Contractors, outsourcing and vendors
You can pay someone outside the company to do the work, but not to know how your system works or to answer for it: pick the right kind of outside help, price it honestly, and write the exit before you sign
A senior engineer on your payroll has a base salary of ₦30m a year, and finance loads it by 1.3 for employer contributions, cover and equipment. A contractor of the same seniority charges ₦250,000 a day and bills 220 days a year. Over a full year, how do the two compare?
People say “outsourcing” for three different purchases. You can pay for people who join your teams, for a piece of work delivered by someone else’s team, or for a product or service that someone else runs. Each has its own contract, its own way of going wrong and its own way of ending. Most of the trouble comes from buying one and managing it as if it were another.
At Lead level your signature is on the purchase. This chapter is about choosing between the three, pricing them, reading the contract, managing work done by people who do not report to you, and getting the work back. The build versus buy decision itself belongs to architecture governance and platform investment, and the technical evaluation of a vendor to the Staff track’s the principal and the business. This chapter starts where they stop: someone outside is going to do it.
Three things called outsourcing
| Contractor | Agency or software house | Vendor | |
|---|---|---|---|
| What you buy | A person’s time, by the day or month | An outcome, described in a statement of work | A product or managed service, the same one its other customers get |
| Who directs the work | Your manager, inside your team | Their delivery lead, against your acceptance | Their roadmap; you configure and integrate |
| Where the knowledge ends up | In the contractor’s head, unless you plan otherwise | In the agency’s team, unless the contract and the working method say otherwise | With the vendor, by design |
| The paper | A contractor agreement, often through a staffing firm | A master services agreement and a statement of work | Subscription terms, an order form, a service level agreement |
| How it ends | Notice, often a few weeks | Final delivery, or termination and a handover | Non-renewal after a notice period, then a migration |
| Right when | You need a skill for months, or cover for leave or a hiring gap | The work is bounded, outside your advantage, and your teams cannot staff it | Many companies have the problem and it is not what customers pay you for |
With a contractor you manage a person. With an agency you manage an agreement and its output. With a vendor you manage a dependency. A contractor run like a vendor, given a ticket and left alone, becomes the only person who understands something. An agency run like a group of contractors costs agency rates for work you are managing yourself.
The right answer, or a way of not deciding
Each kind has an honest use and a use that hides a decision.
Contractors are honest when the need has an end: a specialist for a migration, cover for parental leave, a bridge while a hire closes. They hide a hiring decision when the headcount plan was capped and the work was not. Will Larson’s Build versus buy names the cause: “unfungible budgets”, where the “company views headcount budget and vendor budgets as wholly distinct”. He is describing a sensible vendor purchase that separate budgets blocked; the same separation lets contractor spend grow where headcount cannot. The test is tenure. A contractor you have renewed for more than a year, and would renew again, is a permanent role you have not admitted to. The budget itself is in headcount, budget and cost; whether your company approves roles or money, show contractors beside employees in the plan.
An agency is honest when the work is a bounded piece that someone else has built many times: a marketing site, a one-off migration tool, a set of screens over an API you own. It hides a prioritisation decision when the chief executive wants something that did not make the roadmap and, rather than say what stops, the company buys a second roadmap from outside. The work still needs your people for specifications, API changes, review and release, so the decision you avoided comes back as a tax on the teams you were protecting.
A vendor is honest for a utility. It hides a decision when you buy a product to avoid fixing your own process.
The most expensive evasion is “we cannot hire mobile engineers”, said about the thing your customers touch every day. If the skill is permanent and central, hiring is a problem to solve, not a reason to rent the skill for ever.
What stays in-house
Ferrowave, a bulk payouts API with 38 engineers in six teams, has both of the classic problems.
In 2024 a Lagos software house built its Approver app, the mobile app in which a customer’s finance director approves a payout batch, for a fixed ₦48m. It shipped on time. The source stayed in the agency’s repository, the app-store accounts and signing keys stayed in the agency’s name, and no Ferrowave engineer ever built it. This year a change that an engineer inside sized at four days came back from the agency quoted at ₦9m and six weeks. The two developers who wrote the app had left. Ferrowave cannot change its own app.
The second problem is Kayode, a contractor on the Bank Connectors team for three years. He wrote the code that decides what happens when a bank times out on a transfer: retry, query or reverse. That code is what stops a salary being paid twice (the idempotency lesson shows the mechanism). He is its only confident reviewer, his contract ends on 14 days’ notice from either side, and when he was away for three weeks in August a connector change waited for him. Nothing has gone wrong. Modupe, the VP Engineering, knows that is not the same as safe.
Two things stay inside, and the stories are one of each.
Your advantage. Martin Fowler’s utility and strategic split is the cleanest test: “To my mind it’s all about whether the underlying business function is a differentiator or not.” For a utility function, his advice is that “you buy the package and adjust your business process to match the software.” For Ferrowave the differentiator is getting money into any Nigerian bank account once, correctly, and proving it: the payout state machine, the bank connectors, reconciliation. Payroll software and the marketing site are utilities. Kayode’s code is on the wrong side of that line.
The knowledge of how your system works. This applies even to the parts that are not your advantage. Outsourcing the Approver app was defensible. Losing the ability to change it was not. Conway’s law (covered in org design at 50, 150 and 500) says a system copies the communication structure of the organisation that builds it, and a boundary between two companies is the thickest communication boundary you will ever have. Put it where the interface is narrow and stable. Sriram Narayan’s Products Over Projects explains what is lost otherwise: “Knowledge grows and stays better within stable, long-lived teams”, while a project team hands over and moves on. His answer for outside teams is that vendors “may be asked to supply a stable, long-lived, ideate-build-run team with some key roles staffed with in-house talent.”
A working list of what never leaves:
- A named employee for every system who can build, change and release it.
- Decisions on architecture, the data model and the interfaces between outside work and your core.
- Production access, release and on-call for anything on a customer’s path.
- Repositories, cloud accounts, app-store accounts, domains and signing keys, in the company’s name.
- Product decisions, and the relationships with customers and regulators.
What a contractor really costs
Here is the arithmetic with Ferrowave’s figures, which are illustrative.
| Employee | Contractor | |
|---|---|---|
| Rate | ₦30m base × 1.3 = ₦39m a year | ₦250,000 a day |
| Days | 220 worked | 220 billed |
| Cost per working day | ₦39m ÷ 220 ≈ ₦177,000 | ₦250,000 |
| One year | ₦39m | ₦55m |
| To start | Recruiter’s fee at Ferrowave’s rate, 20% of base: ₦6m; months to hire | Days or weeks |
| To stop | Notice, and whatever the law and the contract require | The notice in the contract |
The 220 days are 260 weekdays less 12 public holidays, 20 days of leave and 8 for sickness and training in Ferrowave’s calendar. The 1.3 is its finance team’s load factor for the employer’s pension contribution, group life and health cover, statutory levies, a laptop and tools. Use your own finance team’s factor; the reasons are in headcount, budget and cost.
Over a year the contractor costs ₦16m more, about 41%. By the month that is ₦4.58m against ₦3.25m, a gap of ₦1.33m. The hire carries a ₦6m fee before the first day, so the two lines cross at ₦6m ÷ ₦1.33m, about four and a half months. Under that, the contractor is cheaper in cash. Over Kayode’s three years the bill is ₦165m against ₦123m for an employee, fee included: ₦42m more, and the knowledge still belongs to him.
The table leaves out four things.
- Your people’s time. Onboarding, review and direction cost the same as for an employee, and you pay them again each time a contractor is replaced.
- What leaves with them. It shows as a cost on the day they go.
- Currency. Some senior contractors quote in dollars. A naira budget with a dollar rate carries exchange risk that finance should price.
- Status. Someone who works your hours under your manager for years can look like an employee to a court or a tax authority, and the rules differ by country. In the UK, for example, the guidance on the off-payroll working rules (IR35) says “the client will be responsible for determining the employment status of the worker” in most cases, with an exception for small clients outside the public sectoras of 2026-11. For Nigeria, Kenya, Ghana or wherever your contractors sit, take advice from an employment lawyer and a tax adviser before the engagement starts.
An agency’s day rate also carries its bench, sales, management and margin. The difference buys delivery management and the duty to replace a person who leaves.
The contract, clause by clause
Your lawyer drafts and negotiates. You read, because only you know what each clause means on a Tuesday. GitLab’s public handbook states the first rule plainly: “All work that is done with a vendor must have a completed contract to be compliant and work may not be started until a contract is in place.”
| Clause | What to look for | Without it |
|---|---|---|
| Statement of work | Deliverables, acceptance tests, milestones tied to payment, a change process, named key people | You pay for effort and argue about what done meant |
| Intellectual property assignment | Everything made for you is assigned to you, on payment at the latest; the supplier’s own pre-existing code is listed and licensed to you with source; open-source components are listed | You hold a licence to your own app |
| Confidentiality | A non-disclosure agreement before you share anything; a data processing agreement if they touch personal data; where data may be held | Customer records on a personal laptop |
| Access and security | Named accounts through your sign-on, least privilege, no production access by default, removal within a stated time | A leaver’s token that still works |
| Service levels | For a service: uptime, response and fix times, how they are measured, the remedy. For delivery: defect response during a warranty period | A credit note worth a fraction of your loss |
| Liability | The cap, what sits outside it (confidentiality, data, IP infringement), indemnities, insurance | A cap of one month’s fees against a breach |
| Exit | Notice both ways, a handover period, source with history, documentation, transfer of accounts and keys, return and deletion of data, transition help at a known rate | The app nobody inside can change |
Price and scope. A fixed price feels safe. Fowler’s note on fixed price says the price can be fixed but the scope cannot: “what it really means is that you can’t come up with a fixed scope contract.” His remedy is to fix budget and date and let scope vary. Where a supplier will not agree to that, use time and materials with a cap, short milestones and acceptance on working software.
Ownership and the break. The UK government’s guidance on purchasing strategy, part of its Technology Code of Practice, tells public bodies to “be explicit about the ownership of intellectual property involved in the delivery of a technology service”, and, where economic, to “include a break clause at a maximum of 2 years which allows you to terminate the contract with minimal exit costs”as of 2026-11.
Service levels. A service level agreement tells you what you get back when the service fails, not how often it will fail. Measure the supplier yourself against your own service level objectives.
The exit clause has one test that catches most failures: the final payment falls due when a named employee has built and deployed the work from a clean checkout, without help.
Managing a team you do not manage
Contractors in your teams are managed by your engineering managers as team members: same stand-up, same review, same repository. The UK government’s Service Manual says “Treat contractors and permanent staff as equal team members”, and further down the same page: “You must make sure you have a plan to pass knowledge from contractors to the rest of your team.” Make the plan a rule: no contractor is both the only author and the only reviewer of anything on the money path.
An agency’s team is not yours to manage. You manage the agreement and the output.
- One owner inside, a manager or senior engineer with hours set aside, and one lead on their side.
- Their code in your repositories from the first commit, through your pipeline and your review.
- A weekly demonstration of working software in your staging environment, and milestone acceptance against tests you wrote.
- Problems with one of their engineers go to their lead. Directing or reassigning their people undermines the lead you are paying for and blurs who is responsible for the result.
A vendor is managed too. Larson again: “To get the full value from vendors, you have to invest in managing vendors well.” His example is Amazon issuing vendors “quarterly report cards grading their performance against the contract and expectations.” Every vendor needs an owner inside who knows the renewal date.
Choosing a vendor: lock-in and concentration
The model for the choice (core, cost and exit) and the exit plan are in architecture governance and platform investment. Security due diligence (tiering suppliers by the data and access they hold, reading a SOC 2 Type II report, reviewing an integration’s scopes and tokens) is taught in the Security track’s pentests, bug bounties and vendor risk. Your part is to make sure the review happens before signature, and that a no from security can stop a purchase.
Lock-in. The UK government’s guidance on managing technical lock-in in the cloud defines it as the point where “switching from one technology or provider to another is difficult, time consuming and disproportionately expensive”, and then admits that “in the cloud the advantages of being locked-in can often outweigh the disadvantages.” Larson’s aim is to be vendor-flexible, “being able to move a subset of your work to a better suited tool”, not vendor-agnostic.
Concentration has three forms: one supplier doing too many things for you (the agency that holds three of your systems); two suppliers that share a dependency you cannot see (both SMS providers routing through one aggregator); and a supplier that is itself fragile. GitLab’s procurement handbook asks for a financial viability check when, among other triggers, the vendor is “a private company, LLC or self-employed” or provides software or “services where it would take over 1 week to replace or swap”. Add a time-to-replace column to the vendor register and lock-in and concentration both become visible.
When a regulator cares who your suppliers are
Regulators hold the licensed firm responsible for what its suppliers do, and they write that into rules. In Nigeria the Central Bank’s Risk-Based Cybersecurity Framework and Guidelines for Deposit Money Banks and Payment Service Banks requires those institutions to run a third-party risk management framework covering “vendor selection, due diligence, contract negotiations, ongoing monitoring and incident response”, to “maintain a record of all third-party service providers”, and to write into service level agreements a “right to audit third parties or receive audit reports”as of 2026-11.
You may not be a bank. If you sell to one, those duties arrive in your contract and reach through you to your own suppliers. Ferrowave’s bank customers ask who its subcontractors are and whether they can reach payout data, so the agency and Kayode are on a bank’s questionnaire.
Personal data adds a second regulator. The Nigeria Data Protection Commission’s General Application and Implementation Directive 2025 expects a processor to work under a data processing agreement, lists what the agreement contains, and says every controller or processor “shall be accountable for the actions or inactions of third parties it engages or permits to carry out data processing” (Article 34)as of 2026-11. An agency with access to your production database is likely to be a processor, and a lone contractor may be one; ask your data protection lead.
TSB is the same principle under UK rules. In practice: keep the supplier register as if someone will inspect it, ask your compliance lead before outsourcing anything a licence depends on, and take legal advice on what must be notified or approved. Your wider duties as the accountable executive are in owning reliability, security and compliance.
Bringing work back in-house
Work comes back because it became core, the supplier got worse or the cost crossed the line. The sequence matters more than the speed.
- Decide early. The best time is at signature, in the exit clause. The next best is six months before a renewal.
- Put the owner inside first. Hire or assign the engineers before you give notice. At Ferrowave, Modupe pairs Bolanle, a senior engineer on the team, with Kayode for a quarter: Bolanle writes every connector change and Kayode reviews, then they swap. They add tests for each timeout case and a runbook. Modupe also offers Kayode a permanent role, after reading what the staffing firm he is engaged through charges for conversion.
- Move the assets. Repositories with history, accounts, keys, store listings, domains and pipelines move into the company’s name, and secrets are rotated. For the Approver app Ferrowave paid the agency for a handover the first contract should have included.
- Prove it. An employee ships a change to production alone.
- Expect a slow quarter, and tell the chief executive and product before it starts.
Where practitioners disagree
Contractors as a standing layer. Some heads keep a share of capacity as contractors so that a downturn does not mean redundancies. Others convert or end every engagement within a year. The first protects employees and leaks knowledge; the second costs flexibility.
Never outsource the core. Purists say the product is never built outside. Plenty of startups launch on an agency-built product because it is the only way to launch at all. Both can be right: the launch is rational, the debt is the knowledge, and the first engineering hires repay it.
Day to day
Weekly. A short check with the inside owner of each active engagement: what was demonstrated, what was accepted, who joined or left the supplier’s team. Approvals for contractor extensions, each with one question: what would hiring look like?
Monthly. The supplier register with finance and procurement: renewals and notice dates in the next 120 days (GitLab’s handbook says the renewal process “should start at least 90 days ahead of the renewal date”). The contractor list by tenure, with a decision for anyone past nine months: convert, end or justify. The list of systems with only one person who understands them, employee or not.
Quarterly. A business review with each strategic supplier: what the contract promised, what was delivered, what changes. Re-tiering with your security lead for suppliers whose access has grown. A concentration check. One exit test: build and deploy an outsourced system from your own checkout, or export your data from a vendor.
Annually. Sourcing as part of the plan: which work moves inside, which moves out, and what the contractor line is for.
The meetings that matter are the contract review with legal before signature, which you attend in person; milestone acceptance; and the supplier’s quarterly review.
An agency or a pair of contractors may have built the whole product, and that was a reasonable way to launch. Contracts are thin or missing. Your job is to get the basics into the company’s name: repositories, cloud and app-store accounts, domains, signing keys, and a signed IP assignment from everyone who ever wrote code, including the founder’s friend. Then make sure one employee can build and release everything. Buy utilities freely on a card, but keep a list. The first engineering hires are how the knowledge starts to come inside.
Procurement and legal arrive, and so do customers’ security questionnaires asking who your suppliers are. You write the first sourcing rules: what stays in-house, who may sign, a supplier register with owners, renewal and notice dates, and a security review before signature. Contractors taken on in the rush have become long-standing, and each needs a decision. The agency-built parts of the product come back one at a time as teams form around them. Expect your first serious negotiation with a cloud or payments vendor, and bring a cost model.
Procurement, vendor management, legal and third-party risk are functions with their own processes and preferred-supplier lists. Managed-service contracts run for years, whole functions sit with outsourcing partners, and regulators inspect the register. The problems are scale and politics: contractor populations in the hundreds that finance counts differently from staff, suppliers who are also customers, incumbents who know your systems better than your own people, and exit clauses nobody has tested. Your work is to keep enough engineering capability inside to judge the suppliers, and to test one exit a year.
Template
# Sourcing decision: <the work>
Owner · Decider · Date · Decide by · Status: draft | in review | decided
## The decision
<One sentence: who does this work, and until when. Why now.>
## What kind of sourcing is this?
- Contractor (people join our team) | Agency (an outside team delivers an outcome) | Vendor (we buy a product or service)
- Why not the other two. Why not hire. What we are not stopping to make room.
## What stays in-house
- Owner inside: <name, role, hours a week>
- Decisions we keep: <architecture, data model, release, production access>
- What we must know and hold when this ends: <list>
## Options and cost over <period>
Assumptions: loaded cost <amount> (source: finance), day rates, working days.
| Option | Outside cost | Our people's time | Total | First delivery | What we hold at the end |
|---|---|---|---|---|---|
| | | | | | |
## Recommendation
<Option, in two sentences: what we pay extra for, and what we give up.>
## Terms we need before signing
| Term | What we need | Status: agreed / open / legal to confirm |
|---|---|---|
| Statement of work | deliverables, acceptance, milestones, change process, key people | |
| IP assignment | assignment on payment; background IP listed and licensed; open source listed | |
| Confidentiality and data | NDA; data processing agreement if personal data; where data sits | |
| Access and security | named accounts, least privilege, production access, offboarding time | |
| Service levels | response, fix, uptime, remedy | |
| Liability | cap, exclusions, insurance | |
## How delivery is managed
- Cadence: <weekly demo, milestone acceptance>
- What "accepted" means: <tests, deployed where, by whom>
- If a milestone is missed: <what happens, who decides>
## Exit
- Notice: us <n> days, them <n> days
- Handover: <n> days; what is handed over (source, history, documents, accounts, keys, data)
- Test before final payment: <named employee> builds and deploys from a clean checkout
- After the end: warranty <n> days; transition help <n> days at <rate>
- What would make us bring this in-house or switch: <trigger>
## Who else cares
- Security review: <tier, link>
- Regulator or customer contracts: <which, what they require> | none
- Concentration: what else this supplier does for us; time to replace
## Review date WORKED EXAMPLE
Ferrowave (140 staff, 38 engineers, 210 business customers) must rebuild its Customer Console, the web dashboard where customers upload payout files, track them and download the reconciliation file. Modupe, the VP Engineering, wrote this.
The decision. Who rebuilds the Console in the next five months; Modupe decides by 30 November. Why now: its front-end framework is out of support, and the Console team of five is committed to pension-schedule work through June.
Kind of sourcing: agency. Screens over an API we own are bounded work and not our advantage. No product on sale fits our approval flow, so there is no vendor to buy. Hiring is too slow and leaves three people more than the Console needs afterwards. Contractors would leave the lead’s judgement and all the testing with us, and we have no tester.
Stays in-house. Funke, the Console engineering manager, owns it at six hours a week. We keep the Console API, authentication, the approval rules, the design system, the pipeline and all production access. The agency works in staging on synthetic data.
Cost over the next twelve months (B and C run for 22 weeks, about five months: 110 billable days, holidays not deducted, and then stop; loaded Console engineer ₦31.2m a year, from finance: ₦24m × 1.3).
| Option | Outside cost | Our time | Total | First delivery |
|---|---|---|---|---|
| A. Hire three engineers | Recruiter fees ₦14.4m | Eight months of three salaries, ₦62.4m | ₦76.8m, then ₦93.6m a year | About month seven |
| B. Three contractors at ₦220,000 a day | ₦72.6m | One engineer half-time as lead, ₦6.5m | ₦79.1m | Month two |
| C. Agency: lead, two engineers and a tester at a blended ₦200,000 a day | ₦88m, capped | Two engineers half-time on review, ₦13m | ₦101m | Week five |
Recommendation: C. It costs ₦21.9m more than B. The premium buys a delivery lead, a tester and the agency’s duty to replace anyone who leaves. A change reserve of ₦8.8m (10%) is released only by Funke, so the ceiling is ₦109.8m, or ₦113.8m with the transition help below. Two Console engineers at half-time on review is not free: the bulk-upload rework moves from June to September, and nothing else on the Console roadmap stops.
Terms. Statement of work agreed: time and materials to the cap; four milestones at weeks 5, 10, 15 and 19, each releasing up to 20% (₦70.4m in all) when deployed to staging from our pipeline and passing our acceptance tests. IP assigned to Ferrowave on each payment; the agency’s own components listed in a schedule and licensed perpetually with source (legal to confirm). NDA signed (agreed); no personal data, so no data processing agreement, and none without a new decision. Named accounts through our sign-on, removed within 24 hours of leaving (agreed). Service levels: a defect found in warranty is acknowledged within one working day and fixed within five (agreed). Liability: we seek a cap at the contract value (₦88m), with breach of confidentiality, IP infringement and loss of our data outside the cap, and professional indemnity insurance in force for the term; open, with legal.
Delivery. Weekly demonstration in our staging. A milestone missed by more than two weeks goes to Modupe and the agency’s managing director, and we may terminate.
Exit. We give 30 days’ notice, they give 60. All code is in our repositories from the first commit, and hosting, domains and deploy credentials never leave our accounts. Weeks 20 to 22 (15 days) are handover. The last 20% (₦17.6m) is paid when Funke, or the reviewing engineer named in the statement of work, builds and deploys from a clean checkout, unaided. Warranty 60 days; transition help of up to 20 days at ₦200,000 (₦4m at most) within six months. No retainer afterwards: the Console team owns it.
Who else cares. Security tier 2: source code and staging through our sign-on, no production access, no customer data. Our bank customers’ contracts ask us to list subcontractors with system access; this one has none in production. This agency does no other work for us and is not the firm that built the Approver app. Review at week 10.
Now you
You are head of engineering at Tallowmere, an online pharmacy in Ibadan with same-day delivery: 40 people, 9 engineers. Riders are coordinated by WhatsApp and a spreadsheet across about 520 deliveries a day, and late deliveries are rising. Uzoma, the chief executive, wants a rider app in three months. You have three offers. A Lagos software house quotes ₦38m fixed for 14 weeks, built in its own repository on a delivery framework it licenses and does not assign. Two contractors are available at ₦180,000 a day each. A delivery-management vendor charges about ₦60 per delivery at today’s rate, priced in dollars, on a 12-month minimum, with customer names, phone numbers and addresses held outside Nigeria. Finance gives you a loaded cost of ₦18m a year per engineer. Complications: every option must integrate with the order-and-prescription service, which only Dolapo understands, and she is on leave for four weeks from next month; and your engineers are midway through a checkout rewrite. Write the sourcing decision memo. Cost the options over twelve months, say what stays in-house, and set out the exit terms you would need before signing.
Self-check
You are head of engineering at Owoleaf at 60 people: a consumer wallet live in four states, with 14 engineers. The app is the product. Two engineers built the Android and iOS apps; one left in March and Yewande now maintains both alone. Releases have slipped from fortnightly to every six weeks, and the chief executive wants a rebuilt app with a new onboarding flow in five months. A Lagos software house offers the rebuild for a fixed ₦90m in 20 weeks, in its own repository, handed over at the end. A mobile team of four would cost about ₦88m a year loaded, and each hire took you four months last year. What do you do?
- POST Build versus buy Will Larson, 2020
A short, practical method for a vendor decision: risk first, then value against cost. Read the closing note on vendor management, and the passage on separate headcount and vendor budgets, which explains a lot of contractor spend.
- DOC Working with contractors or third parties GOV.UK Service Manual, 2024
One page on embedding outside people in a team: equal treatment, least access, and a plan to pass knowledge on before a supplier changes. Written for government teams and usable anywhere.
- DOC Define your purchasing strategy UK Government, Technology Code of Practice, 2026
Point 11 of the Technology Code of Practice. Read the contract section for intellectual property ownership, break clauses and checking that a supplier meets expectations after signature.
- HANDBOOK The GitLab Procurement Team GitLab
A working company's whole supplier lifecycle in public: selection, review steps with their lead times, renewals, cancellation and the triggers for a financial viability check. Use it as a model when you write your own process.
- POST Products Over Projects Sriram Narayan, 2018
Why knowledge is lost when a project team disbands, and what to ask of an outside team instead. Read the short answer on outsourced teams near the end before you write a statement of work.
- POST Utility Vs Strategic Dichotomy Martin Fowler, 2010
The shortest useful test for what to keep inside: is the business function a differentiator or not. Read it before you argue about what counts as core.
- DOC TSB fined £48.65m for operational resilience failings Financial Conduct Authority, 2022
The regulators' own summary of a migration that depended on a critical supplier and failed. Read it for what a regulator expects a firm to control when someone else does the work.
- DOC Risk-Based Cybersecurity Framework and Guidelines for Deposit Money Banks and Payment Service Banks Central Bank of Nigeria, 2024
Read section 2.3 on third-party risk management and, in Appendix II, the part on knowing your third-party service providers. If you sell to a Nigerian bank, these are the duties its contract will pass on to you.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.