have never heard of it.
The cap, the ticket rotation and the production meeting exist, and the problem is everything around them. Change approval boards, access reviews, audit evidence, cost reports and cross-team reviews swell the overhead row, and toil hides inside compliance processes nobody owns. A junior SRE may spend a week preparing a change for a board that meets fortnightly. Log the overhead as carefully as the toil, find the senior who knows which processes can be automated, and use the large on-call rotations to protect long project blocks.
Template
# Rotation cycle plan: <name>, <team>, <dates>
Team: <n SREs> · Rotation: primary <weekly?>, secondary <weekly?>, tickets <weekly? none?>
Cycle length: <n weeks> · Working week: <hours> · Cycle hours: <n weeks x hours>
Secondary on this team means: <fall-through for pages | all non-urgent production work>
## Week types in this cycle
| Week | Type | Ops hours | Project hours | Overhead hours | Notes |
|---|---|---|---|---|---|
| 1 | primary | | 0 | | |
| 2 | secondary | | | | |
| ... | | | | | |
| **Cycle total** | | <h> (<%>) | <h> (<%>) | <h> (<%>) | |
Operational share: <ops hours> / <cycle hours> = <%> · Structural lower bound: <on-call + ticket weeks> / <cycle weeks> = <%>
## Interrupts: who owns what
| Channel | Owner this week | How work reaches them | Handoff |
|---|---|---|---|
| Pages | | | |
| Tickets / request channel | | | |
| Releases and rollouts | | | |
| Direct messages to me | redirect to: | | |
## Standing reviews
| Meeting | Cadence | My part | Prep time |
|---|---|---|---|
| Production meeting | | | |
| Postmortem review | | | |
| Capacity review | | | |
| One-to-one with lead | | | |
## Project weeks
Project: <name, owner, what done looks like this cycle>
Blocks: <day, half-day> x <n> per project week
## Toil log (top sources, last cycle)
| Source | Count | Minutes each | Hours | Automate, refuse or redirect? |
|---|---|---|---|---|
## If the cycle total passes 50%
Trigger: <e.g. two cycles in a row above 50%>
I bring: <cycle totals, top three sources, a proposal> to <lead> at <meeting> WORKED EXAMPLE
Hematite is a fictional cloud voice-calling API: developers use it to place and receive phone calls from their apps. 260 people, 85 engineers in 11 teams. The SRE team is eight people in Lagos and Johannesburg, an hour apart, run as one single-site rotation and led by Khanyisile, a Senior SRE. Hauwa is a Junior SRE, seven months in, and took her first primary week last month. Her working week is 40 hours.
Rotation. Weekly primary and weekly secondary; on this team the secondary takes non-urgent production work, including the release train. Since the spring there is a weekly ticket duty. Each person has one of each per cycle, so the cycle is 8 weeks, 320 hours. Structural lower bound: 3 of 8 weeks = 37.5%.
Target budget (measured last cycle in brackets). Primary: 40 ops, 0 project (40, 0). Secondary: 16 ops, 18 project, 6 overhead (18, 16, 6). Tickets: 34 ops, 6 overhead (34, 6). Five project weeks, each: 4 ops, 30 project, 6 overhead (11, 23, 6). Cycle total, target: ops 110 h (34%), project 168 h (53%), overhead 42 h (13%). Measured: ops 147 h (46%), project 131 h (41%), overhead 42 h (13%). Both columns sum to 320.
What the log showed. The gap is in the project weeks: 7 extra ops hours a week, because people still message her directly about number-range routing. The top toil source across the team is routing tickets on the session border controllers: about 45 a month at about 40 minutes each, 30 hours a month. Next: support log pulls, about 9 hours a month; manual certificate renewals, about 4.
Interrupts. Pages go to the primary. Requests go to the ticket queue; Hauwa now replies to direct messages with a link to it. Releases go to the secondary.
Reviews. Monday production meeting, 45 minutes; she chairs it every eighth week. Thursday postmortem review. Capacity review on the first Tuesday of the month; she prepares the media-server headroom chart for one region.
Project. Self-service routing for number ranges through the provisioning API, reviewed by Khanyisile. Blocks: Tuesday and Thursday mornings, Wednesday afternoon. Done this cycle: the design approved and the first carrier automated.
Trigger. Two cycles above 50%, or project weeks averaging over 8 ops hours: she brings the totals and the top three sources to her one-to-one with Khanyisile.
Now you
You are a new DevOps Engineer at Jasper, a fictional online pharmacy with 140 people and 35 engineers in five product teams. The platform team is three people: Cherono, the Platform Lead, Jumoke and you. Jasper runs in one cloud region on Kubernetes and Postgres. The three of you share a 24/7 platform pager, one week each in turn, with the prescription service’s on-call developer as secondary, so each of you is on call one week in three. Requests arrive in one #platform-help channel, about 70 a month, and whoever answers first owns them. Prescriptions sent over the weekend make Monday 08:00 to 11:00 the busiest window of the week. Once a month the superintendent pharmacist needs a controlled-drugs audit export, a manual query that takes about three hours. Your quarter’s project is moving CI from a self-hosted Jenkins to a managed CI service. Produce your plan for one full rotation cycle. Show the operational share and its arithmetic, and say what you will raise about the rotation’s structure.
Self-check
You are one of three DevOps Engineers on Jasper's platform team; Jasper is a 140-person online pharmacy with 35 engineers. Cherono, the Platform Lead, is your manager, and Dagny is Head of Engineering. For six weeks you logged your time in half-hour blocks: 144 of 240 hours, 60%, were operational. Your two on-call weeks took 70 hours. In the other four weeks: #platform-help requests 40 hours, babysitting the prescription service's manual deploys 22 hours, data exports for the pharmacy team 12 hours. Your CI migration project is two weeks behind. What do you do?
- BOOK Site Reliability Engineering, chapter 5: Eliminating Toil Vivek Rau, 2016
The definition of toil, the four kinds of SRE work, the 50% goal averaged over quarters and the rotation arithmetic behind it. Read it first, then categorise a week of your own calendar with it. Read: Chapter 5, free online at sre.google.
- BOOK Site Reliability Engineering, chapter 11: Being On-Call Andrea Spadaccini, 2016
The 50/25/25 split between engineering, on-call and other operational work, the minimum team sizes and the ways teams divide primary and secondary. Read it to understand the rotation your week sits inside. Read: Chapter 11, free online at sre.google.
- BOOK Site Reliability Engineering, chapter 29: Dealing with Interrupts Dave O'Connor, 2016
Why the on-call week is written off for projects, why tickets need a dedicated rotation and a handoff, and the case for flow. The most practical chapter in the book for planning a week. Read: Chapter 29, free online at sre.google.
- BOOK Site Reliability Engineering, chapter 31: Communication and Collaboration in SRE Niall Murphy with Alex Rodriguez, Carl Crous, Dario Freni, Dylan Curley, Lorenzo Blanco and Todd Underwood, 2016
The weekly production meeting: its agenda, its length, compulsory attendance and the rotating chair. Read it before you chair your first one. Read: Chapter 31, the section on production meetings.
- BOOK The Site Reliability Workbook, chapter 6: Eliminating Toil David Challoner, Joanna Wijntjes, David Huska, Matthew Sartwell, Chris Coykendall, Chris Schrier, John Looney and Vivek Rau, 2018
How to measure toil in hours, a taxonomy of where it comes from, and the order of fixes: reject the task first, automate partly before fully. Use it when you design your time log and pick your first project. Read: Chapter 6, free online at sre.google.
- BOOK Seeking SRE David N. Blank-Edelman (ed.), 2018
Contributed chapters from practitioners at many companies on how SRE is done outside Google, including on-call and the human side of the work. Read it as the counterweight to the Google books: the same principles, many different weeks. Read: Parts on SRE implementation and the human side of SRE.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.