Engineering strategy and planning
An engineering strategy is a diagnosis of what makes engineering slow, fragile or expensive, the policies every team will follow because of it, and the actions that enforce them. The annual plan turns it into money, people and quarters
The CEO asks you, the new head of engineering, for 'the engineering strategy' by the end of the month. Which first draft will do the most work for your teams?
At Foundations level you ran a few teams through their managers and your horizon was two quarters. As Head of Engineering or VP Engineering you own all of it: strategy, hiring, budget and delivery, over a horizon of a year, judged by the CEO on delivery, retention and spend. Two documents carry that job. The engineering strategy says what engineering will and will not do, and why. The annual plan says how many people, how much money, and which outcomes in which half. This chapter is about writing both, and about the meeting where they collide with what everyone else wants.
You met the kernel of a strategy, Rumelt’s diagnosis, guiding policy and coherent actions, in Product strategy. This chapter does not teach it again. It applies it to engineering, where the challenges are capacity, reliability, cost and the speed of change, and where most of the hard choices are about which engineers work on what.
Four documents that get confused
| Document | Horizon | Question it answers | Who writes it |
|---|---|---|---|
| Engineering vision | Two to three years | Where should the systems and the organisation be? | Head of engineering with senior engineers |
| Engineering strategy | About a year, revised quarterly | What is making engineering slow, fragile or expensive now, and what will every team do and stop doing about it? | Head of engineering |
| Annual plan | The financial year | How many people, how much spend, what allocation, which outcomes per half? | Head of engineering with finance and product |
| Roadmap | A quarter or a half | Which work, scoped with product and design, in what order? | Engineering and product leads together |
The horizons are rules of thumb. What matters is the direction: the strategy constrains the plan, the plan constrains the roadmap. Larson’s observation, in the essay this chapter leans on, is that many documents written as strategies are “actually visions of how things could ideally work”. A vision is worth having. It cannot tell a team lead whether to take the shortcut this sprint.
The kernel, applied to engineering
The diagnosis in an engineering strategy is usually about one of four things: capacity (too much of the team’s time goes to work nobody planned), coupling (one system or one team sits in the path of everything), reliability (incidents are eating the roadmap), or cost (cloud and vendor spend grows faster than revenue). The evidence is engineering evidence: the share of tickets tagged unplanned over two quarters, the incident log, deploy frequency and lead time (the measures are the subject of delivery metrics and reporting; Quality metrics covers the DORA metrics), the queue time on reviews owned by one team, the developer survey, and the design documents written over the last year. A diagnosis reads like “eight of eleven teams write directly to the ledger tables, so every change waits a median of three weeks for the one team that can review it, and next year’s lending product needs forty such changes.” It can be wrong. That is why it is useful.
Guiding policies. Larson suggests a policy section answers three questions: how resources are allocated and why, what fundamental rules every team must follow and why, and how decisions are made. He then tests each policy for altitude. It must be applicable, usable when someone faces a real trade-off. It must be enforced: in his words, “Guiding policies will only actually guide an organization if they’re enforced.” And it must create leverage, compounding or multiplicative impact. “Teams write to the ledger only through its published API” passes all three. “We value clean interfaces” passes none. Larson also notes that a policy which implies no trade-off is suspicious; if nobody would argue for the opposite, it is a slogan.
Coherent actions. In engineering these come in three kinds, again from Larson: enforcements (the database permission is revoked on 1 October), escalations (who you go to when a team believes the policy is wrong for them, and how fast they get an answer), and transitions (the migrations and reorgs that move the organisation from the old state to the one the policies describe). If your strategy has no enforcement and no transition, it is a request.
Where strategy comes from. Larson’s earlier advice, aimed at staff engineers, is “To write an engineering strategy, write five design documents, and pull the similarities out.” It works from the bottom up: the decisions your teams keep making independently become the policy. As an executive you can also write it top down, because you can enforce it, and his later essay recommends a direct process: write it yourself, test the diagnosis one-to-one with a small working group, ask executives outside the company for private feedback, seek out the people most likely to disagree, share it for a week of comments, then review its effect two months later. Most good strategies use both. The bottom-up read tells you what is already true; the executive draft decides the conflicts the teams could not.
When the company strategy is missing. It often is, or it is a list of goals. Larson’s advice is not to block on it: write a private sketch of the business and product strategy your engineering strategy assumes, and check it with the executives who own them. If the head of product reads your sketch and says “that is not what we are doing”, you have found the most important conversation of the planning cycle early.
Run, grow, transform
Every engineering organisation’s capacity is pulled in three directions. Gartner’s taxonomy for IT spending names them run (keep existing systems working: incidents, upgrades, security patches, compliance, the vendor that is retiring an API), grow (extend what the business already does: features, new markets, new customers on existing products) and transform (change what the business or the engineering organisation can do: a new platform, a rebuild of the core, a new architecture). Engineering teams call much of the first bucket KTLO, keep the lights on.
| Bucket | Who asks for it | What it looks like in a plan | What happens when you starve it |
|---|---|---|---|
| Run | Nobody, until it breaks; then everybody | Incident follow-ups, upgrades, deadlines set by vendors and regulators | Unplanned work grows until it eats the roadmap |
| Grow | Product, sales, the CEO | Roadmap outcomes, launches, customer commitments | The company stops growing and the plan loses its sponsor |
| Transform | Senior engineers, sometimes the CTO | Platform work, migrations, rebuilds | Every grow item costs a little more each year |
Larson’s planning chapter frames the same tension as functional priorities, the work engineering owns, against cross-functional priorities, what other functions ask for, and recommends you set it as a functional portfolio allocation: percentages of engineering capacity per month for the year. Three of his points make the allocation work.
- Prefer stability. “You should prefer continuity and narrow changes over continually pursuing a theoretically ideal allocation.” An allocation that moves every quarter turns teams into competitors.
- Allocate at a coarse grain. Allocate to large groups, such as all of infrastructure, so their leaders can shift people inside them. Allocating to small teams means every internal change comes back to you.
- Move functional work into the open. Over time, put work such as security, compliance and reliability into the cross-functional plan, where the rest of the company can see and weigh it.
There is no correct ratio. You will see splits like 70/20/10 quoted, but the benchmark figures vary by source, and Gartner itself has published research arguing that the run-grow-transform taxonomy can hide strategic purpose. Treat any ratio you are given as a rule of thumb from someone else’s company. Your ratio comes from your diagnosis: a team losing 38% of its time to unplanned work cannot be allocated 10% to run by decree.
The annual plan
Larson splits planning into three components and recommends doing them in order, holding the other two still while you work on each: “Fewer dependencies lead to a simpler, more focused process.”
- The annual financial plan. Revenue and expense targets by function. Engineering’s part is its expenses, which he suggests you break into headcount, production operating costs and development costs, by business line. “Your company’s financial plan is the foundational constraint for every function.” Treat the budget as fixed during the year. The detail of building and defending it is the subject of headcount, budget and cost.
- The functional portfolio allocation. The run, grow, transform percentages above, owned by engineering leadership and checked with peer executives. Larson’s view is that non-engineering executives should not be deeply involved in setting it, though they should be able to see it.
- The roadmap. A quarter or a half, agreed with product, design and the go-to-market leads. Agree outcomes with high confidence and projects with lower confidence, because “if you get too specific, you can accidentally disempower the team responsible for the actual work.” Reserve a set share for unscoped work and do not rank it against scoped work.
Headcount is not capacity. Check the hiring plan against what your recruiting has achieved: if you hired fourteen engineers last year with the same recruiters, a plan that needs thirty is a plan that will not be met. Count backfills as well as growth: at 10% attrition, a rule of thumb, an 80-person team needs about eight hires a year to stand still, and Larson’s advice is not to spend long arguing over hires that will not happen. Then account for timing. A hire approved in January who starts in May and takes another quarter before they can work unsupervised on the core systems adds very little to the first half. As a rule of thumb, count hires at half capacity in the quarter they start, and do not count them at all for work only your most experienced engineers can do.
Rough org maths belongs in the plan. Larson’s planning chapter gives a sketch: teams of about eight, grouped into clusters of four to six teams, then grouped again until each leader has five to seven direct reports. You need this at plan time only to check that the headcount implies a sensible number of managers. The design itself is the subject of org design at 50, 150 and 500.
The elevator
Gregor Hohpe’s The Software Architect Elevator describes the architect’s job as riding between the penthouse, where business strategy is set, and the engine room, where systems are built. The head of engineering rides the same elevator. A strategy written only in penthouse language (“we will be a platform company”) gives the engine room nothing to apply. A plan written only in engine-room language (“migrate the ledger to event sourcing”) gives the CFO nothing to weigh.
Hohpe’s essay “Architecture: Selling Options” gives you the translation for transform work. Good architecture buys the right, not the obligation, to make a decision later at a known cost, and, borrowing from option pricing, “the value of the options that architecture sells increases” as uncertainty rises. That is how you argue for transform spend with finance: not “the code is messy” but “this lets us add a new market in three weeks rather than three months, and we do not yet know which markets we will need.”
Where planning goes wrong
Planning as a ritual. The documents are produced, approved and not opened again until next year. Larson names this failure, along with executives who argue about the format of the plan rather than the decisions in it. The test is whether a team lead could find the policy that applies to their current dilemma.
Headcount as the default fix. Every shortfall becomes a hiring request; the least efficient teams, or the ones who pad their estimates, get the most people. Larson observes that only the CEO can hold peer executives to their budgets. Your job is to hold your own managers to theirs.
The shiny project wins. Planning anchors on whatever is most exciting, a launch or a new product, while compliance, upgrades and the vendor deadline get what is left. The run bucket then claims its share anyway, unplanned, in the middle of the year.
Peanut butter. Every request gets a slice of every team, so nothing gets enough people to finish. Three projects at a third each usually finish later than the same three in sequence, because the people who know the core are context-switching between them.
Diminishing ownership. Executives plan specific projects in detail, or arrive mid-cycle with large unscoped ones, and the teams stop owning how outcomes are reached.
A strategy nobody enforces. The policy says the ledger is accessed only through its API. A launch is late, someone grants a direct-write exception, and nobody records it. By the next planning cycle the policy is folklore. Exceptions are allowed; unrecorded ones are how a strategy dies.
Where practitioners disagree
Top down or bottom up. Larson argues that strategy can only be applied from the top, so the real question is whether to have one; others hold that strategies written by executives get ignored unless the senior engineers wrote them. In practice you need the senior engineers to draft the diagnosis and you need your authority to enforce the policies.
Fixed allocations or item by item. A fixed percentage for run and transform protects them from the roadmap. Critics say it becomes a tax nobody has to justify. If you use percentages, review what each bucket produced, and spot-check large allocations that are not producing much, as Larson suggests.
Annual or rolling. Some companies have abandoned annual plans for rolling quarterly ones. Larson’s compromise is to fix the budget annually and roll the allocation and roadmap. Finance will usually want the annual number whatever engineering prefers.
Day to day
Annual cycle, eight to twelve weeks before the financial year (rule of thumb). Weeks one to three: gather evidence (unplanned-work share, incident trends, deploy data, the developer survey, the last year’s design docs) and write the diagnosis. Test it one-to-one with your directors, two or three staff engineers, and the head of product. Weeks three to six: the financial plan with your finance partner, two or three working sessions, ending in a headcount and spend number the CFO accepts. Weeks six to nine: the allocation with your directors, then the first half’s roadmap with product and design. Weeks nine to twelve: publish the strategy to engineering, take a week of comments, hold a forty-five-minute all-hands on it, and answer the questions in writing.
Quarterly, two or three days. Review the allocation against what each bucket produced. Re-plan the next quarter’s roadmap. Check the strategy’s enforcements happened and record the exceptions granted. Larson suggests reviewing a new strategy’s impact about two months after it lands; the first quarterly review is a natural place.
Monthly. A business review with finance on headcount against plan, hiring against recruiting capacity, and cloud spend. A review with your directors of unplanned work and incidents, because a rising run share is the earliest sign the plan is wrong.
Weekly. Your leadership team meeting, where the escalations the strategy routes to you arrive. One or two design or architecture reviews, where you check new decisions against the policies. Your one-to-one with the CEO, where a new commitment to a customer or the board is first mentioned, which is the moment to say what it displaces.
The meeting that matters most is the one where the CEO and the head of product first see the allocation. If run and transform are a surprise there, they will be negotiated away. Walk each of them through it one-to-one beforehand.
There is rarely a head of engineering yet; a founding CTO or the most senior engineer holds the strategy in their head. Write it down anyway, on one page: what is slowing the team, two or three rules (one language, one cloud, deploy daily), and what you will not build. The annual plan is the runway: how many engineers the money pays for and how many months it lasts. Run work is small but deadly, because one person knows each system. Allocation is a conversation every two weeks, not a percentage.
This is where the first real engineering strategy gets written, usually by the first VP or Head of Engineering in their first two quarters. Unplanned work is growing, a few systems have become everyone’s bottleneck, and the CEO is making commitments that assume engineers who have not been hired. The annual plan with finance happens for the first time in earnest. Your job is to make run and transform visible as allocations before they are spent invisibly, and to tie the hiring plan to what recruiting has delivered.
Strategy exists in layers: the CTO’s technology strategy, each division’s engineering strategy, and yours inside one of them. Planning is a calendar with gates owned by finance and a portfolio office, and spend is often reported in run, grow and transform buckets whether or not engineering chose them. The hard part is political: a policy that rules something out rules out another VP’s plan. Write the short version for your teams and keep it consistent with the official one, because teams follow the version they can remember.
Template
# Engineering strategy and plan, FY<year>
Author · Date · Status: draft | in review | published
Reviewed with: <CEO, head of product, CFO, directors, staff engineers>
## Part 1. Strategy
### Diagnosis
<Three to six sentences. The critical challenge, with numbers and their sources.
Why it matters this year. What you are not sure of.>
### Guiding policies
1. Allocation: <how capacity is split and why>
2. Rule: <what every team must do or stop doing> — trade-off accepted: <...> — rules out: <...>
3. Decisions: <how cross-team technical decisions are made, and by whom>
Enforcement: <how each policy is checked>
Escalation: <who a team goes to, and how fast they get an answer>
### Coherent actions
| Action | Kind (enforcement / escalation / transition) | Owner | Done by |
|---|---|---|---|
## Part 2. Annual plan
### Financial plan
| | Start of year | End of year | Notes |
|---|---|---|---|
| Engineers (incl. managers) | | | Hired last year: <n> |
| Production operating cost | | | |
| Development and tooling cost | | | |
### Allocation (% of engineering capacity)
| Quarter | Run | Grow | Transform | Why it changes |
|---|---|---|---|---|
### Outcomes by half
| Half | Outcome | Measure | Teams |
|---|---|---|---|
### Not doing this year
- <thing> — <why not; who asked; where it goes instead>
### Assumptions and review
| Assumption | Evidence we will watch | If wrong, we will |
|---|---|---|
Review dates: <quarterly; strategy impact review two months after publishing> WORKED EXAMPLE
Granite is a fictional business-banking platform for small companies in the UK and Ireland: accounts, cards and invoicing, about £38M revenue, 260 people. Engineering is 84 people, 75 engineers and 9 managers, in 11 teams: seven product teams, Ledger, Platform, Data and SRE.
Diagnosis. Over the last two quarters 38% of product-team capacity went on unplanned work (ticket tags, reviewed by each manager), mostly reconciliation breaks and manual fixes to ledger entries. Eight of eleven teams write directly to the ledger tables, so every change waits for the Ledger team’s review: median three weeks (review tool data). Deploys have fallen from daily in 2023 to weekly. Next year’s company goal, credit lines for existing customers, needs about forty ledger changes; at today’s queue the lending launch slips into the following year. We are less sure how much of the unplanned work the ledger causes; our estimate is about half.
Guiding policies. (1) The ledger becomes a product with a published API; teams stop writing to its tables. Trade-off: two quarters of migration work before product teams speed up. Rules out: new direct writes from 1 April. (2) Allocation is set per quarter at org level and held; directors move people within it. (3) Changes touching money movement need an architecture decision record reviewed at the fortnightly architecture forum. Escalation: the Ledger lead, then the VP, answer within five working days.
Actions. Ledger API v1 by end of Q2 (transition). Database write access for non-Ledger services revoked on 1 October (enforcement). Lending team formed in Q2 from four transfers and three hires (transition).
Financial plan. 84 to 96 in engineering (+12). With about 8 backfills at 10% attrition (a rule of thumb, close to last year’s 9 leavers), that is about 20 hires against the 14 we made last year with one recruiter, so the plan funds a second recruiter from Q1 and treats the last four roles as conditional on Q2 hiring. New hires counted at half capacity in their first quarter.
Allocation. Q1: run 35, grow 45, transform 20; run starts near today’s measured share, and transform is the ledger API and migration. Q2: 30 / 50 / 20. Q3: 25 / 55 / 20. Q4: 25 / 60 / 15. Run falls only as the migration removes unplanned work, and grow rises as lending ramps.
Outcomes. H1: ledger API live; unplanned work below 30%. H2: lending in beta with 200 customers; deploys daily again.
Not doing. A rewrite of the mobile app (the mobile lead wants it; revisit next year). Moving to Kubernetes. A second cloud region.
Assumptions. Ledger causes about half of unplanned work: if it is still above 30% at the end of Q2, we re-diagnose before Q3 planning. Review: quarterly, plus a strategy review in early June.
Now you
You are the new VP Engineering at Hazel, a fictional messaging API company that sends SMS, WhatsApp and email notifications for fintechs and marketplaces: 150 people, £31M ARR growing 35% a year. Engineering is 48 people, 42 engineers and 6 managers, in seven teams: Messaging Core (9), API and SDKs (7), Dashboard (6), Growth (6), SRE (5), Billing (5) and Data (4). Finance has approved ten more engineering hires next year; last year you hired nine. Messaging Core spends about 30% of its time on unplanned work and had two sev-1 incidents last quarter. Three demands land on Core: the largest carrier partner retires the connection protocol Hazel uses on 30 September; the CEO has told the board the US launch, which needs a new carrier integration, ships in Q3; and a staff engineer proposes splitting the routing monolith into a routing service with one adapter per carrier. The head of product wants 70% of all engineering capacity on the roadmap. Write the strategy memo and the annual plan.
Self-check
You are VP Engineering at Hazel (48 in engineering, seven teams). Messaging Core's 9 engineers are the only people who understand carrier integration; after about 30% unplanned work they have roughly 6 engineers of plannable capacity, about 36 engineer-months a half. Three pieces of work need them. Run: the largest carrier retires the protocol Hazel uses on 30 September, about 4 engineers for 6 months. Grow: the US launch the CEO told the board would ship in Q3, about 5 engineers for 6 months. Transform: splitting the routing monolith into a routing service with per-carrier adapters, about 6 engineers for 9 months, after which a new carrier takes about 3 weeks instead of 3 months. You have 10 hires approved. How do you plan Core's year?
- POST Writing an engineering strategy Will Larson, 2023
The core text for this chapter: Rumelt's kernel applied to engineering, the three questions for guiding policies, the applicable, enforced and leverage tests, and a ten-step process for an executive writing one. Read it before your first draft.
- POST How to plan as an engineering executive Will Larson, 2023
The financial plan, functional allocation and roadmap as separate steps done in order, with the failure modes of planning named. The section on functional portfolio allocation is the model for your run, grow, transform percentages.
- POST Write five, then synthesize: good engineering strategy is boring Will Larson, 2020
The bottom-up route: pull a strategy out of five design documents, then a vision out of five strategies. Read it to see what your senior engineers can draft before you decide the conflicts.
- BOOK Good Strategy Bad Strategy: The Difference and Why It Matters Richard Rumelt, 2011
The source of the kernel that Larson's engineering strategy is built on. Rereading the hallmarks of bad strategy is the quickest test of a draft that feels comfortable. Read: Part I, on bad strategy and the kernel; you met it in the product strategy chapter, so reread it with an engineering diagnosis in mind.
- BOOK The Software Architect Elevator Gregor Hohpe, 2020
How to carry a technical decision up to the executive floor and a business strategy down to the teams without losing either. The elevator is the head of engineering's commute. Read: The opening chapters on riding the elevator between the penthouse and the engine room, then the part on transformation.
- POST Architecture: Selling Options Gregor Hohpe, 2016
The argument that architecture buys the right to defer decisions, and that the option is worth more as uncertainty rises. Use it to explain transform spend to a CFO in their own terms.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.