FOUNDATIONSCHAPTER 03

A QA engineer's week

Where a QA engineer's hours go across triage, planning, exploratory sessions and sign-off, and how to arrange them so the release never eats the testing

35 MINQA AND QUALITY ENGINEERINGUPDATED 2026-11-05
PREDICT

Your team works in two-week sprints and releases at the end of each. A story for changing a saved payee's details is picked up on day 2. When should you do most of your thinking about how to test it?

Ask a QA engineer what they did this week and you often hear a list of tickets: tested this, retested that, raised these. Ask what they found that nobody expected and the answer is shorter. That gap is the subject of this chapter. The role sits downstream of every other role on the team, so the week fills from upstream: whatever arrives on the test environment sets the day. What gets squeezed is the work with no ticket attached: thinking about risk before the code exists, and exploring the product for the failures nobody wrote a test case for.

This chapter gives you a model of the four loops that make up the week, a concrete week at a neobank, the arguments practitioners have about the role, and a cadence plan you can write for your own team. The PM version of this question, in A PM’s week, is about protecting writing time from meetings. Yours is about protecting exploration from the release.

The model: four loops at four speeds

A QA engineer’s work runs in four loops. Each has its own clock, and the week only works when all four turn.

Loop Clock What it produces What goes wrong if it stops
Triage daily, 15–30 min a bug list where every item has a severity, a priority and an owner the list grows past the point anyone reads it; real bugs hide among stale ones
Planning per story and per sprint agreed examples, risks and a test approach before the code is written testing starts when the build lands, so every gap is found late and costs a rework
Sessions several times a week, 60–120 min each session notes: what you covered, what you found, what you could not reach the team only runs scripted checks, and the bugs nobody imagined ship
Sign-off per release a go or no-go with the evidence behind it releases ship on a green build and a feeling

Triage is the fastest loop. New bugs arrive from your sessions, from developers, from support, from crash reporting. Each needs a reproduction, a severity (how bad for the user or the business) and a priority (how soon the team will fix it), agreed with the product owner and the engineering lead; the craft is in bug reports that get fixed. Triage is also where you close things: duplicates, bugs fixed by another change, bugs nobody will ever fix. A list that only grows is a list nobody trusts.

Planning is where the leverage is. Crispin and Gregory’s Agile Testing is built on the idea that the tester’s most valuable contribution happens before code exists: asking for examples, naming risks, turning acceptance criteria into cases the developer can automate. The common ritual is the three amigos, a short conversation between someone from product, development and testing about one story, popularised by George Dinwiddie. Fifteen minutes there saves days later.

Sessions are exploratory testing done with discipline, covered in full in exploratory testing and charters. James and Jon Bach’s session-based test management, in the reading, gives the unit: a chartered, uninterrupted block, normally about 90 minutes, with shorter and longer sessions either side (practitioners commonly size them at 60, 90 or 120 minutes), followed by notes and a short debrief. Elisabeth Hendrickson’s Explore It! gives the charter shape: explore a target, with resources, to discover information. Without booked sessions, exploration happens in the gaps between meetings, and twenty-minute gaps produce happy-path clicking.

Sign-off is the slowest loop and the loudest. A release needs someone to say what was tested, what was not, what is known to be broken, and whether that is acceptable. At Foundations level you assemble the evidence and state the gaps; at Practitioner level you make the call. The chapter on release management and sign-off later in this track covers the decision itself. Here the point is the timing: if sign-off is the first time anyone looks hard at the release, it will always be rushed.

The loops feed each other. Planning tells you what to charter. Sessions feed triage. Triage tells you what the release carries. Sign-off tells you where next sprint’s planning should look harder.

Whole-team testing, and where people disagree

The first four chapters of Agile Testing set out the position most modern teams claim to hold. Testing is not a phase; it happens throughout the sprint. Quality is the whole team’s responsibility, not the tester’s. The tester’s job is to help the team build quality in: by providing examples, by pairing, by giving fast feedback, and by making the test approach visible. Their ten principles for agile testers include providing continuous feedback, delivering value to the customer, and responding to change. Chapter 4, on team logistics, deals with where testers sit and whom they report to, and leans towards testers working inside the team they test, the embedded model many product companies now use.

Crispin and Gregory also popularised the agile testing quadrants, adapted from Brian Marick. Business-facing tests that support the team (examples, story tests), technology-facing tests that support the team (unit and component tests), business-facing tests that critique the product (exploratory, usability, acceptance), and technology-facing tests that critique the product (performance, security, the other “-ilities”). Lisa Crispin’s own post in the reading warns that the numbering is not an order. For your week, the quadrants are a checklist: if every hour last week went into one quadrant, the other three were nobody’s job.

Practitioners disagree about the balance in three places.

Gatekeeper or coach. In the older model the tester is the last line of defence and signs a release off like an inspector. In the whole-team model the tester spends more time upstream, coaching developers to test their own work, and less time inspecting. Gatekeeping alone produces a bottleneck and developers who throw work over the wall. Coaching alone, with nobody holding the release decision, produces a team where everyone assumes someone else checked. Most good QA engineers do both and move the balance as the team matures.

Testing versus checking. Michael Bolton and James Bach distinguish checking, the mechanical confirmation of things you already expect, which a machine can do, from testing, the skilled investigation of what the product actually does. Their camp, Rapid Software Testing, argues that a week spent running scripted cases is a week of checking with no testing in it. Teams heavier on automation reply that checks are what keep a weekly release safe. Both are right about different things; your cadence needs room for each.

Manual time at all. Some organisations, with Google the most cited, have folded most testing into developers and automation, with test engineers building tools rather than running sessions. Others keep dedicated exploratory testers. The choice depends on the product’s risk and the team’s skill. A neobank that moves money will want human exploration of payment flows for a long time; the chapter on testing philosophies covers the trade-offs in depth, and building a quality org covers the choice from the Head’s seat.

Day to day

Here is a week for a QA analyst at Corvid, a fictional neobank of 140 people. You are embedded in the payments squad: five developers, a product owner, a designer and you. The squad works in two-week sprints. The mobile app releases every week: the release candidate is cut on Tuesday at 12:00, sign-off is due Wednesday at 15:00, and the app goes to the stores Thursday with a phased rollout. The hours are an example, not a standard. The principle is fixed: sessions get mornings, meetings cluster, triage is short and daily, and the release has a fixed slot rather than an open claim on the week.

Monday.

  • 09:00–09:15. Standup. You say what you are testing today, what is blocked, and which bugs from the weekend need a decision.
  • 09:15–09:45. Triage. Read new bugs from the weekend: crash reports, support escalations, anything raised by other squads. Reproduce the ones that look serious. Propose a severity and priority for each in the tracker so the triage meeting has something to agree or disagree with.
  • 10:00–11:30. Session 1. Charter from last week’s planning: “Explore scheduled transfers with a payee whose details change between scheduling and execution, to discover what the user is told and what money moves.” Phone in hand, notes open, notifications off.
  • 11:30–12:00. Write up the session: what you covered, bugs raised, questions, what you did not reach. The notes take ten minutes when written straight after and an hour when reconstructed on Friday.
  • 13:30–14:30. Backlog refinement. You ask the testability questions: how will we know this works, what data will we need, what happens on the failure path. You note risks against each story.
  • 14:30–16:00. Retest fixed bugs. Update or add automated checks for stories that finished last week, or pair with a developer who is writing them.

Tuesday. Release-cut day.

  • 09:00–09:15. Standup.
  • 09:15–09:45. Triage meeting with the product owner and engineering lead. Agree severity and priority on everything new. Decide which open bugs block this week’s release candidate and say so in writing in the release ticket.
  • 10:00–11:30. Session 2, on the riskiest story merged since the last cut. A session the morning before the cut is the last cheap moment to find something.
  • 12:00. Release candidate cut. The automated regression suite runs on the build.
  • 13:30–14:00. Read the suite results. Separate real failures from known flaky tests, and raise a bug for each real failure. Flake gets logged against the test, not ignored.
  • 14:00–16:30. Release testing, part 1. Run the manual release checklist on two physical devices, one iOS and one Android, covering the flows the suite cannot reach: biometric login, push notifications, the app-switch during a payment.

Wednesday. Sign-off day.

  • 09:00–09:15. Standup.
  • 09:15–11:30. Release testing, part 2. Short exploratory session on the release candidate as a whole, chartered around the stories it contains rather than one feature. Retest any fixes merged to the release branch.
  • 11:30–12:30. Three amigos for two stories starting next sprint. You bring the risks you noted in refinement and leave with agreed examples.
  • 13:30–15:00. Write the sign-off note: what was tested, what was not, open bugs with their severity, the automated results, and a recommendation. Send it to the release manager and the engineering lead by 15:00.
  • 15:00–16:00. Go or no-go conversation if anything is contested. Most weeks it is a message, not a meeting.

Thursday. Release goes out.

  • 09:00–09:15. Standup.
  • 09:15–09:30. Check the rollout: crash-free sessions in the crash-reporting tool, support tickets tagged to the release. Apple’s phased release for automatic updates spreads over seven days, so problems surface gradually; Android staged rollouts work the same way at percentages the team chooses.
  • 09:30–11:00. Session 3, on a story mid-sprint, while it is still cheap to change.
  • 11:00–12:00. Pair with a developer on the story’s tests: you bring the cases from the three amigos, they bring the code.
  • Afternoon. Sprint planning in sprint weeks; you say how much testing each committed story needs, and push back when the commitment leaves no room for it. In the off week, a fourth session.

Friday.

  • 09:00–09:15. Standup. 09:15–09:30. Triage.
  • 09:30–11:00. Bug bash or session 4, ideally with a developer or the designer driving while you navigate.
  • 11:00–12:00. Housekeeping: close stale bugs, update the release checklist with anything this week taught you, quarantine a flaky test and file a ticket to fix it.
  • 13:00–14:00. Retrospective in sprint weeks. Bring one observation about where bugs were found and one about where they were introduced.
  • Afternoon. Charter next week’s sessions from what you learned. Put the session blocks in the calendar before anyone else books the mornings.

Count it up. Meetings come to roughly 8 to 10 hours. Sessions and their notes come to about 7 hours. Release testing and sign-off take about 8, triage about 2, and the rest goes on retests, automation and pairing. Those proportions are this example’s, not a benchmark. The number to watch in your own week is sessions: if it is zero, the week has turned into checking.

Monthly. A look at what escaped to production and where in the week it could have been caught. A pass through support tickets for your area. An hour on the release checklist to remove items nobody needs and add the ones the escapes say you do.

When it breaks. A hotfix, a regulator’s deadline or an incident will blow up any template. In those weeks you drop sessions on purpose, tell the squad, and book them back the week after. The failure is not one bad week. It is sessions quietly disappearing for a quarter and nobody noticing until an escape.

When the loops collide

Some mornings standup, triage and the release all want the same hour. You need a rule you have agreed in advance, not one you invent under pressure.

The rule that holds up: order by what is hardest to undo. A release that ships with a blocking bug reaches customers and, at a neobank, can move money wrongly; it is the hardest thing to reverse. A triage decision that slips a day costs a day. A missed standup costs a written update. So the release slot wins, triage comes next, and standup becomes asynchronous for the day. The rule only works if you say so before the morning: a one-line message in the squad channel (“on the release candidate until 11; standup notes below; triage list posted with my proposals”) turns an absence into a plan.

The other half of the rule is structural. If the collision happens every week, the cadence is wrong, not your morning. Move triage to the afternoon of release-cut day. Move the cut so it does not land on standup. Agree that release testing starts the afternoon before. A cadence plan exists so collisions are rare enough to handle by rule.

Where weeks go wrong

The release eats the week. Every day becomes regression for the next release. Sessions vanish, planning is skipped, and the team stops hearing your questions before code exists. Fix the slot for release testing and defend the rest.

Testing starts at the build. You meet each story when it lands on the test environment. Every gap you find is a late code change, so the team starts to see you as the person who slows things down. Get into refinement and the three amigos.

Triage as a ritual. The meeting runs, nothing is closed, the list grows. Close bugs ruthlessly; a bug nobody will fix is a decision, so record it as one.

Flake tolerated. A suite that fails one run in five gets re-run until it passes, and real failures hide among the flaky ones. Quarantine and ticket every flaky test the week you see it.

Sign-off by feeling. The note says “tested, looks good”. It should say what was tested, what was not, and what is known. A sign-off with no gaps listed is either a rare release or a dishonest note.

Working alone. A QA engineer who never pairs, never brings a developer into a session and never shows their notes becomes a bottleneck and a mystery. The whole-team model depends on your work being visible.

BY ORG SIZE
STARTUPunder 30 people

There is no QA function and probably no QA engineer. If you are the first, your week is whatever the founders need that day, and the release is whenever someone merges. Set a small cadence anyway: fifteen minutes of triage each morning, one chartered session a day on whatever shipped most recently, and a written note before each deploy saying what you looked at. Expect to spend as much time teaching developers to test as testing. The four loops still exist; they are smaller, faster and mostly in your head, so write them down.

SCALE-UP30 to 300

The function is being built, and you are probably one QA for one or two squads, as at Corvid. Your cadence collides with the squad’s sprint and the company’s release train, and nobody has reconciled the two. This is where a written cadence plan earns its keep: agree the release slot with the release manager, the triage slot with the product owner, and protect sessions with the engineering lead’s support. A QA lead may exist and will want your notes and escape data, so keep them in a form someone else can read.

ENTERPRISE300 and up

The release process is a calendar of its own: change advisory boards, release windows, a sign-off template with named approvers, and an audit trail if you are regulated. Your week bends around those dates, and much of sign-off is assembling evidence in the required format. The risk is that formal sign-off crowds out the work it is meant to summarise. Keep sessions on the calendar as recurring blocks, keep triage within your squad before it rolls up to programme level, and expect several QA engineers to share one release, which makes the hand-offs between you part of the cadence.

ARTEFACT Write your weekly cadence plan ~45 MIN
YOU PRODUCEWeekly QA cadence plan

Template

# QA cadence plan: <team>, <quarter>
Owner · Squad(s) covered · Sprint length · Release frequency

## Fixed points
| Event | Day and time | Owner | What I bring |
|---|---|---|---|
| Release candidate cut | | | |
| Sign-off due | | | sign-off note |
| Release / rollout start | | | |
| Sprint planning | | | testing estimate per story |

## Loops
### Triage
Slot: <days, time, length> · With: <PO, eng lead>
Inputs: <sessions, crash reports, support, other squads>
Rule: every new bug has severity, priority and owner within <n> working days

### Planning
Refinement: <slot> · Three amigos: <when, for which stories>
Output: examples and risks attached to each story before work starts

### Sessions
Blocks: <days, times, 60–120 min> · Charters chosen: <when, from what>
Notes: <where kept> · Debrief: <with whom, how often>

### Sign-off
Release testing window: <start> to <end>
Sign-off note contains: tested / not tested / known bugs / automated results / recommendation
Sent to: <names>

## Collision rule
When <loops> clash: <order>, and I tell the team by <how>.

## Monthly review
Escapes this month: <list> · Where in the week could each have been caught?
Change to cadence: <one change>
WORKED EXAMPLE

Corvid, a fictional neobank of 140 people, has one QA analyst in its payments squad: five developers, two-week sprints, weekly mobile releases. The analyst wrote this plan after an escape where a transfer duplicated when the app was backgrounded mid-payment.

Fixed points. Release candidate cut Tuesday 12:00 (release manager). Sign-off note due Wednesday 15:00. Store submission Thursday 10:00 with phased rollout. Sprint planning every other Thursday 14:00, where the analyst gives a testing size per story.

Triage. Monday 09:15 (solo, 30 minutes, proposes severity and priority), Tuesday 09:15 with product owner and engineering lead (30 minutes, agrees and marks release blockers), Friday 09:15 solo (15 minutes). Rule: every new bug triaged within two working days; anything older than 90 days with low priority is closed with a note.

Planning. Refinement Monday 13:30. Three amigos Wednesday 11:30 for every story estimated above two days. Output: three to six examples per story, attached to the ticket.

Sessions. Monday, Tuesday and Thursday 10:00, 90 minutes each, plus Friday 09:30 as a paired session. Charters chosen on Friday afternoon from refinement risks and this week’s escapes. The first month’s charters all involve interrupted payments: backgrounding, losing network, double taps.

Sign-off. Release testing Tuesday 14:00 to Wednesday 11:30 on one iOS and one Android device. Note includes suite results with flaky tests listed separately.

Collision rule. Release beats triage beats standup; written standup in the squad channel when the release slot runs over.

Monthly review. First Friday. Last month: two escapes, both in network-loss paths. Change: one extra session charter per week on degraded networks.

Now you

You are the only QA engineer at Tanager, a fictional customer-support messaging tool of 70 people. You cover two squads: the inbox squad (six developers, two-week sprints starting Monday) and the integrations squad (four developers, one-week cycles starting Wednesday). The web app deploys whenever a change is merged, behind feature flags; the desktop app releases every other Thursday, with a release candidate cut the Tuesday before. Both squads hold standup at 09:30. Integrations runs bug triage Wednesday at 10:00, which is also when the desktop sign-off conversation tends to happen in release weeks. Last month three bugs escaped, all in how messages from a third-party chat integration were threaded, and nobody had explored that integration since it launched. The inbox engineering lead wants you in every refinement; the integrations lead wants you to write more automated checks. Write your cadence plan for the next quarter. It must resolve the Wednesday clash and include sessions aimed at the integration that escaped.

Self-check

DECIDE

You are the QA analyst at Corvid. It is Tuesday, 08:50. Standup is at 09:00, the weekly triage meeting with the product owner and engineering lead is at 09:15, and the release candidate is cut at 12:00 with sign-off due at 15:00 tomorrow. Overnight, crash reporting flagged a new crash in the transfer confirmation screen on the current production build, and a developer merged a fix to the payee-edit flow late last night that is going into today's cut. You have not looked at either yet. What do you do with the morning?

READING
  1. BOOK
    Agile Testing: A Practical Guide for Testers and Agile Teams Lisa Crispin and Janet Gregory, 2009

    The case for whole-team testing and for a tester who works before the build as well as after it. Chapter 4 on team logistics is the closest thing to a description of how the week should sit inside a team. Read: Chapters 1–4: what agile testing is, the ten principles, cultural challenges, team logistics.

  2. BOOK
    Explore It! Reduce Risk and Increase Confidence with Exploratory Testing Elisabeth Hendrickson, 2013

    Why exploration and scripted checks answer different questions, and the charter shape that makes a session plannable. Read chapter 1 before you book your first session block. Read: Chapter 1, On Testing and Exploration.

  3. PAPER
    Session-Based Test Management Jonathan Bach and James Bach, 2000

    The paper that turned exploratory testing into something you can schedule and report on: chartered, time-boxed sessions with notes and a debrief. The source of the session as the unit of your week. Read: The sections on sessions, session sheets and debriefing.

  4. POST
    Testing and Checking Refined James Bach and Michael Bolton

    The distinction between checking, which machines can do, and testing, which needs judgement. Use it to audit your own week: how many of last week's hours were checking?

  5. POST
    Using the Agile Testing Quadrants Lisa Crispin, 2011

    Crispin on the quadrants as a planning aid rather than a sequence. Useful for checking that your cadence covers all four kinds of testing and not only the one the release demands.

  6. POST
    Flaky Tests at Google and How We Mitigate Them John Micco, 2016

    Why flaky tests corrode a release process and what one large engineering organisation does about them. Read it before your first week of reading suite results on release-cut day.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: Test strategy and test plans →