LEADCHAPTER 12

Team health and culture

Retention tells you about last year. Team health tells you about next year: measure it with the team, read it as a trend, and turn it into one or two changes the team can see

40 MINENGINEERING MANAGERUPDATED 2026-11-07
PREDICT

You run three teams. In this quarter's health check, one team's score for 'it is safe to raise a problem here' falls from 4.0 to 2.9 out of 5. Delivery is on plan and nobody has resigned. What is the most useful first move?

Team health is the state of the working relationships inside a team: whether people can say what they think, rely on each other, understand what they are for, and keep going at the pace the work demands. Culture is the set of habits that produces that state, the things a team does without being told. At Practitioner level you feel both directly, because you are in the room. At Lead level, running two or three teams through tech leads and newer managers, you are usually not in the room. You see health through instruments, through the managers who report to you, and through what people choose to tell you in skip-levels. This chapter is about building those instruments, reading them honestly and acting on them.

It does not re-teach the ideas underneath. Amy Edmondson’s research on psychological safety, and why safety and high standards are separate dimensions, is in management philosophies. The conversations that repair one person’s experience happen in one-on-ones. Culture across a whole engineering function, and Ron Westrum’s typology of how organisations treat bad news, belong to the Head of Engineering track in engineering leadership philosophies. Here the unit is your two or three teams.

The model: health leads, retention lags

Think of three layers. At the bottom is the work: its pace, its clarity, whether it matters to anyone, how often the pager goes. In the middle is health: how people feel about the work and each other, and whether they speak up, help and stretch. At the top are the outcomes the organisation counts: delivery, quality, and retention.

Problems travel up the layers slowly. An engineer who stops believing the team’s goals make sense does not resign the next day. First they stop volunteering for the hard ticket. Then they stop arguing in planning. Then they take the recruiter’s call. Resignation is the last step of a process that started months earlier, and many people never take it: they stay and give less. That is why “retention is fine” is weak evidence that a team is healthy. It tells you nobody has finished leaving. It says nothing about who has started.

Sort the signals you have by how early they arrive:

Signal Arrives What it tells you Trap
Regretted attrition Months late Someone you wanted to keep has gone By the time you see it, others are already looking
Sick leave, overtime, weekend commits Weeks late Load is above what the team can sustain Easy to read as commitment rather than strain
Delivery and quality Weeks late The team can or cannot keep its promises Healthy teams miss too; strained teams can hit targets for a quarter by burning reserves
Health check scores, as a trend Quarterly How the team rates itself on the things that drive the rest One reading is noise; the trend is the signal
Survey participation Quarterly Whether people think answering is worth it Falling participation is a result, not a nuisance
Behaviour in meetings, skip-levels, retros Weekly Who speaks, who has stopped, whether retros produce actions You only see it if you are there, or if your managers tell you

The leading signals are noisier and more subjective, and that is the trade. You are choosing between data that is precise and late, and data that is rough and early. A group manager needs both, and acts on the early kind.

What the research gives you

Two bodies of work are worth knowing by name, because you will build instruments from them.

Project Aristotle. Google’s re:Work guide, Understand team effectiveness, reports the study in the Why. Effectiveness was measured four ways: executives’ evaluation of the team, the team leader’s, team members’ own, and sales against quota for the sales teams. Five dynamics stood out:

Dynamic The question it asks
Psychological safety Can we take interpersonal risks here without being made to feel foolish?
Dependability Do we reliably complete quality work on time?
Structure and clarity Are roles, plans and goals clear?
Meaning Is the work personally important to us?
Impact Do we believe our work makes a difference?

The guide names psychological safety using Edmondson’s definition: “a shared belief held by members of a team that the team is safe for interpersonal risk taking.” Two caveats. The findings are correlations at one company, and the guide itself notes that team size, which did not matter at Google, matters in other research. Treat the five dynamics as a well-tested vocabulary, not a law.

Edmondson’s team survey. In 1999 Amy Edmondson published a study of 51 work teams in a manufacturing company in Administrative Science Quarterly, with a short questionnaire for psychological safety: whether mistakes are held against you, whether people can bring up problems and tough issues, whether it is safe to take a risk, whether it is hard to ask for help. Several of the items are worded negatively and reverse-scored. Most team health surveys you will meet borrow from this set, often without saying so. Read the paper before you adapt the items, so you know which ones you have changed.

DORA, the research programme behind Accelerate, publishes a third short set: six statements for Westrum’s culture typology, such as whether messengers are punished when they bring bad news, scored on a seven-point scale and averaged. It is designed for the organisation, but the items work for a team.

The instruments, and how they fail

Three formats are in common use. They differ less in their questions than in who talks about the answers.

Format How it runs Strength Failure mode
Spotify squad health check (Kniberg and Lindwall, 2014) A facilitated one to two hour session per team, about ten cards each with an “awesome” and a “crappy” example; the team agrees a red, yellow or green and a trend arrow for each The conversation is the product; teams own the result Turned into a ranking of teams, it teaches everyone to report green
Atlassian Team Health Monitor A 90-minute session, eight attributes, thumbs up, sideways or down, then the team picks one to three to work on Ends in actions with owners Same, and the Play’s rules say so: “We are not comparing teams! Your results are for you alone.”
Anonymous pulse survey Eight to twelve items on a 1–5 or 1–7 scale, two free-text questions, every quarter People say what they would not say in a room Small teams make anonymity thin; results with no follow-up kill participation

Spotify’s authors were explicit about the trap: “Beware of comparing teams.” A mostly green team is not necessarily better than a mostly red one; it may have an easier context, a more optimistic mood, or less candour. They recommended face-to-face sessions over online surveys, and quarterly as a starting cadence, finding monthly too frequent and twice a year too rare.

You will often use two of these together: an anonymous pulse to collect what people will not say aloud, and a facilitated session where the team interprets the results. The pulse gives the honest number; the session gives it meaning.

Anonymity is a design decision. With six people on a team, a single 1 out of 5 on “it is safe to raise a problem” can feel identifiable to the person who gave it. Most survey tools hide results below a minimum number of responses; five is a common default, but check your tool and treat it as a rule of thumb. Rules worth setting before you send anything: results are reported only at team level, never by individual; free text is shown verbatim only with the writer’s consent, otherwise summarised into themes; nobody, including you, tries to work out who wrote what. If HR runs the company engagement survey and reports only for groups of ten or more, you will not get per-team results from it, which is the strongest argument for running your own.

The survey is not a target. The moment health scores appear in a manager’s performance review, they will go up. This is Goodhart’s law at team scale, in Marilyn Strathern’s popular paraphrase: a measure that becomes a target stops measuring what it did. Use scores to start conversations with your managers, never to grade them. Judge the managers on what they did with the result.

From scores to an action plan

The survey is the cheap part. What makes it worth repeating is what happens in the two weeks after it.

  1. The team sees its own results first. Before you summarise them for anyone above you, each team gets its own numbers, the trend against last quarter, and the anonymised themes. The team’s manager or tech lead runs the session; you attend only if invited.
  2. The team interprets. Ask what is behind each red or falling item. You will hear causes the numbers cannot carry: a deadline nobody believes, one person who dominates design review, an on-call rotation that has become a second job.
  3. Pick one or two. A team that tries to fix eight things fixes none. Choose the items that are both important and within reach. Atlassian’s Play caps it at three; one or two is easier to finish.
  4. Separate what the team owns from what you own. Many causes sit above the team: the deadline, the headcount, the on-call scope, the dependency on another group. Those are yours. Write them down as yours, with dates. A team that is asked to fix a problem only you can fix learns that the survey is theatre.
  5. Close the loop in public. At the next check, before the new scores, report what was done against each action. “You said, we did” is the single biggest driver of whether people bother answering next time. If an action was not done, say so and say why.

Watch for burn-out, because it is the health problem most often mistaken for a performance problem. The World Health Organization’s ICD-11 describes it as a syndrome “resulting from chronic workplace stress that has not been successfully managed,” with three dimensions: exhaustion, mental distance or cynicism about the job, and reduced professional efficacy. ICD-11 classifies it as an occupational phenomenon, not a medical condition. The causes are usually structural: sustained overload, pager load, unclear goals. The fixes are structural too: cut scope, move a deadline, fix the rotation as the on-call chapter describes. A wellbeing webinar does not shorten a queue. If an individual is struggling, talk to them in a one-to-one, point them to whatever support your company offers, and involve your HR partner; what you may ask and record about someone’s health varies by country, so check rather than assume.

Culture across two or three teams

At Lead level you have one new problem and one new lever.

The problem is distance. Your picture of each team is filtered through its manager or tech lead, who has every reason to tell you things are fine. That is not dishonesty; most new managers believe their team is fine until it plainly is not. The instruments above are partly a way to get a second reading. Skip-level meetings are the other: a monthly small-group conversation with each team’s engineers, without their manager, about what is working and what is not. Treat what you hear as information to discuss with the manager, never as a case against them. The mechanics of skip-levels at larger scale are in from manager to executive.

The lever is that your teams copy your behaviour, and your managers copy it most. If you thank the engineer who reports a mistake in the incident channel, your tech leads learn that this is what happens here. If you ask “who did this?” in a postmortem, they learn that too. The ritual that writes the generative response down is the blameless review in incidents and postmortems. Your first question in it sets the culture for all three teams.

Three situations recur:

  • One team is unhealthy and the others are not. Look first at the work: is this the team carrying the deadline, the legacy system or the pager? Then at the manager. A first-year manager whose team’s safety scores are falling usually needs coaching on a specific behaviour, such as deciding before the team has spoken, and the coaching is your job. If it does not change, that becomes a performance conversation, handled in performance management, with your HR partner involved.
  • Teams have different norms. One team reviews every pull request within an hour and another within two days; one swears in Slack and another does not. Different is not unhealthy. Align only what crosses team boundaries: incident response, how decisions are recorded, how people are treated in shared channels.
  • The cause is above you. A reorganisation, a hiring freeze, a regulatory deadline. You cannot remove it. You can be honest about it, protect what you can, and take the evidence upward in the form your director needs. Communication and change covers delivering hard news well.

Where practitioners disagree

Anonymous or open? Spotify’s authors preferred open, facilitated sessions and warned that online surveys lose the conversation. Others argue that people in a low-safety team will not say the truth aloud, which is exactly the team you need to hear from. A defensible middle is anonymous scores followed by an open conversation about them, run by the team.

Measure at all? Some managers hold that a good manager already knows how the team feels and a survey is a substitute for talking. Others reply that every manager believes they know, and the survey is how you find out you do not. At Lead level, with teams you are not in daily, the second argument is stronger.

Roll up or not? Your director will ask for one number for the group. Giving it is reasonable. Giving a league table of your teams is not, for the reason Spotify and Atlassian give. Report themes and actions; keep team-level scores with the teams.

Day to day

Weekly. In one-to-ones with each manager or tech lead, ask a health question alongside the delivery questions: who has gone quiet, who is carrying too much, what came up in the retro. Glance at the leading signals you can see without asking: pages per week from the paging tool, weekend activity, retro actions open versus closed. Fifteen minutes, not a dashboard project.

Fortnightly. Attend one team’s retrospective as a guest, rotating across teams, and say little. You are watching who speaks and whether the actions from last time were done.

Monthly. One skip-level per team, 45 minutes, five or six engineers, no manager present. Bring two questions and listen. Afterwards, share themes with the manager the same week.

Quarterly. The health check. Week one: send the pulse, give it five working days. Week two: each team’s session, run by its manager. Week three: a 30-minute review with your managers together, where each says what their team chose and what they need from you, and you commit to the items only you can move. Then a short summary up to your director: participation, themes, actions, and what you are asking for.

Twice a year. The company engagement survey, if there is one. Read it against your own data; where they disagree, ask why. Before performance season, check that no one’s health score has crept into anyone’s review.

In a normal week this costs two to three hours across the group. In survey weeks it costs a day. If it costs nothing, you are reading retention.

BY ORG SIZE
STARTUPunder 30 people

There is no HR team running surveys and no group manager; the founder or CTO is the person holding two or three small teams together. Health is visible, because everyone is in one channel, and invisible, because nobody wants to be the one who complains while the company is fighting to survive. A quarterly session with the Spotify cards, run by the CTO with the whole engineering group, works well at this size. Anonymity is weak with eight engineers, so rely on the open conversation and on one-to-ones. The commonest cause of poor health is pace, and the honest answer is sometimes that the pace will not change until the next funding round.

SCALE-UP30 to 300

This is the size where health checks pay off most and are most often skipped. Teams are new, managers are new, and the group manager is often promoted from a team that was healthy because they were in it. Introduce one team-run format across your teams, agree the anonymity rules with HR before the first run, and expect the first quarter’s scores to be noisy. HR may launch an engagement survey at the same time; align the dates so people are not surveyed twice in a month, and use yours for team-level detail theirs cannot give.

ENTERPRISE300 and up

An engagement survey exists, run by HR on a vendor platform, reported upward by organisation, with thresholds that hide anything smaller than ten or so responses. Its results reach the leadership team, and a falling score creates pressure to act visibly. The risk is that the corporate survey becomes the only instrument and the response becomes a programme rather than a change. Keep a light team-run check underneath it, protect it from being rolled into management scorecards, and treat the corporate results as a second reading. Politics enters when your group’s score is compared with a peer’s; answer with themes and actions, not with rank.

ARTEFACT Run a team health survey and write the action plan ~75 MIN
YOU PRODUCETeam health survey and action plan for two or three teams

Template

# Team health check: <group>, <quarter>
Owner: <you> · Teams: <team (n), team (n), team (n)> · Next check: <date>

## How this runs
- Survey open: <dates> · Anonymous · Minimum <n> responses to show a team's result
- Results shown only at team level; free text summarised into themes unless the writer agrees to a quote
- Each team sees its own results first, in a session run by its manager or tech lead
- Scores are not used in anyone's performance review

## Survey (1 = strongly disagree, 5 = strongly agree)
1. If I make a mistake on this team, it is not held against me.
2. People on this team can bring up problems and tough issues.
3. It is easy to ask others on this team for help.
4. We reliably finish what we commit to, at a quality we are proud of.
5. I know what this team is trying to achieve this quarter and how my work fits.
6. The work we do matters to someone I can name.
7. The pace of the last three months is one I could sustain for a year.
8. On-call and interrupts are manageable.
9. I would recommend this team to a friend as a place to work.
Free text: What is one thing that should change? What should we protect?

## Results
| Item | <Team A> last → now | <Team B> last → now | <Team C> last → now |
|---|---|---|---|
| ... | | | |
Participation: <responses / headcount, per team>
Themes from free text: <per team, in their words where agreed>

## Action plan: chosen by each team
| Team | Item | Action | Owner | Check by |
|---|---|---|---|---|

## Action plan: mine
| Cause above the teams | What I will do | By | How I will report back |
|---|---|---|---|

## Summary for <director>
Participation · Themes · Actions · What I need · (no team ranking)
WORKED EXAMPLE

Cambric is a fictional B2B email and WhatsApp marketing platform: 65 people, 20 engineers in three teams. The Senior EM reports to the CTO and leads the teams through three tech leads: Campaigns (7 engineers, Kemi), Deliverability (6, Musa), Integrations (7, Grace). This is her Q3 plan.

How this runs. Survey open 2–6 September, anonymous, minimum five responses per team. Each tech lead runs a 60-minute session with their team the following week.

Results. Participation 19 of 20 (95%): Campaigns 7/7, Deliverability 6/6, Integrations 6/7. Campaigns: every item has a median of 4 or above, stable. Deliverability: “pace I could sustain” fell from a median of 4 to 2, “on-call manageable” from 4 to 2. Themes: a messaging provider changed its template-approval rules and the team rebuilt the approval flow in six weeks; pages rose from 9 to 22 a week. Integrations: “people can bring up problems” fell from 4 to 3. Theme, from three of the six responses: concerns are not raised in design review because the discussion is settled before quieter engineers speak.

Chosen by the teams. Deliverability: delete or downgrade the five noisiest alerts, owner Musa, by 4 October. Integrations: design reviews start with two minutes of written comments before discussion, owner Grace, from the next review; re-check the item at a mid-quarter pulse on 1 November.

Mine. Deliverability’s pace comes from a commitment I made. I will move the analytics export, 3 of the team’s remaining 8 weeks of planned work, to Q4, and agree it with the CTO and the PM by 20 September. I will coach Grace on facilitating review in our next two one-to-ones.

Summary for the CTO. 95% participation. Two themes: post-migration load on Deliverability, and voice in Integrations’ design review. Four actions, dates above. Request: approve moving the export to Q4. No team scores attached.

Now you

You are the Group Engineering Manager for Member Platform at Sateen, a fictional pensions and wealth platform with 500 people and 120 engineers. You lead 21 engineers in three teams: Contributions (8 engineers, managed by Daniel, in his first year as a manager), Retirement Income (7, managed by Fiona), and Member App (6, whom you manage directly through a tech lead, Callum). Nobody in the group has left in twelve months. HR’s engagement survey reports only for groups of ten or more, so you have one score for all 21 people and it has dropped. Contributions is ten weeks from a regulatory connection deadline, has worked three of the last six weekends, and its pages have risen from 6 to 14 a week. Daniel tells you the team is “tired but fine.” Design and run your first team-level health check across the three teams, then write the action plan: the anonymity rules, the survey, how each team will see and discuss its results, the actions each team might own, the actions that only you can take, and the summary you will send your director.

Self-check

DECIDE

You are the Group Engineering Manager for Member Platform at Sateen, a 500-person pensions and wealth platform: 21 engineers in three teams. Nobody has left in twelve months. Your first team-level health check is back. Contributions (8 engineers, a first-year manager, ten weeks from a regulatory deadline, three of six weekends worked, pages up from 6 to 14 a week) dropped from 4.0 to 2.9 on 'safe to raise a problem'. Member App's pace score fell from 3.6 to 2.4. Retirement Income is steady. Your director says retention is fine and the deadline comes first. What do you do?

READING
  1. HANDBOOK
    Guide: Understand team effectiveness Google re:Work, 2015

    The Project Aristotle findings in Google's own words: the 180 teams, the four effectiveness measures, the five dynamics and the variables that did not matter. Read the caveat about team size too.

  2. POST
    Squad Health Check model: visualizing what to improve Henrik Kniberg and Kristian Lindwall, 2014

    The awesome-and-crappy cards, traffic lights and trend arrows, with an honest section on how the model was misused to rank teams. Steal the warnings as well as the cards.

  3. HANDBOOK
    Health Monitor Atlassian Team Playbook

    A ready-to-run 90-minute session with eight attributes and a facilitation script that ends in owned actions. Its rules of the road include the line about not comparing teams.

  4. PAPER
    Psychological Safety and Learning Behavior in Work Teams Amy C. Edmondson, 1999

    The study of 51 teams and the short psychological safety questionnaire that most team surveys borrow from. Read the measures section before adapting the items. Read: Administrative Science Quarterly 44(2), 350–383.

  5. BOOK
    The Fearless Organization Amy C. Edmondson, 2018

    How a leader responds to bad news, and why that response sets the climate. The part most relevant at Lead level, where your reactions are copied by the managers below you. Read: The chapters on what leaders do to build and repair safety.

  6. DOC
    Capabilities: Generative organizational culture DORA

    Six Westrum survey statements on a seven-point scale, ready to use, with guidance on keeping the wording close so the measure stays valid.

  7. DOC
    Burn-out an 'occupational phenomenon': International Classification of Diseases World Health Organization, 2019

    The ICD-11 definition and its three dimensions, short and authoritative. Use it to tell burn-out from a performance problem before you act on either.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: Managing across teams and upward →