Team design and reorganisations
Splitting a team draws a seam in the system: choose the line by the work that will cross it, give every service one owner, and move on-call last
Your team of twelve is splitting in two. The tech lead proposes one line, the PM another. Which evidence best predicts which split will work?
At the Lead level you run two or three teams, usually through an engineering manager or a tech lead on each. Your structural decisions are small in number and large in consequence: when a team splits, along which line, who leads the new team, which services move where, and how the two or three teams you own depend on each other. Get them right and the teams rarely need you in the middle of their work. Get them wrong and you spend the next year brokering hand-offs you created.
The theory sits upstream. Conway’s law, the Inverse Conway Maneuver, the four team types and three interaction modes of Team Topologies, and the case for long-lived teams are taught at organisation scale in org design at 50, 150 and 500. Read it first. This chapter applies those ideas to the cases a Senior Engineering Manager owns: splitting one team, merging two, and shaping a small group so that the boundaries hold.
The model: a team boundary is a seam
Conway’s observation, applied to one team, is concrete. While twelve engineers sit in one team, a change that touches the mobile app and the matching service is a conversation across a desk. Split them into a mobile team and a services team and the same change becomes a ticket in another team’s backlog, an interface to agree, and a release to coordinate. Martin Fowler’s short essay on Conway puts it plainly: the modular decomposition of a system and the decomposition of the development organisation “must be done together”. When you draw the line between two teams, you are choosing where the system’s seams will be, whether you meant to or not.
That gives you the first rule for any split: draw the line where the work does not cross it. Most of a team’s work should start and finish inside the team. The line that achieves this is usually a seam the code already has, such as two services that talk through an event or an API, rather than a seam between job titles.
The second rule comes from Team Topologies: a team’s scope is limited by what its members can hold in their heads. Skelton and Pais call it cognitive load: the domains, services, tools and on-call surface a team owns. This matters because a team can be too big in two different ways, and they need opposite fixes.
| Symptom | Too many people | Too much scope |
|---|---|---|
| What you see | Long stand-ups, planning in sub-groups, people who barely work together | Constant context switching, slow onboarding, incidents in services nobody remembers |
| Headcount | Above eight to ten | Any size, often normal |
| The fix | Split along a seam in the work | Hand services away, retire some, or get platform support |
| What a split does | Helps | Makes two teams, each still carrying too much |
Ask which one you have before drawing anything. A team of seven that owns eleven services, two mobile apps and a nightly batch job does not need splitting into two teams of three and a half. It needs fewer things to own.
The numbers worth using
Will Larson’s Sizing engineering teams gives the rules of thumb most growing companies converge on. Teams “should be six to eight during steady state”. Managers “should support 6-8 engineers”. “Small teams (<4) are not teams.” “To create a new team, grow an existing team to eight to ten, and then bud into two teams of four or five.” And: “Never create empty teams.” The org design chapter discusses how far to trust them. They are one practitioner’s defaults, not research, and they are still the best defaults you have.
Two of them change your own job at this level. First, budding means a split is something you plan for while the team grows, not something you do when it hurts: when you approve the ninth hire, you should already know roughly where the line will fall. Second, Larson’s range for a manager of managers is four to six managers. With two or three teams you sit below it, which is why many companies ask a Senior Engineering Manager to run one team directly as well as managing the other managers. Be honest about the cost of that arrangement: the team you manage directly gets a manager with half the time.
The third number is not Larson’s, and it is the one most split plans forget. The Google SRE book’s chapter on being on call states that “the minimum number of engineers needed for on-call duty from a single-site team is eight”, with six per site for a team spread over two sites, and caps on-call at 25% of an engineer’s time. That book describes SRE teams, so treat it as a reference point rather than a rule for product teams. The arithmetic still applies. A team of twelve with one weekly rotation puts each engineer on call one week in twelve. Split it into two teams of six, each running a primary and a secondary, and each engineer carries two weeks in six, a third of their time. Plan the on-call design as part of the split, not after it. On-call and incidents for managers covers judging whether a rotation is humane.
Choosing the line
Every split chooses an axis. The table names the common ones at the scale of one team becoming two.
| Split by | Example | Good for | Costs |
|---|---|---|---|
| Feature or customer journey | Loan origination / loan servicing | Most work stays in one team; each team owns an outcome and has one PM to answer to | Some components are touched by both teams and need one named owner |
| Component or layer | Mobile app / back-end services | Deep expertise in one technology; consistent implementation | Most features cross both teams; outcomes belong to neither |
| Side of a marketplace or customer segment | Shippers / carriers; traders / salaried customers | Focus on one set of users and their metrics | Shared core logic gets duplicated unless one team owns it |
| Platform | Android / web | One release cycle per team | A feature that ships on both platforms is two projects |
The default at this scale is the feature split. Large-Scale Scrum, LeSS, defines a feature team as “a long-lived, cross-functional, cross-component team that completes many end-to-end customer features” and lists what component teams produce instead: extra planning between teams, sequential development and “many handoffs”. The arguments for a component team are real but narrower. A component that needs specialist knowledge few engineers have, or that carries concentrated risk, such as a ledger or a payment-switch integration, may deserve a team that owns it and offers it to others as a service. Team Topologies calls that a complicated-subsystem team. At the scale of twelve engineers, though, a third team of three for the risky component breaks Larson’s floor of four, so the usual answer is to give the component to one of the two feature teams as its named owner.
Replay the last quarter. The single most useful test takes an hour. List last quarter’s roadmap items, ten to twenty of them, and the incidents. For each candidate split, mark which new team each item would have landed in, and which items would have needed both. The candidate with the fewest crossings is usually the right line. If every candidate has more than half its items crossing, the team may not be ready to split, or the code may not yet have the seam you need; that is a technical project to do first, and technical decisions as a manager covers budgeting it.
Map every owned thing. Then list everything the team owns: services, repositories, scheduled jobs, dashboards, alerts, runbooks, the on-call rotation, in-flight projects, open hiring requisitions and recurring requests from other teams. Each gets exactly one owner in the new structure. Anything you mark as “shared” is unowned; it will be the first thing to break, and nobody will be paged for it.
Write the interaction. For each pair of teams that depend on each other after the split, write down how they work together and until when. Team Topologies gives you three modes: collaboration, X-as-a-Service and facilitation. Immediately after a split, two teams that were one usually collaborate for a quarter while the interface settles, then move to X-as-a-Service. Write the end date down. Two teams in permanent collaboration are one team with two backlogs.
Who leads the new team
Larson’s “never create empty teams” has a corollary for leaders: never create a team whose manager is a vacancy. You have three realistic options.
Promote from inside. Often the tech lead of one half is the obvious choice, and often they have been doing part of the job already. Tech lead to manager covers whether they should and what their first ninety days look like. Agree a check-in at ninety days where either of you can reverse the move without it counting as failure.
Run it yourself for a while. You manage the new team directly while you hire or grow its manager. This is honest and common. Name the end date, and accept that your other managers get less of you until then.
Hire. Finding an external manager commonly takes three to six months, as a rule of thumb, and the team should not wait as a box with no leader. Split first under one of the other two options and hire into a team that already exists.
Changing someone’s manager, title or role can have contractual weight, and the rules differ by country and by contract. Before you tell anyone that their role is changing, including a tech lead who will lose the title or a manager whose team shrinks, check the plan with your HR partner and, where it applies, local employment law.
Where practitioners disagree
Split early or late. One view, Larson’s, is to bud deliberately at eight to ten, before the pain. The other is to wait until the seam is obvious in the code, because a split along a line the code does not have creates the hand-offs it was meant to remove. Both are right about something. Plan the split early, and time it for when the seam exists.
Specialists in feature teams or together. Mobile engineers, data engineers and security specialists often want to sit together, where they learn from each other and set standards. Feature teams want them inside. Most groups end up with specialists embedded in feature teams and a guild or chapter, a regular meeting across teams, for standards and review. That works when the guild has no authority over delivery; the org design chapter explains why matrix reporting does not.
Merge or split. Splitting gets the attention, but at the Lead level you will merge teams too: two teams of four that are both below the floor, or a team whose product has been retired. A merge is the same exercise in reverse. Replay the work, map every owned thing, and check that the merged scope is something one team can hold.
How much to tell, and when. Some managers consult the whole team on the split line; others decide with the tech leads and announce. Consulting surfaces facts you do not have, such as who has quietly become the only person who understands the reconciliation job. It also turns a structural question into a vote on who works with whom. A workable middle path is to consult openly on the work, the replay and the owned-things list, and decide the people mapping with your managers and HR partner, in confidence.
Running a split
A split of one team is a small reorganisation, and Larson’s Running an engineering reorganization applies at this scale too. His first warning holds: the worst reorganisation is “the one you do because you’re avoiding a people management issue”. If the problem is one person, performance management is the tool, not the chart.
- Diagnose, one week. Write the problem with evidence: stand-up length, planning time, cross-team items, wait times, pages per engineer, incidents in services the responder had never touched. Say whether it is too many people or too much scope.
- Options, one week. At least two lines plus doing nothing, each replayed against last quarter. Review them with your managers, the PMs and the tech leads.
- Map, in confidence. Teams, owners, managers, interaction modes, the on-call design. People mapping with your HR partner.
- Tell people in order. Larson’s advice is to “discuss with heavily impacted individuals in private first”. Anyone whose role, manager or title changes hears it from you in a one-to-one before the team does; then the team together; then neighbouring teams and your manager’s staff meeting. Communication and change covers the announcement itself.
- Move things, two to six weeks. Rituals and backlogs move on day one. Services, alerts and dashboards move over the following weeks, each on a date. On-call moves last, after each new team has shadowed a rotation for its services. Avoid the business’s peak.
- Review at ninety days. Measure the problem you diagnosed, with the same measures. If a boundary is wrong, move the boundary; do not start again.
Expect throughput to dip in the first weeks after a split while the new teams find their rituals. Say so in your next status update, before anyone asks; delivery and planning covers reporting it.
Day to day
Most team design is not a split. It is a stream of small decisions that keep the boundaries you have from rotting.
Weekly. In your one-to-ones with your managers and tech leads, ask which work is waiting on another team and which services nobody wants. When new work arrives, a new service, a new integration, a recurring request from operations, decide which team owns it before anyone starts. Unowned work is how the next split becomes urgent. Decide where each new hire lands as the offer goes out, not on their first day.
Monthly. Look at a short page for your group: team sizes against six to eight, pages per engineer per rotation, cross-team items in flight, the age of the oldest request waiting on another team, and any service without a named owner. One team approaching nine or ten is a split to start planning.
Quarterly. In planning, read the plan against the structure. If one team has three priorities and another has none, or if a priority needs a capability no team owns, you have a hidden reorganisation; make it explicit. Agree any boundary moves with your manager: a service handed over, a collaboration that becomes X-as-a-Service. Larger structural questions, such as a new group or a platform team, go up to the head of engineering’s org design work.
During a split. Expect it to take a fifth to a third of your time for four to eight weeks, as a rule of thumb: diagnosis conversations, option reviews, the mapping session with your HR partner, a one-to-one with every person whose role changes, and a weekly check on what has moved. Your peers hear about the change from you before the announcement, because their teams will meet the new boundaries first. Working with those peer teams and reporting upward is the subject of managing across teams and upward.
There is one team, and the question is when it becomes two. Most startups split by layer because that is how they hired, into front end and back end, and regret it within a quarter. Split by product area instead, once the team reaches eight to ten and the founders can name two outcomes worth a team each. Nobody has the title Senior Engineering Manager; the first engineering manager or the CTO does this. Write down which team owns each service on the day of the split, because until now the founders owned everything by memory.
This is where the chapter lives. Teams bud every few quarters as hiring runs, and you own two or three of them, often with a first-time manager or a tech lead on each. The common failures are splits by job title, components marked as shared, new teams whose manager is a vacancy, and on-call rotations that halve without anyone redoing the arithmetic. You have a head of engineering to agree boundaries with and an HR partner to map people with. Use them early, and run the replay before every split.
Your group sits inside a structure someone else designed, and your boundary moves touch other groups’ services, budgets and reporting lines. A split may need approval from a director, a new cost centre, and an HR process for any change of role; some countries require consultation before changes that affect employment terms, so involve your HR partner from the first draft. Regulated systems add a constraint: an owner of a payment or ledger service may be named in audit and risk documents, so changing it means updating those too.
Template
# Team-split proposal: <team or group>
Author · Date · Status: draft | reviewed | approved | in transition | reviewed at 90 days
Reviewers: <your manager, the EMs and tech leads, the PMs, HR partner>
## 1. Problem and evidence
<Two or three sentences. Too many people, or too much scope?>
- <measure>: <value, source>
- <measure>: <value, source>
Not the problem: <what a split will not fix>
## 2. Options, replayed against last quarter
Last quarter: <n> roadmap items, <n> incidents.
| Option | Teams and sizes | Items needing both teams | What it costs |
|---|---|---|---|
| Do nothing | | | |
| A: <axis> | | | |
| B: <axis> | | | |
Recommendation: <option>, because <reason>.
## 3. Proposed teams
| Team | Mission | Size | Leader | PM |
|---|---|---|---|---|
## 4. Ownership: everything moves to one owner
| Thing (service, repo, job, alert, rotation, project, requisition) | Owner after | Move date |
|---|---|---|
## 5. Interactions
| Team A | Team B | Mode | Until |
|---|---|---|---|
## 6. On-call
<Rotations before and after; each engineer's share of weeks; any shared secondary and its end date; shadowing dates.>
## 7. People and communication
<Who changes role, manager or title; HR partner review date; the order people are told; announcement date.>
## 8. Transition
<Day one: rituals and backlogs. Then dates for each move. Dates to avoid and why.>
## 9. Review
Date: <90 days after the last move>
Measures: <the same measures as section 1, with targets> WORKED EXAMPLE
Mohair is a fictional Nigerian digital bank operating under a microfinance bank licence: 450 people, 130 engineers, about 1.8 million customers, most of them small traders and salaried workers. The Senior Engineering Manager for Lending runs two teams through their managers: Lending (14 engineers) and Credit Models (5).
Problem. Too many people, not too much scope. Lending owns the in-app loan application, the credit decisioning service, disbursement, repayment scheduling and auto-debit, the collections tooling used by 60 collections staff, and the loan ledger posting job. Stand-up takes 35 minutes. Each engineer is on call one week in fourteen, and three of the last four lending incidents were in repayment auto-debit; two were handled by engineers who had never changed it. Collections tooling requests wait a median of five weeks, with eleven open. Salary-backed loans for payroll partners start next quarter. Not the problem: any one engineer’s performance.
Options, replayed against last quarter’s 12 roadmap items. Do nothing: no disruption; the salary-loan project lands on a team already past ten. By component (app and APIs / loan engine): 8 of 12 items would have needed both teams. By customer segment (trader loans / salary loans): 6 of 12, and both teams would change decisioning, auto-debit and the ledger. By loan lifecycle (origination / servicing): 3 of 12, all at the hand-off when a loan is disbursed. Recommended: lifecycle.
Teams. Origination (7): application, decisioning, disbursement, the salary-loan project. Servicing (7): repayments, auto-debit, ledger posting, collections tooling. The current Lending EM takes Servicing. Origination’s tech lead, who has asked for the role, becomes its EM, with a ninety-day check either of them can use to reverse it. The Senior EM’s span becomes three managers. Credit Models collaborates with Origination for one quarter on the salary-loan scorecard, then serves it as X-as-a-Service. Origination publishes a loan-disbursed event that Servicing consumes; the interface is agreed in week two.
On-call. Two rotations of seven. Primary and secondary from the same seven would put each engineer on call two weeks in seven, about 29%. For the first quarter one secondary covers both rotations, drawn from all fourteen: one primary week in seven plus one secondary week in fourteen, three weeks in fourteen, about 21%. Reviewed at the ninety-day point.
Transition. No moves between the 25th and 28th of any month, when salary-day auto-debits peak. The two people changing role are told first and the HR partner reviews before the team hears on 3 February. Stand-ups and backlogs split on 10 February; on-call splits on 10 March after two weeks of shadowing.
Review on 8 June, ninety days after the last move: stand-ups under 15 minutes; collections request median wait under two weeks; no auto-debit incident handled by an engineer who has not shadowed it.
Now you
You are the Group Engineering Manager for Payments at Mohair, which has 450 people and 130 engineers. You run two teams through their managers. Transfers has 13 engineers and owns in-app transfers, the NIBSS Instant Payment integration, bill payments and airtime through an aggregator, and the daily reconciliation job. Cards has 6 engineers and owns debit cards through a card processor. Transfers took 41 pages last month. Reconciliation breaks land on the one engineer who wrote the matching logic. Bills features wait a median of six weeks because transfer incidents take priority. You have four hires approved for next year, and the Head of Engineering wants QR payments for market traders live within two quarters. The Transfers EM proposes a split into Payment channels (app screens, bills, QR) and Payments core (switch integration, reconciliation, ledger posting). The bills PM wants a team of her own. Month-end salary transfers peak between the 25th and 28th. Last quarter’s 14 roadmap items are in the tracker. Write the team-split proposal.
Self-check
You are the Senior Engineering Manager at Twill, a freight-matching marketplace with 85 people and 28 engineers. You manage the Marketplace team of 12 directly, with a tech lead, and the Ops Tools team of 5 through its EM. Marketplace owns the shipper web app, the load and quote services, the matching service, the carrier Android app and load tracking; three of the twelve are Android engineers. Stand-up takes 40 minutes. The tech lead proposes Mobile (5) and Web and services (7). The PM proposes Shipper and Carrier teams. Replayed against last quarter, 7 of 10 items would have crossed the tech lead's line and 3 of 10 the PM's, all at the hand-off from quote to match. How do you split?
- BOOK Team Topologies Matthew Skelton and Manuel Pais, 2019
The vocabulary for team types and interaction modes, and the argument that a team's scope must fit what its members can hold in their heads. Read: IT Revolution; second edition 2025. The chapters on team-first thinking and cognitive load, and on team interaction modes.
- POST Sizing engineering teams Will Larson
The six-to-eight team size, the budding rule and 'never create empty teams', in a page. Read it before you approve the ninth hire on any team.
- POST Running an engineering reorganization Will Larson
The steps from validating the problem to rolling out the change, including who to tell first. Written for larger reorganisations and directly usable for one split.
- DOC Feature Teams Large-Scale Scrum (LeSS)
The strongest case for feature teams over component teams, with the hand-offs and queues component teams create. Read it before accepting a split by job title.
- POST Conway's Law Martin Fowler, 2022
Why team boundaries and system boundaries must be designed together, and why reshaping teams does not instantly reshape code that already exists.
- DOC Being On-Call Andrea Spadaccini, in Site Reliability Engineering (Google), 2016
The source for the eight-engineer minimum rotation and the 25% on-call cap. Run its arithmetic on every split before you halve a rotation.
- BOOK The Manager's Path Camille Fournier, 2017
What changes when you stop managing one team and start managing several: where your time goes, what to delegate, and how to judge the health of teams you no longer work inside. Read: O'Reilly. Chapter 6, Managing Multiple Teams.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.