Delivery metrics and reporting
Report engineering to the company with numbers that do not lie: delivery against plan, reliability, people and cost on one page for the CEO, DORA and SPACE kept inside engineering where they help, and no metric that ranks individual engineers
You are writing the first monthly engineering report for your CEO, who has a sales background and reads it before the executive meeting. Which of these belongs at the top of the page?
Every head of engineering is asked to report on engineering. The request is fair. Engineering is usually the company’s largest cost line, its work is hard to see from outside, and the CEO, the CFO and the board all need to know whether the money is buying what was promised. The trouble starts when the request becomes a number. The easy numbers count activity, and activity is what people produce more of when you point a target at it. The useful numbers are slower, need context, and come in sets rather than singly.
This chapter is about the reporting you own at Head of Engineering and VP Engineering level: what to measure and for whom, how to use the DORA and SPACE research without misusing it, and how to write the monthly engineering report, the one document where the rest of the company sees engineering as a whole. The definitions of the DORA metrics, Goodhart’s law and the case against averaging recovery times are taught in the QA chapter on quality metrics that are not lies. Read it first; this chapter builds on it rather than repeating it.
The model: four reasons to measure, four audiences
Will Larson’s essay on measuring an engineering organisation, in the reading, sorts measurement by purpose, and the sort is the most useful thing you can carry into this job. You measure for four reasons.
| Purpose | The question | Example measures (Larson’s, adapted) | Main audience |
|---|---|---|---|
| Plan | Are we building what we said, and did it work? | Projects shipped per team against plan, and the impact of each | CEO, board, product |
| Operate | Is the software and the organisation healthy today? | Incidents, each linked to its review; user-facing downtime; latency; engineering cost normalised against a business metric | CEO, CFO, peers |
| Optimise | Where can engineering get better at engineering? | The DORA metrics; SPACE measures; a developer productivity survey | Engineering’s own leadership and teams |
| Inspire | What did engineering make possible? | Technical investments that turned something impossible into something routine | Everyone, occasionally |
The column that matters is the last one. Larson’s sharpest line is that ‘the biggest mistake to avoid is asking your CEO to measure engineering through your Metrics to optimize’. Optimisation metrics need engineering context to read. A CEO who sees change lead time rise cannot tell whether a team is struggling or has started doing a careful migration, so the CEO will ask, and the next meeting is about a number rather than the business. Planning and operating metrics speak the business’s language: what was promised, what landed, what broke, what it cost.
He lists the anti-patterns too, and two of them are the ones you will be tempted by. ‘Using optimization metrics to judge performance’: the DORA numbers become a score and teams start managing the score. And ‘Measuring individuals rather than teams’: individual data, he writes, ‘can be useful for diagnostic purposes, but it’s a poor tool for measuring performance.’ The third worth remembering is the first on his list: focusing on measurement when the bigger issue is a lack of trust. A CEO who asks for more numbers every month is often telling you that the numbers you give do not answer the question they have. More charts will not fix that. A different conversation will.
What you can and cannot measure
The honest starting point is that nobody can measure the productivity of software engineers. Martin Fowler made the argument in 2003 and it has not been overturned. Productivity is output over input, and the industry has no good measure of output. Lines of code reward duplication. Function points varied by a factor of three between counters on one system, in a report Fowler cites. His conclusion is that ‘any true measure of software development productivity must be based on delivered business value’, which is hard to measure and often arrives years later, and that ‘we have to admit to our ignorance.’
That does not mean you report nothing. It means you report the things you can observe and say what they are. Kent Beck and Gergely Orosz’s 2023 response to McKinsey gives you the vocabulary. Software work runs through a chain:
- Effort: planning, coding, reviewing, operating.
- Output: the features, code and documents that result.
- Outcome: the change in customer behaviour the output causes.
- Impact: the value that comes back to the business, in revenue, retention or referrals.
‘The earlier in the cycle you measure, the easier it is to measure’, they write, and the earlier you measure, the more ‘the act of measurement changes how developers work’. Commits and story points are effort. Features shipped are output. Conversion and retention are outcomes and impact. Their advice to engineering leaders is to ‘look to outcome and impact measurements’. The report you send upward should sit as far towards that end of the chain as your data allows, with output shown as the evidence that work is moving and effort kept off the page entirely.
DORA at the head-of-engineering level
Accelerate, by Nicole Forsgren, Jez Humble and Gene Kim (2018), gave the industry its best-evidenced delivery measures, and its most useful finding for you is an argument rather than a number. Across four years of survey data, the highest performers deployed more often with shorter lead times and also failed less and recovered faster. Throughput and stability were not a trade. When a peer argues that engineering must slow down to be safe, or that the CEO must accept more incidents to go faster, Accelerate is the evidence that both claims are usually wrong. Chapter 2 of the book is also a short catalogue of failed productivity measures, lines of code, velocity and utilisation among them, which is worth having read before someone proposes one of them to you.
DORA, the research programme behind the book, now publishes five software delivery metrics in two groups, throughput and instability. The quality metrics chapter defines each, explains why a mean or a median recovery time is unreliable as a trend with few incidents, and lists what each metric can be gamed by. What changes at your level is not the definitions but the use:
- Measure per service, compare over time. DORA’s own guide says the metrics ‘are meant to be applied at the application or service level’ and warns against ‘comparing metrics between vastly different applications’. A payments ledger and a marketing site should have different numbers. The question for each is whether it is improving, not where it sits in a table.
- Keep them in engineering’s own review. They are optimisation metrics. Look at them with each team’s engineering manager and tech lead, quarterly, alongside what the team says is slowing it down. They tell you where to invest in the pipeline, in tests or in architecture.
- Never make them targets. DORA lists ‘setting metrics as a goal’ as its first pitfall, and names Goodhart’s law in doing so. A deployment-frequency target produces smaller deploys, not better software.
- Upward, translate rather than forward. The CEO does not need change fail rate. The CEO needs to know that releases have become safe enough to ship the payouts product weekly instead of monthly, and that this is why the roadmap moved faster this quarter. The metric is your evidence; the sentence is the report.
SPACE: why one number cannot work
In 2021 Nicole Forsgren, Margaret-Anne Storey and four co-authors from GitHub, Microsoft Research and the University of Victoria published ‘The SPACE of Developer Productivity’ in ACM Queue. It opens with the claim this chapter rests on: ‘Developer productivity is about more than an individual’s activity levels.’ The paper names five dimensions:
| Dimension | What it covers | Example measure |
|---|---|---|
| Satisfaction and well-being | How fulfilled and healthy developers are; whether they have the tools they need | Survey: satisfaction, burnout |
| Performance | The outcome of the work: quality and impact | Change fail rate; customer adoption of what shipped |
| Activity | Counts of actions: commits, reviews, deploys | Deploys per service per week |
| Communication and collaboration | How information and work flow between people and teams | Review turnaround; onboarding time |
| Efficiency and flow | Doing work with few interruptions and handoffs | Uninterrupted time; waiting time in the pipeline |
It also lists the myths it was written against, and you will hear each in executive meetings: that productivity is all about developer activity; that it is only about individual performance; that one metric can capture it; that productivity measures are only useful to managers; and that it is only about engineering systems and tools.
The practical guidance, paraphrased: measure across several dimensions, at least three, so the measures pull against each other; include at least one perceptual measure, such as a developer survey, because people know things about their work that no system logs; and protect privacy by reporting aggregates at team level and above. The framework also gives example measures at three levels, individual, team and system, which is easy to misread. The individual measures are for an engineer understanding their own work, not for a dashboard their manager’s manager reads.
For you, SPACE is the answer to a request for one number. When someone proposes commits, pull requests or points per engineer, the reply is that they have chosen one dimension, activity, and the paper, whose lead author Nicole Forsgren also led the DORA research, says that is the dimension least able to stand alone.
Goodhart’s law, from the chair that sets the incentives
The quality metrics chapter tells the history: Charles Goodhart’s 1975 observation about monetary statistics, and Marilyn Strathern’s 1997 formulation, ‘when a measure becomes a target, it ceases to be a good measure’. At a quality lead’s level the law is something you defend against. At yours, it is something you can cause. The head of engineering decides which numbers appear in performance reviews, in team goals and in the board deck, so every distortion downstream starts with a choice you made or allowed.
Story points are the clearest case. Points are relative units a team invents to size its own work; the PM track’s working with engineering chapter puts their honest use, sprint planning for a stable team, beside their misuses, comparing teams and converting to days. Ron Jeffries, one of the Extreme Programming originators, has written on his own site that the team he worked with started by estimating in ‘ideal days’ and later called them points, and that if he invented them he is sorry now; most of that post is about how they get misused. Once points carry a target, three things happen in good faith: estimates drift upwards, because a cautious estimate is the rational response to being measured on the total; work that earns no points, reviewing, pairing, mentoring, incident response, gets done less or done quietly; and engineers on the hardest problems, whose points are fewest, look worst.
The defence is the same at every level: pair every number with the one that would reveal it being gamed, keep anything about individuals out of reports altogether, and handle individual performance through managers, evidence and calibration rather than through a metric.
Where practitioners disagree
Whether individual metrics have a place at all. McKinsey’s 2023 article ‘Yes, you can measure software developer productivity’ argued that they do, proposing measures layered on DORA and SPACE, some of them at the level of the individual developer. The Beck and Orosz response, and a wide part of the engineering-leadership community, argued that measuring individuals’ output distorts the work and damages the culture. Most heads of engineering you will meet land on Larson’s position: individual data for diagnosis, by the engineer and their manager, never as a performance measure.
Whether DORA belongs in the board deck. Some leaders show one delivery chart to the board because it signals a well-run organisation. Others never do, because a board member will compare it to a benchmark from another company. A common middle course is to show it once a year, as a trend with an explanation, and never as a quarterly key metric.
Whether to buy an engineering-intelligence platform. These tools pull data from version control, the tracker and the pipeline and produce DORA metrics and much else automatically. They save months of data work. They also make per-person activity charts available to every manager by default. If you buy one, decide in writing what is switched off before anyone logs in.
The monthly engineering report
The monthly report is the artefact the rest of the company knows engineering by. It is not a dashboard. It is a one-to-two-page written document, with a short appendix, sent before the executive meeting where it is discussed. Its sections follow Larson’s purposes, plan and operate at the top, and its credibility comes from four habits.
- The same format every month. A report whose sections change when the news is bad teaches its readers to look for what is missing.
- Misses beside hits. A slipped project appears in the same table as the shipped ones, with the reason and the new date. Readers trust the green rows because they can see the red ones.
- Counts beside rates, and rules beside colours. ‘Change fail rate 9%’ means little without ‘11 of 122 deploys’. A red, amber or green status follows a stated rule, such as amber when the forecast date has moved more than two weeks, so nobody can accuse a status of being a mood. Reports where everything is green until the week it is red are called watermelon reports for a reason.
- Definitions change only with a dated note. A metric quietly redefined becomes a lie without anyone meaning it.
Each section has a job. Summary: three sentences the CEO could repeat to the board. Delivery against plan: the quarter’s committed projects, status by rule, impact of what shipped where it can already be measured. Reliability: incidents as a count and a list, each linked to its review, and the state of the service level objectives that matter to customers, using the language of the SLOs and error budgets chapter. People: headcount against plan, hires, leavers, open roles. Cost: cloud and vendor spend, normalised against a business volume such as cost per thousand transactions, because an absolute bill rising with revenue is good news. Risks and asks: what could go wrong next month and what you need from the people reading. Appendix: engineering health, the DORA trend for the main services and the latest developer survey in aggregate, for anyone who wants it, labelled as engineering’s improvement instruments rather than goals.
Day to day
Weekly, about an hour. Read the operating page: incidents and their reviews, SLO burn, deploys blocked or rolled back. In your staff meeting with your engineering managers, walk the committed projects and update forecasts. This is where the monthly report’s content is made; if the status of a project surprises you on the day you write the report, your weekly review missed it.
Monthly, about four hours spread over the first week. On day one or two, the data pull: project status from the managers, incidents from the incident tool, headcount from the people team, spend from finance. Reconcile cost figures with the CFO’s team before you send anything, because two cost numbers for the same month will cost you more trust than any slip. Draft in an hour or two. Send it to your managers to check facts about their teams, then to the CEO a day before the executive meeting. In the meeting, speak to the summary and the asks, not the tables.
Quarterly. Run the developer survey and share the aggregate results with the whole engineering organisation, with what you will change. Review the DORA trends with each team’s leadership, per service. Re-baseline the plan with product and finance; the metrics and experiments chapter’s metrics tree is the shape to borrow when you connect engineering projects to company goals.
When someone asks for a new number. It happens every few weeks. Ask what decision it will inform and who will act on it. Most requests are a question you can answer once, with a query and a paragraph, rather than a chart you maintain forever. When the request is for a number about individuals, the decision that follows is the one this chapter’s Decide is about.
There is no report and no dashboard, and building either would be waste. With three or four teams, every metric is noise. The founder and you talk daily. What you can do is write a short weekly update: what shipped, what slipped and why, incidents, and one risk. It takes twenty minutes, and it becomes the monthly report later. Set up the raw data habits now: a deploy log, an incident channel with a review for each incident, and a plan written down at the start of each quarter so delivery against it can be seen.
This is when the monthly report is born and its habits set. Expect the first request for a productivity number when the board asks why headcount has doubled, and expect it to arrive as story points or commits. Your answer then sets the tone for years. Build the report around delivery against plan, reliability, people and cost, agree the definitions with your managers in writing, and start the developer survey before you need it, so you have a baseline. Reconcile costs with finance every month.
Reports roll up: each director writes one, a VP consolidates them, and the CTO reports to the board. The risk is that every layer smooths the bad news until everything is green. Ask for the misses table unedited from each director. Engineering-intelligence platforms, finance’s need to classify engineering time for capitalisation of software costs, and pressure to rank divisions all arrive here. Agree in writing which metrics may be compared across divisions, and which never leave the team.
Template
# Engineering report: <month year>
Author · Sent <date> · Discussed at <meeting, date>
Status rule: green = on forecast; amber = forecast moved > 2 weeks or at risk;
red = will miss the quarter. Definitions unchanged since <date> | changed: <note>
## Summary
<Three sentences: the headline on delivery, the headline on reliability or cost,
and the one thing you need.>
## Delivery against plan (<quarter>: <n> committed projects)
| Project | Team | Status | Forecast | Note (reason, impact so far) |
|---|---|---|---|---|
Shipped this month and what changed for customers:
- <project>: <outcome measured, or when it will be>
## Reliability
Incidents: <n> (<sev breakdown>), each linked to its review
| # | Date | Sev | Customer impact | Duration | Review |
|---|---|---|---|---|---|
SLOs: <the 2-4 customer-facing objectives, met or not, error budget left>
## People
Headcount <actual> / plan <n> by <date> · Hires <n> · Leavers <n> (regretted <n>)
Open roles: <n>, oldest <days>
## Cost
Cloud <£>, vendors <£>, total vs budget <£ / %>
Per <business unit, e.g. 1,000 transactions>: <£> (last month <£>)
Reconciled with finance: yes / no
## Risks next month
- <risk> — <likelihood, impact, what we are doing>
## Asks
- <who> — <what, by when>
## Appendix: engineering health (improvement instruments, not targets)
DORA trends for <main services>, per service, with counts.
Developer survey (<quarter>, response rate <n>%): team-level aggregates only. WORKED EXAMPLE
Maple is a fictional UK company providing invoicing and payouts for 9,000 small businesses: 210 people, 72 in engineering (64 engineers, 8 managers) across six product teams, a platform team and a data team. Extracts from the October report by the head of engineering, whose status rule is amber when a forecast moves more than two weeks and red when a project will miss the quarter:
Summary. Three of the quarter’s eleven committed projects shipped in October; same-day payouts slipped three weeks to 24 November because the bank partner’s certification ran long. Five incidents, none with money at risk, and cloud cost per 1,000 transactions fell from £50.43 to £49.17. Ask: the CEO’s help to escalate certification with the bank partner’s head of partnerships.
Delivery. Shipped: invoice reminders (Invoicing), Xero sync v2 (Integrations), new signup flow (Onboarding). Signup completion is up from 61% to 66% over 21 days (1,212 of 1,840 starts), early and from one cohort, so read it as provisional. Same-day payouts (Payouts): amber, forecast 24 November, reason above. The other seven: green.
Reliability. Five incidents: two severity 2 (a 38-minute delay to payout files on 9 October; invoice reminders failing to send for 2 hours 10 minutes on 22 October) and three severity 3, all linked to reviews. The payouts-on-time SLO was met at 99.93% against 99.9%.
People. 72 against a year-end plan of 76; three offers accepted for December starts; one leaver, regretted.
Cost. Cloud £118,000 for 2.4 million transactions (September: £116,000 for 2.3 million). Matches finance.
Appendix. Deploys to the payouts service: 41 in October, 4 needing intervention. Developer survey: 58 of 64 responded; satisfaction with build times is the lowest score for the second quarter, and the platform team’s Q1 plan addresses it.
Now you
You joined Nettle five weeks ago as VP Engineering. Nettle is a fictional delivery-tracking platform that sends shipment updates by SMS and WhatsApp for 600 retailers and couriers: 320 people, 110 in engineering (98 engineers, 12 managers) in fourteen teams, about 40 million tracked parcels a month. Your predecessor’s monthly report was 22 charts; the CEO has asked for ‘one page I can read before the board’. Your data is uneven: incidents live only in a Slack channel, where you count nine last month; five teams use story points and nine work in Kanban with no estimates; the cloud bill is £240,000 a month, up 31% over two quarters while parcel volume rose 12%. The biggest launch of the half, WhatsApp message templates, has slipped six weeks, and a top-ten customer is waiting for it. Write your first monthly engineering report. Say what you can report reliably now, what you cannot yet and when you will, and how you present the cost rise and the slip.
Self-check
You are head of engineering at Maple: 210 people, 64 engineers and 8 managers in eight teams. At the last board meeting a board member asked whether 64 engineers is the right number for a company of Maple's size. The CEO, who has to answer, asks you to add story points completed per engineer to the monthly report, starting next month. Three teams use points; the others do not estimate. What do you do?
- POST Measuring an engineering organization Will Larson, 2023
Measure to plan, operate, optimise and inspire, who each set of measures is for, and the anti-patterns, including judging teams on optimisation metrics and measuring individuals. The model this chapter's report is built on.
- BOOK Accelerate: The Science of Lean Software and DevOps Nicole Forsgren, Jez Humble and Gene Kim, 2018
The research behind the delivery metrics, the finding that throughput and stability move together, and a short account of why lines of code, velocity and utilisation fail as productivity measures. Read: Part one, chapter 2, Measuring Performance.
- DOC DORA's software delivery performance metrics DORA
The current five metrics and DORA's own list of pitfalls: setting them as goals, one metric to rule them all, comparing different applications, competing against other teams. Send it to anyone proposing a league table.
- PAPER The SPACE of Developer Productivity: There's more to it than you think Nicole Forsgren, Margaret-Anne Storey, Chandra Maddila, Tom Zimmermann, Brian Houck and Jenna Butler, 2021
The five dimensions, the myths, and the guidance to use several measures across dimensions including a perceptual one. Read the myths section before the next executive meeting where productivity comes up. Read: ACM Queue 19(1), 2021.
- POST Measuring developer productivity? A response to McKinsey Gergely Orosz and Kent Beck, 2023
The effort, output, outcome and impact chain, why measuring early in the chain changes the work, and the case for outcome measures. The clearest reply to an executive who has read the McKinsey article.
- POST Cannot Measure Productivity Martin Fowler, 2003
Two pages on why output, and so productivity, cannot be measured in software, and why delivered business value is the only true measure. Old, short and still unanswered.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.