LEADCHAPTER 12

Org design at 50, 150 and 500

The org chart is an architecture decision: draw team boundaries around the work you want to flow, size them to what people can hold, and change them rarely and on purpose

45 MINHEAD OF ENGINEERINGUPDATED 2026-11-05
PREDICT

A payments company has 48 engineers in six teams organised by layer: web, mobile, API, ledger, data and infrastructure. The CEO asks why adding a spending limit to a card, a small feature, takes six weeks. What is the most likely cause?

Org design is the set of decisions about who works with whom: how engineers are grouped into teams, what each team owns, how teams group into larger units, who manages whom, and how teams are expected to interact. For a team of eight it is barely a question. For an organisation of 150 engineers it is the main lever a VP Engineering has, because every other lever, the strategy, the plan, the architecture, is carried out by the structure.

This chapter gives you the model (the org chart and the architecture are the same decision), the vocabulary most organisations now use, the numbers worth knowing and how much weight each deserves, what breaks at roughly 50, 150 and 500 engineers, and how to run a reorganisation that changes the work rather than only the chart.

The model: the org chart is an architecture

In April 1968 Melvin Conway published “How Do Committees Invent?” in Datamation. His thesis is that organisations which design systems “are constrained to produce designs which are copies of the communication structures” of those organisations. He calls the relationship a homomorphism: the structure of the system mirrors the structure of the group that built it. Fred Brooks later gave the idea its name, Conway’s law, in The Mythical Man-Month.

The practical reading is direct. A boundary between two teams becomes a seam in the system, an API, a queue, a shared table with an argument about who owns it. A seam in the system becomes a coordination cost between teams. If you organise by layer, you get a layered system in which every feature crosses every layer, which is the answer to the Predict above. If you organise by product area, you get a system with product-shaped services and some duplication between them.

The idea’s most useful corollary was named by Jonny LeRoy and Matt Simons in a Cutter IT Journal article: the Inverse Conway Maneuver. If structure shapes architecture, design the structure for the architecture you want. Team Topologies calls it the reverse Conway maneuver and builds much of its method on it. Martin Fowler, whose short essay on Conway’s law is in the reading, adds the caution you need: changing the org will not instantly reshape a system that already exists. The old seams stay in the code until someone moves them, and a new team that inherits a service built by three old teams inherits their seams too.

Conway also wrote the sentence that justifies reorganising at all. Because the first design of a system is rarely the best one, the system concept may need to change, and so “flexibility of organization is important to effective design.” Read that with its cost attached: each change of structure throws away relationships and context, so you change the structure when the architecture you need has changed, not when a leader is new or a quarter went badly.

The vocabulary: Team Topologies

Matthew Skelton and Manuel Pais’s Team Topologies (2019) gives the vocabulary most engineering organisations now use. The platform, API and technical PM chapter covers the four team types and three interaction modes from the platform team’s side; here is what a VP uses them for.

Four team types. Stream-aligned teams own a flow of work from a segment of the business. Platform teams provide a compelling internal product that speeds up stream-aligned teams. Enabling teams coach other teams across a capability gap and then leave. Complicated-subsystem teams own a part that needs deep specialist knowledge, the pricing engine, the ledger, the fraud model. Skelton and Pais expect most teams to be stream-aligned. If your chart has more platform and specialist teams than stream-aligned ones, your customers are a long way from most of your engineers.

Three interaction modes. Collaboration (working closely for a defined period to discover something), X-as-a-Service (one team consumes another’s offering with little coordination) and facilitation (one team helps another learn). The design move is to write down, for each pair of teams that depend on each other, which mode they are in and until when. Collaboration is expensive and should end. Two teams in permanent collaboration are one team with two managers.

Cognitive load as the constraint. The book’s most useful idea for a VP is that a team’s scope is limited by what its members can hold in their heads: the domains, services, tools and on-call surface it owns. When a team is overloaded, it slows down and its incidents rise, whatever its headcount. You size a team’s scope to its cognitive load, and you size its headcount with the numbers below. The thinnest viable platform, Skelton and Pais’s phrase, is how you take load away from stream-aligned teams without building a second engineering organisation underneath them.

Long-lived teams. The book treats the stable team as the unit of delivery: work flows to teams, rather than people being reassembled into project teams. Trust takes months to build, and a team reshuffled every quarter never gets there. This is the strongest argument against frequent reorganisation.

The numbers, and how much to trust each

Three kinds of number appear in every org design conversation. They deserve very different amounts of trust.

Team and span sizes. Will Larson’s Sizing engineering teams, collected in An Elegant Puzzle, gives the rules most scale-ups converge on: teams of six to eight in steady state, managers supporting six to eight engineers, managers of managers supporting four to six managers, and “small teams (<4) are not teams.” Two of his rules matter most in a reorg. “To create a new team, grow an existing team to eight to ten, and then bud into two teams of four or five.” And: “Never create empty teams.” A box with a mission and no engineers is a hiring plan disguised as a structure, and the work assigned to it lands on its neighbours. These are one experienced practitioner’s rules of thumb, not research findings. They are still the best defaults you have.

Dunbar’s number. This is the one most often misused, so be precise about it. In 1992 the anthropologist Robin Dunbar showed that, across primate genera, the average size of social groups correlated with the size of the neocortex relative to the rest of the brain. In follow-up work he extrapolated that regression to the human neocortex and arrived at about 150: the number of stable social relationships a person can maintain, meaning people you know as individuals and whose relationships to each other you can keep track of. He and colleagues later described layers inside it, roughly 5, 15, 50 and 150, each about three times the last.

Three cautions follow. First, it is an estimate of average group size from primate data, not a measured limit on how many colleagues a person can work with. Second, it is contested: in 2021 Lindenfors, Wartel and Lind re-ran the analysis with newer primate data and methods and found 95% confidence intervals so wide, between 2 and 520 people in Stockholm University’s summary, that they concluded a cognitive limit on human group size cannot be derived this way. Third, a company is not a band of hunter-gatherers. Its people have roles, written processes, chat tools and a reporting line, all of which carry coordination that personal acquaintance used to carry.

Organisations use it anyway, and loosely. Henrik Kniberg and Anders Ivarsson’s 2012 paper on Spotify says tribes “are sized based on the concept of the ‘Dunbar number’,” and then states that number as about 100. Stockholm University’s press release on the 2021 paper mentions that Swedish media reported in 2007 that the Swedish Tax Agency had reorganised its offices to stay within 150. Team Topologies borrows the layers as trust boundaries for groupings of teams. Use Dunbar the way they do at best: as a reminder that somewhere between 50 and 150 people, everyone stops knowing everyone, and the informal channels that coordinated the organisation stop working. It tells you to watch for that. It does not tell you where to draw a line.

Ratios between functions. Engineers per product manager, per designer, per SRE. These belong to the function-building chapters: building a product org, building a quality org and building a security function. They matter here because a stream-aligned team without a product counterpart is not aligned to anything.

What breaks at 50, 150 and 500

The numbers in this chapter’s title are engineers, and the transitions are rough. The arithmetic below uses Larson’s spans: teams of about seven, four to six managers per manager of managers.

Engineers Shape What breaks What you design
~50 About 7 teams, 7 managers, one head of engineering, the first director appearing Boundaries drawn by history: teams are whoever was hired together, often by layer. One manager owns two teams. Everyone is in every channel. The head’s span reaches seven or eight. Stream-aligned teams by product area or customer journey. A first, thin platform team. Explicit service ownership. The first manager of managers.
~150 About 21 teams, 21 managers, 4 directors, a VP Nobody knows everyone. Teams that have never met depend on each other. Shared services have no owner. Planning becomes a negotiation between groups. Groups of four to six teams with a director each, cut along the system’s biggest seams. Platform as a product with its own roadmap. Written interaction modes. A complicated-subsystem team where risk demands one.
~500 About 70 teams, 70 managers, 14 directors, 3 or 4 VPs under a CTO or SVP Groups diverge: each builds its own tooling, its own on-call practice, its own ladder interpretation. Reorgs become political because they move budgets and titles. Orgs aligned to business lines, each under a VP, with shared platform, security and reliability functions. An operating model: common planning, levelling and incident practice across orgs.

At 50, the job is mostly drawing the first deliberate boundaries. At 150, it is choosing the seams between groups, because those seams are the hardest to move later. At 500, it is keeping several organisations coherent without forcing them into one shape, which is why the operating model, the rhythm of planning, calibration and review, matters as much as the chart. Running that rhythm is the subject of managing managers and the leadership team.

Product or platform: choosing the axis

Every split chooses an axis. The common ones, and what each costs:

Split by Good for Costs
Product area or customer journey Fast flow, clear ownership of outcomes, a product counterpart per team Duplicated components; shared infrastructure drifts unless a platform owns it
Technical layer or component Deep expertise, consistent implementation of one layer Every feature crosses several teams; outcomes belong to nobody
Customer segment Focus on a market, such as SMEs or enterprise Two teams building the same feature for two segments
Geography or time zone Hand-offs within a region, local regulation Splits a codebase along a line the code does not have

The default is stream-aligned teams by product area, with platform teams carved out only where the capability is genuinely shared and a stream-aligned team cannot hold it alongside its product. Three signals justify a platform or specialist team: several teams solving the same problem badly in parallel; a capability needing specialist knowledge that a product team cannot hire for; and risk concentrated in one place, such as a ledger or card authorisation, where an unfamiliar change can lose money. How to fund and judge a platform team, voluntary adoption as the honest metric, is in architecture governance and platform investment.

Where practitioners disagree

Design for the work or for the people you have. The textbook answer is to design the structure for the work, then map people onto it. In practice a structure that depends on a director you do not have, or puts your strongest engineer under a manager she will not work for, fails in month two. The workable compromise: design for the work first, on paper, without names. Then map people, and change the design only where a mapping is impossible, writing down each change and why.

Reorganise often or rarely. One camp reads Conway’s flexibility sentence as permission to reshape as the system changes. The other, Team Topologies among them, wants long-lived teams whose scope evolves gradually, with whole-structure changes rare. Most experienced VPs end up between them: small boundary moves every quarter, a large reorganisation no more than once every year or two, as a rule of thumb.

Matrix or single line. Spotify’s 2012 model had engineers in product squads but reporting to chapter leads in their discipline. Jeremiah Lee, a former Spotify product manager, quotes a Spotify agile coach in his 2020 essay saying the model was never fully implemented and that chapter leads had little accountability for delivery. Matrix reporting can work for small specialist groups. As a whole-company model it splits accountability between two managers, and each assumes the other has it.

Central or embedded specialists. Whether QA, security and SRE sit in central teams or inside product teams is argued in their own chapters. For a VP the question is the same each time: who is accountable for the outcome, and does the structure make that person’s job possible.

Running a reorganisation

A reorganisation is a project with a diagnosis, a design, a transition and a review. Most fail by skipping the first and the last.

Diagnose, two weeks. Write the problem down with evidence before drawing anything. Useful evidence: the share of roadmap items needing more than one team; the waiting time in shared queues; pages per team and who caused them; services with no clear owner; manager spans; teams under four or over ten. Delivery metrics and reporting covers which measures to trust. If the problem is one person, a reorg will not fix it and will hurt everyone else.

Generate options, two weeks. At least two designs plus doing nothing, each with what it fixes, what it costs, and what it will break. Review them with your directors and your head of product, because the product org must change with you or the stream-aligned teams will have no counterpart.

Design and map, two weeks, in confidence. For each team: name, type, mission, the services it owns, its size now and target, its manager, and its interaction mode with each neighbour. Then the people mapping, with your HR business partner. Check the plan against the headcount plan: new teams imply new managers, and a director role implies levelling decisions, the subjects of headcount, budget and cost and hiring, levelling and compensation.

Transition, four to eight weeks. The chart changes on one day. The work changes over weeks. List what moves: services, repositories, dashboards, alerts, on-call rotations, in-flight projects, open hiring requisitions. Give each a date and a receiving owner. Move on-call last, after the receiving team has shadowed a rotation. Avoid your business’s peak, such as year-end or a launch.

Review, at ninety days. Measure the problem you diagnosed, with the same measure. If it has not moved, say so, and adjust boundaries rather than starting again. How to announce the change, in what order and with what questions prepared, belongs to communication and change.

Day to day

Most org design is not reorganisation. It is a stream of small decisions, and the VP who makes them well rarely needs a large reorg.

Weekly. In your staff meeting with directors, decide where new hires land and which team owns any new service or new commitment before work starts on it. Unowned work is how the next reorg begins. In one-to-ones with directors, ask which teams are overloaded and which boundaries are causing friction; directors see seams before the numbers do.

Monthly. Review a short org health page with your HR business partner and recruiting: team sizes against the six-to-eight range, manager spans, open requisitions per team, attrition, pages per team and who caused them, and the share of work blocked on another team. Flag any team under four or over ten. The from manager to executive chapter covers using skip-levels as a second source.

Quarterly. During planning, read the plan against the structure. If the plan needs a capability no team owns, or puts three priorities on one team, you have a hidden reorg; make it explicit. Agree with each director the boundary moves for next quarter: a service handed over, a collaboration that becomes X-as-a-Service, a team that buds into two.

Annually. With the leadership team and the head of product, look at the whole structure against next year’s strategy and headcount. Ask of each group: would we draw this boundary today? Decide whether a large reorganisation is warranted, and if so, start the diagnosis then, not after the plan is set.

During a reorganisation. Expect it to take a third or more of your time for six to ten weeks: diagnosis interviews, option reviews with directors, mapping sessions with the HR business partner, conversations with every manager whose role changes before anyone else hears, and a weekly transition check on what has moved.

The people you work with most on this are your directors, the head of product, the HR business partner, recruiting, and finance for any change in management cost. The CEO needs to approve large changes and should hear about the problem before the solution.

BY ORG SIZE
STARTUPunder 30 people

There is no org design yet, only a team. The decisions are when to split and along which line. Split when the team passes eight to ten and planning meetings stop working, and split by product area or customer journey, not into frontend and backend, because the second split doubles the hand-offs on every feature. Do not create a platform team; name one engineer as owner of the deployment pipeline and cloud account instead. Write down which team owns each service on the day you split, because the founders currently own everything by memory.

SCALE-UP30 to 300

This is where the chapter lives. You draw the first deliberate boundaries at around 50 engineers and the first group boundaries before 150, while hiring fast, so every decision is made with people who joined last month. The common mistakes are layer teams that grew by accident, a platform team that becomes a service desk, and empty teams created to hold future hires. Your directors are often first-time managers of managers; design spans they can handle. Keep the head of product in every design session, or the product org will be shaped differently from yours.

ENTERPRISE300 and up

The structure exists and every change moves budgets, titles and reporting lines, so it is political before it is technical. Each VP runs an organisation larger than 150, and your design work is mostly the seams between orgs and the shared functions: platform, security, reliability. Reorganisations need HR, legal and finance from the start; in some European countries employee representatives must be informed or consulted before changes that affect jobs. Expect your design to be slower and more negotiated. Your leverage is the operating model, which keeps orgs coherent without making them identical.

ARTEFACT Write the org design proposal and reorg plan ~90 MIN
YOU PRODUCEOrg design proposal with reorg plan

Template

# Org design proposal: <org name>
Author · Date · Status: draft | reviewed by directors | approved | in transition | reviewed
Reviewers: <directors, head of product, HR business partner, finance>

## 1. Problem and evidence
<What is not working, in two or three sentences.>
- <measure>: <value, source>
- <measure>: <value, source>
Not the problem: <what this reorg will not fix, such as one person's performance>

## 2. Constraints
<Headcount now and in 12 months, budget for managers, dates to avoid, regulatory limits.>

## 3. Options
| Option | What it fixes | What it costs | What it breaks |
|---|---|---|---|
| Do nothing | | | |
| A: <axis> | | | |
| B: <axis> | | | |
Recommendation: <option>, because <reason>.

## 4. Proposed structure
| Team | Type | Mission | Owns (services) | Size now → target | Manager |
|---|---|---|---|---|---|

Groups and spans: <who manages the managers; span of each>

## 5. Interactions
| Team A | Team B | Mode | Until |
|---|---|---|---|

## 6. What moves
| Item (service, rotation, project, requisition) | From | To | Date | Done when |
|---|---|---|---|---|

## 7. Transition plan
<Dates for: managers told, teams told, announcement, first moves, on-call handover, last move.>
<Dates to avoid and why.>

## 8. Risks
- <risk>: <mitigation>

## 9. Review
Date: <90 days after the last move>
Measures: <the same measures as section 1, with targets>
WORKED EXAMPLE

Thistle is a fictional UK company providing payroll, auto-enrolment pensions and HMRC Real Time Information filing for 11,000 small businesses: 140 people, an engineering team of 46 engineers and 5 managers under a head of engineering. The plan adds 18 engineers in the next twelve months.

Problem and evidence. The five teams grew by history: Payroll Core (11), Pensions (9), Web (10, all front-end work for every product), Integrations (8) and Infra (8). Last quarter, 23 of 31 roadmap items, 74%, needed two or more teams. The Web team’s queue is seven weeks. Infra’s on-call took 34 pages a month, 24 of them caused by application changes Infra did not write. Payroll Core is past ten and its stand-up takes forty minutes. Not the problem: engineering speed inside any one team, which is fine.

Options. Do nothing: no disruption, but every new hire deepens the Web queue. Split Web and Payroll Core by layer into smaller teams: smaller teams, same hand-offs. Stream-aligned teams by customer journey with a thin platform (recommended): removes most hand-offs; costs a front-end ramp-up for back-end engineers and four to six weeks of transition.

Proposed structure. Pay run (8, stream-aligned, payroll calculation and pay run). Filing and year-end (8, stream-aligned, RTI submissions and year-end). Pensions (8, stream-aligned). Onboarding and billing (8, stream-aligned). Integrations (7, stream-aligned, accounting and bank connections). Platform (7, CI/CD, cloud, observability, the shared component library). Six managers: a senior engineer from Payroll Core is promoted to the sixth, and the first of the 18 hires backfills that place, keeping the total at 46. The head of engineering’s span is six, the top of the four-to-six range, so a director for the three payroll and compliance teams is hired when the seventh team forms, planned for Q3.

Interactions. Platform to all: X-as-a-Service. Pay run and Filing: collaboration for their first quarter after the split, while the tax-year changes settle, then X-as-a-Service.

What moves and when. Not before 5 April, the end of the tax year. Web engineers join stream teams on 12 May. Each stream team takes on-call for its own services after shadowing one Infra rotation; last handover 23 June.

Review on 21 September, ninety days after the last move: cross-team roadmap items below 40%; no queue for front-end work longer than two weeks; Platform pages caused by application changes below 10 a month.

Now you

You are VP Engineering at Sorrel, a fictional company providing corporate cards and expense management to 6,000 small and medium businesses in the UK and Ireland, issuing Visa cards through an issuer-processor. Sorrel has 520 people. Engineering is 140 engineers in 17 teams, 17 managers and three directors, whose spans are seven, six and four managers. The board has approved 50 more engineers next year, and the CEO wants a new product line, Bills, for paying suppliers, staffed within two quarters. Every product team changes the card-authorisation and ledger code; two of the last six months’ sev-1 incidents came from ledger changes made by product teams. The Ledger team has twelve engineers. Three teams have each built their own approval-rules engine. Your two most senior directors disagree: one wants product lines owning their full stack, the other wants a platform split. Write the org design proposal and reorg plan for the next twelve months.

Self-check

DECIDE

You are VP Engineering at Sorrel: 140 engineers in 17 teams under three directors, growing to 190 next year, with a new product line, Bills, to staff within two quarters. Every product team changes the card-authorisation and ledger code, and two sev-1 incidents in six months came from those changes. Three teams have built their own approval-rules engines. One director wants to split by product line; another wants to split by platform layer. How do you organise?

READING
  1. PAPER
    How Do Committees Invent? Melvin E. Conway, 1968

    The original statement of Conway's law, including the part usually left out: that the first design is rarely the best, so the organisation must be able to change. Read: The whole paper, on the author's site; it is short. Read the conclusion twice.

  2. BOOK
    Team Topologies Matthew Skelton and Manuel Pais, 2019

    The vocabulary most engineering organisations now use for team types and interactions, and the case for long-lived teams sized to their cognitive load. Read: IT Revolution. Chapter 2 on Conway's law, chapter 3 on team-first thinking and cognitive load, chapter 7 on interaction modes.

  3. BOOK
    An Elegant Puzzle: Systems of Engineering Management Will Larson, 2019

    The team sizes, spans and budding rules that turn a design into a headcount, from someone who has applied them through hypergrowth. Read: Stripe Press. The Organizations chapter, starting with 'Sizing engineering teams'.

  4. POST
    Conway's Law Martin Fowler, 2022

    A short, careful reading of Conway, including who coined the Inverse Conway Maneuver and why it is not an instant fix for a system that already exists.

  5. PAPER
    'Dunbar's number' deconstructed Patrik Lindenfors, Andreas Wartel and Johan Lind, 2021

    Read it before you put 150 on a slide. It shows how wide the uncertainty around Dunbar's estimate is and why a group-size limit cannot be derived from primate brains. Read: Biology Letters. The abstract and discussion.

  6. PAPER
    Scaling Agile @ Spotify with Tribes, Squads, Chapters and Guilds Henrik Kniberg and Anders Ivarsson, 2012

    The most copied org design in software, including its use of Dunbar. Read the authors' own disclaimer that it was a snapshot, then read the critique below. Read: The sections on tribes and on the matrix.

  7. POST
    Spotify's Failed #SquadGoals Jeremiah Lee, 2020

    A former Spotify product manager on why the model was never fully implemented there, and what the matrix did to accountability. The best argument against copying another company's chart.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.