Owning reliability, security and compliance as a leader
At the top of engineering you do not set each SLO or run the audit. You decide who signs for each risk, what the company trades for it, and what happens without a meeting when the line is crossed
A penetration test finds a high-severity flaw in your merchant onboarding service. The fix needs six weeks of a team's time; the product team wants to keep shipping onboarding features meanwhile. Who should sign the risk acceptance for the six weeks?
The Head of Engineering or VP Engineering owns reliability, security and compliance without doing most of the work in any of them. Service teams set and defend their SLOs. A head of security runs the security function. A compliance lead runs the audit. Your job sits above all three, and it has three parts: making sure every risk the company carries has a named owner who accepted it, making the trade behind each one explicit, and building enforcement that holds when the deadline is tomorrow and the most senior person in the room wants an exception.
This chapter does not re-teach the mechanics. SLIs, targets and error-budget arithmetic are in SLIs, SLOs and error budgets; alerting on budget burn is in burn-rate alerts; running the incident is in incident response and postmortems. The risk register and the board’s appetite are in security risk management and the board; how a security function is built and who it reports to is in building a security function; controls, evidence and auditors are in compliance and audits. Read those for how. This chapter is the executive’s view: who signs, what gets traded, and how it is enforced.
One shape for three risks
Reliability, security and compliance look like three disciplines with three vocabularies. At your level they are one problem. Each asks the company to accept some failure in exchange for speed or money. An error budget is accepted unreliability. A security exception is accepted exposure. A compliance scope is an accepted boundary on what you promise an auditor or a regulator. Each needs the same four parts:
- A stated level. An SLO, a risk appetite, a control objective, an impact tolerance.
- A named person who accepted it on the company’s behalf, in writing.
- A consequence decided in advance for when the level is crossed.
- Enforcement that does not depend on anyone’s nerve in the moment.
The Google SRE book makes the case for the first of these in its introduction. “The structural conflict is between pace of innovation and product stability,” it says, and “the use of an error budget resolves the structural conflict of incentives between development and SRE.” It is equally direct about the level: “100% is the wrong reliability target for basically everything,” and “the business or the product must establish the system’s availability target.” Read that last sentence as an executive. The SRE book does not let engineering set the target alone. The side that gets the benefit of shipping signs for the cost of failing, and engineering’s contribution is to say what each extra nine costs. Chapter 3 of the same book puts that cost bluntly: “an incremental improvement in reliability may cost 100x more than the previous increment.”
What goes wrong without the four parts is familiar. The SLO is a number engineering chose, so product treats it as engineering’s preference. The security team accepts risks informally because nobody else will, so it becomes the department of no and then the department of blame. The compliance obligations live in a spreadsheet the auditor sees once a year. Then an incident arrives and the decision about what is acceptable is made by whoever is loudest on the call.
Who signs
The rule is short: the person who benefits from carrying a risk signs for it, and the specialist states it. Security writes down what could happen and how likely it is; the owner of the product decides whether the business carries it. SRE or the service team says what a target costs; product and engineering agree it together.
| Decision | Proposed by | Signed by | Enforced by | Disputes go to |
|---|---|---|---|---|
| SLO for a tier-1 user journey | the service team and its PM | head of engineering and head of product | the error budget policy | CEO |
| Error budget policy | head of engineering | head of engineering and head of product | release tooling and the weekly ops review | CEO |
| Security risk acceptance, high or critical | security, with the service owner | the executive who owns the product or system | the exception register, with expiry dates | CEO; the board if outside appetite |
| Risk appetite | head of security with the CFO | the board | quarterly reporting against the register | the board |
| Engineering controls for an audit | compliance or security | head of engineering, as control owner | evidence produced by the pipelines | the audit committee |
| ICT risk framework at an EU financial entity | head of engineering, security and compliance | the management body, under the EU DORA regulation | internal audit and the regulator | the regulator |
Two rows deserve a note. The SRE Workbook’s published example policy sends disputes “to the CTO to make a decision.” At many companies that is you, which is a problem when the dispute is between you and the head of product: you cannot be both the advocate and the judge. Name the CEO as the tiebreaker for disputes between engineering and product, and keep the CTO or head of engineering as the tiebreaker for disputes inside engineering.
The last row is where regulation has moved the signature upwards. The EU’s Digital Operational Resilience Act, applying to financial entities since 17 January 2025, says in Article 5(2) that the management body “shall define, approve, oversee and be responsible for the implementation of all arrangements related to the ICT risk management framework” and “bear the ultimate responsibility for managing the financial entity’s ICT risk.” In the UK, the FCA’s operational resilience rules, in policy statement PS21/3, require firms to identify their important business services, “set impact tolerances for the maximum tolerable disruption”, and be able to “remain within impact tolerances for each important business service” by 31 March 2025. An impact tolerance is a reliability target the regulator makes you set and can check. It is a maximum duration of disruption rather than a ratio, so test your SLOs against it: a 99.95% SLO over 28 days allows about 20 minutes of total outage, which sits comfortably inside a four-hour tolerance; a 99% SLO allows nearly seven hours, which does not.
What gets traded
Every one of these policies is a trade, and the document should say what each side gives and gets. If it only lists what engineering may refuse, product will treat it as a veto and fight it.
| Trade | The company gets | It gives up | Who decides |
|---|---|---|---|
| Reliability against change | releases continue while budget remains | releases to a service stop when its budget is gone | head of product and head of engineering, in advance |
| Reliability against money | a target users will not notice falling short of | redundancy, a second provider, on-call load for each further nine | head of engineering, with the CFO for large spend |
| Security against reliability | fewer paths for an attacker; a smaller group in a security incident | some redundancy, some speed of emergency access | head of engineering and head of security |
| Compliance against speed | an audit opinion, a licence, a customer contract | a change process that can be audited | head of engineering and compliance, with the auditor |
Reliability against change is the error budget. The SRE book’s chapter on embracing risk describes the bargain: while the budget lasts, releases ship; when SLO violations exhaust it, “releases are temporarily halted while additional resources are invested in system testing and development.” The trade runs the other way too. A team that never spends its budget is shipping too slowly or over-building, and the same chapter notes that teams “may elect to loosen the SLO (thus increasing the error budget) in order to increase innovation.” Let product make that argument when users would not notice the difference.
Security against reliability is less obvious and causes worse incidents. Google’s Building Secure and Reliable Systems opens with it: “While redundancy increases reliability, it also increases the attack surface.” Reliability engineering tends to make systems fail open; security wants them to fail closed. A reliability incident benefits from many people on the call; a security incident needs a small group on a need-to-know basis, so the attacker is not tipped off. These are executive calls because they have to be made before the incident. Which systems fail closed when the authorisation service is down? Who can use break-glass access to production, and who reviews every use? Write the answers into the policy.
Compliance against speed is mostly a trade you can refuse. Auditors want evidence that changes are reviewed and authorised; the instinct is a change advisory board. DORA’s research (the DevOps Research and Assessment programme, not the EU regulation) found “no evidence” that “a more formal, external review process was associated with lower change fail rates”, and found that heavyweight approval hurts delivery performance. It recommends peer review recorded in the delivery platform, which also satisfies segregation of duties: someone other than the author approves the change. Your job is to agree that control with compliance and the auditor before the audit, so the evidence falls out of the pipeline. Compliance and audits covers the mapping.
Enforcement: decide before the argument
Policies fail at the same moment every time. The budget is gone, a launch is due, and the person asking for an exception is the most senior person in the room. Whatever happens then becomes the real policy. If the first exception is granted on a phone call, every later freeze will be negotiated on a phone call.
Enforcement comes in three strengths:
| Strength | Mechanism | Fails when |
|---|---|---|
| Reported | budget status on a dashboard, read in the weekly ops review | red is read out and nothing changes |
| Gated by approval | once the budget is gone, a release to that service needs the signatures the policy names | approvers are under the same deadline as the requester |
| Gated by tooling | the deploy pipeline reads the remaining budget and refuses changes not labelled as exempt | the exempt labels are used for features |
Most companies should run the second with the check automated: the pipeline reads the budget from the same recorded series the dashboards use and stops a non-exempt deploy, and a named human can approve an exception that is logged. The burn-rate alerts chapter produces the numbers the gate needs.
Five rules make enforcement hold:
- Scope the freeze. Freeze the service that spent the budget, not all of engineering, unless the cause is shared, such as the deploy pipeline or a platform every team uses.
- Write the exemptions. The Workbook’s example halts “all changes and releases other than P0 issues or security fixes.” Copy that list. Anything else is an exception.
- Decide in advance what counts. The SRE book says outages outside a team’s control “also eat into the error budget”; the Workbook’s example lets a team keep shipping when the outage came from “a company-wide networking problem” or from another team’s service that has frozen its own releases. Both are defensible. Choosing after the outage, in the direction that suits whoever is asking, is not.
- Record every exception. Who granted it, for what change, for how long, and why. Count them each quarter. If every freeze ends in an exception, either the SLO is wrong or the policy is, and the fix is to change the document, not to keep overriding it.
- Say what the policy is not. The Workbook’s example states that it “is not intended to serve as a punishment for missing SLOs.” Put that sentence in yours. A freeze is the team being given time to fix the service, and it should feel that way.
Security exceptions need the same treatment. Each one has a signer, a compensating control and an expiry date. When it expires, it escalates one level, to the signer’s manager, rather than lapsing silently into permanence. Vulnerability management covers the remediation deadlines these exceptions sit against.
Where practitioners disagree
Hard freeze or reallocated capacity. The SRE Workbook’s example halts releases. Many companies find a hard halt blunt: the team sits on finished work, and the release that follows the freeze is larger and riskier. The alternative is a capacity rule, for example that a service out of budget spends its next sprint, or half its capacity until recovery, on reliability work. The capacity rule is gentler and easier to get signed. It is also easier to quietly ignore. If you choose it, measure it: the work has to show up in the planning tool.
One policy or three. A single risk and SLO policy puts the trades side by side, gets one set of signatures and one review. The objection is that some obligations are not tradeable. A regulatory requirement is not an error budget, and product should not be able to spend it. The working answer is one document with floors marked as floors: the SLOs and budgets are negotiable each quarter, the regulatory and contractual obligations are listed with their owners and are not.
Target from history or from users. The observability course sets the first target from what the service measured, so it is achievable today. The SRE book’s chapter on SLOs warns against adopting current performance “without reflection”, because it may lock you into supporting a system “that requires heroic efforts to meet its targets.” Both are right about different failures. The executive check is that a target is neither a wish (well above history, with no funded plan to get there) nor a mirror (today’s number, with nobody asking whether users need it).
Who runs it. Some companies keep a central SRE team that can hand a service back to its developers if it overspends; others run “you build it, you run it” with no SRE team at all. That choice is covered in the SRE track’s chapter on building an SRE or platform org. It changes who does the work, not who signs.
Day to day
Weekly: operations review, 45 minutes. You chair or attend it with the engineering managers of tier-1 services, the head of security and whoever runs the platform. The agenda is fixed: budget status for each tier-1 journey, incidents since last week and the state of their postmortem actions, security exceptions expiring in the next 30 days, and any compliance evidence that failed to collect. You are looking for three things: a budget falling faster than its team is reacting, postmortem actions that have slipped twice, and exceptions about to lapse without a decision. You read every sev-1 and sev-2 postmortem before this meeting.
Monthly: risk review with your peers, one hour. The head of product, the head of security, the compliance lead and the CFO’s delegate. New risk acceptances are signed here, not in the corridor. Exceptions granted since last month are read out. This is also where you tell product, early, that a service is trending towards its budget, so the freeze is not a surprise.
Quarterly: policy review and re-signature. Compare each SLO with what users complained about: if support tickets spiked while the SLO was green, the SLI is measuring the wrong thing. Count the exceptions. Adjust targets, then you and the head of product sign the new version. The quarterly summary goes to the CEO and feeds the board pack, which the CEO, the board and your peers covers.
Annually. The audit cycle (a SOC 2 Type II observation period, an ISO 27001 surveillance audit, a regulatory self-assessment), a disaster-recovery test you attend, and the board’s review of risk appetite. Diary them in January.
During an incident. You are not the incident commander; the incident process names one, and your presence on the bridge can slow it down. Your jobs are the ones only you can do: keep the CEO informed, take the decisions the policy reserves for executives (failing closed, taking a product offline, invoking a supplier’s contract), and protect the responders from interruptions. Public statements and regulator notifications are covered in crises and hard calls.
As a rule of thumb, this costs a head of engineering two to three hours in a normal week, more in the weeks around an audit or a serious incident. If it costs much less, you are not reading the postmortems.
There is no SRE team, probably no security hire, and the founders are the signatories. Write one page anyway: one SLO on the path that takes money, measured at the edge; a two-line budget rule; a list of security risks you have knowingly accepted and who decided. The first enterprise customer will send a security questionnaire and ask for SOC 2, and that is usually when compliance arrives. Treat it as the moment to agree a change control based on pull-request review, before someone proposes a weekly approval meeting for six engineers.
This is where the policy gets written for real, usually after the second serious incident in a quarter. You hire or inherit a head of security and a compliance lead, start a SOC 2 Type II period, and perhaps acquire a licence and a regulator. The hard part is the first freeze: the first time the policy says no to a launch the CEO wants. Get the head of product’s signature before that day, and make sure the CEO has read the escalation clause. The exception log you start now is the evidence later that the policy is real.
The policies exist, several times over: an SRE standard, a security exception process, a risk committee, a regulatory framework owned by a second line of defence. Your problem is that they disagree, and that each org has learned which one to invoke to get its way. The work is consolidation and consistency: one tier-1 list, one exception register, one quarterly view your peers and the risk committee read. Expect internal audit to test the policy itself, and expect exception inflation; publish the count by org.
Template
# Risk and SLO policy: <company>
Version · Effective <date> · Next review <date, at most a quarter away>
Signed: head of engineering · head of product · (head of security, compliance lead)
Tiebreaker for disputes between signatories: <usually the CEO>
## 1. Purpose and what this is not
<Two sentences on the trade. One sentence: this policy is not a punishment.>
## 2. Tier-1 journeys and SLOs
| Journey | SLI | SLO | Window | Measured, last 90 days | Hard dependency and its SLA | Eng owner | Product owner |
|---|---|---|---|---|---|---|---|
## 3. Error budget consequences
| Budget spent (rolling window) | What happens automatically | Who is told |
|---|---|---|
| 50% | | |
| 100% | releases to this service stop except P0 and security fixes | |
| one incident > 20% | | |
Freeze lifts when: <condition>
## 4. What counts against the budget
- Third-party outages: <count | do not count, and why>
- Another team's service: <rule>
- Planned maintenance: <rule>
## 5. Security risk acceptance
| Severity | Who states the risk | Who signs | Maximum duration | On expiry |
|---|---|---|---|---|
## 6. Obligations that are floors, not budgets
| Obligation (framework, regulation, contract) | What it requires of engineering | Control owner | Evidence source | Tolerance or deadline |
|---|---|---|---|---|
## 7. Exceptions
Who can grant: <names or roles> · Maximum length: <days> · Recorded in: <link>
Exceptions are counted and reported every quarter.
## 8. Cadence
Weekly ops review · monthly risk review · quarterly policy review and re-signature WORKED EXAMPLE
Quarry is a fictional UK e-money institution that holds and pays out sellers’ balances for online marketplaces: 480 people, 170 engineers in twenty product teams and a platform team of fourteen that includes six SREs. It is an e-money institution, so the FCA’s operational resilience rules apply. The VP Engineering drafted this with the chief product officer; extracts follow.
Signed by the VP Engineering and the CPO, with the head of security and the head of compliance for sections 5 and 6. The CEO breaks ties. Next review: end of the quarter.
Tier-1 SLOs. Payout submission API: 99.95% of valid requests succeed, rolling 28 days; measured 99.97% over 90 days; the banking partner’s SLA is 99.99%. About 1.4 million submissions in 28 days, so the budget is about 700 failed submissions. Settlement: 99.9% of payouts settle before the scheme cut-off. Merchant dashboard: 99.5%.
Consequences. At 50% spent, the owning team’s next sprint plan must include the top reliability item from its backlog. At 100%, the pipeline blocks releases to that service except changes labelled P0 or security; the freeze lifts when the rolling window is back under 100%. Any incident over 20% of the budget, about 140 failures for payouts, gets a postmortem with at least one P0 action.
What counts. Banking-partner outages count: users do not care whose fault it was, and counting them is what funded the second partner integration. Planned maintenance announced seven days ahead does not count.
Security acceptance. Critical: signed by the CPO and VP Engineering, 30 days maximum. High: the product director for the area, 90 days. On expiry, the exception escalates to the signer’s manager.
Floors. Payouts impact tolerance is four hours of disruption, set with compliance. A full outage that spent the whole 28-day budget would last about 20 minutes, well inside it. Change control for SOC 2: every production change has an approving reviewer other than the author, recorded in the code host; no change advisory board. Owner: VP Engineering.
Exceptions last at most 14 days, are logged in the decision log, and are counted in the quarterly review. Last quarter: one, for a security fix that the labelling missed.
Now you
You are Head of Engineering at Rowan, a fictional UK business-banking company with 140 people and 52 engineers in seven teams, with five engineers on the platform team. There is no SRE team. Cards run through an issuer processor whose contract promises 99.95% availability. It is March. Card authorisation measured 99.96% over the last 90 days; faster-payments outbound, 99.8%; app login, 99.97%. There were two sev-1 incidents last quarter, both after releases. The CPO agrees to a policy but wants card authorisation at 99.99% “because it is the product”. The head of security has 14 open risk exceptions, five past their review date, and every one was signed by security. The SOC 2 Type II observation period starts in six weeks and the auditor will test change management. Write the policy you and the CPO will sign. It must answer the 99.99% request with numbers, decide whether processor outages count, fix who signs the 14 exceptions, and choose a change control the auditor will accept.
Self-check
You are Head of Engineering at Rowan, the 140-person business-banking company. In March you and the CPO signed a policy: card authorisation SLO 99.95% over a rolling 28 days (2.4 million authorisations, so about 1,200 failures of budget); when the budget is exhausted, releases to the card service stop except P0 and security fixes; disputes go to the CEO. The policy does not say whether third-party outages count. In the last 28 days: a config release cost 640 failures 18 days ago, an issuer-processor outage 820 failures 9 days ago, a schema migration 390 failures 4 days ago. That is 154% of budget, or 86% without the processor. Spend controls for an accounting-software partner, which change the authorisation path, are due to launch in 12 days. There is no penalty clause, but the partner has booked its marketing. The CPO asks the CEO to lift the freeze; the CEO asks for your recommendation.
- BOOK Site Reliability Engineering, chapter 1: Introduction Benjamin Treynor Sloss, 2016
The original statement that the conflict between change and stability is structural, that the error budget resolves it, and that the availability target is a product decision. Ten pages; read it before you draft the policy. Read: Chapter 1, especially 'Pursuing maximum change velocity without violating a service's SLO'.
- BOOK Site Reliability Engineering, chapter 3: Embracing Risk Marc Alvidrez; error-budget section by Mark Roth, 2016
How to price each nine, why outages outside your control still spend the budget, and how loosening an SLO can buy innovation. The executive's chapter of the book. Read: Chapter 3, especially 'Motivation for error budgets'.
- BOOK Site Reliability Engineering, chapter 4: Service Level Objectives Jones, Wilkes and Murphy, with Smith, 2016
The counterweight to setting targets from history: do not adopt today's numbers without asking whether users need them, and keep an internal margin. Read: Chapter 4, the section 'Choosing targets'.
- DOC Example Error Budget Policy Steven Thurgood, 2018
A complete, signed policy with goals, non-goals, the freeze rule, the 20% postmortem rule, exemptions for other teams' outages and an escalation path. Start your draft from its structure.
- BOOK Building Secure and Reliable Systems, chapter 1: The Intersection of Security and Reliability Adkins, Beyer, Blankinship, Lewandowski, Oprea and Stubblefield, 2020
Where security and reliability pull against each other: redundancy and attack surface, fail open and fail closed, open and need-to-know incident response. Read it before you write the break-glass section. Read: Chapter 1.
- DOC Capabilities: Streamlining change approval DORA
The research finding that formal external approval does not lower change failure rates, and how peer review meets segregation of duties. Take it to the meeting with your auditor.
- DOC PS21/3: Building operational resilience Financial Conduct Authority, 2021
The UK regulator's rules on important business services and impact tolerances. Read it to see a reliability target written by a regulator, and check your SLOs against it if you are in scope.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.