A security engineer's week
Four queues that fill from other people's schedules, one project that nobody asks for, and the rotation that keeps the second from being eaten by the first
You are the only security engineer for 70 engineers. On Friday afternoon your manager asks how your week went. Which answer is the best evidence that it went well?
Ask a security engineer what they did this week and you hear about interruptions, much like Scaup’s. Together they fill every hour, and the work that would make next month quieter, the shared library, the automated check, the paved road, never starts.
This chapter is about giving that week a shape: the four queues and the project work they crowd out, where practitioners disagree, a two-week rhythm built around an interrupt rotation, and the exception request you will get every week. If you are coming from engineering, the PM and QA versions of this question are about protecting focus time from meetings. Yours is about protecting the future from the inbox.
The model: four queues and a project
Everything that reaches you arrives through one of four queues. Each has a different source, a different person waiting, and a different way of going wrong.
| Queue | What arrives | Who is waiting | What good turnaround looks like (rule of thumb) | How it fails |
|---|---|---|---|---|
| Reviews | Design docs, pull requests touching auth or money, new vendors, exception requests | An engineer who cannot start, merge or ship | Design reviews booked within a week; high-risk PRs within a day | Arrives at launch time, so the only options are block or wave through |
| Triage | Scanner output (SAST, dependency scanning, secret scanning, cloud posture), bug bounty and disclosure reports, pentest findings, detection alerts | Nobody, until an attacker | New criticals looked at the same day; everything else within the week | Grows until nobody reads it, then gets bulk-closed |
| Questions | Channel questions, customer security questionnaires, auditor evidence requests, “is this library OK?” | A colleague mid-task, or a salesperson mid-deal | Channel questions same day; questionnaires to an agreed date | Answered one at a time, forever, because nobody writes the answer down |
| Projects | A paved-road library, a CI check, an access review automation, a threat model of a critical system | Nobody is asking | Steady progress each fortnight | Starts every quarter, finishes never |
The first three are interrupt work. They arrive on other people’s schedules and someone is waiting on the other end, which is why they always win. The fourth is leverage work. A secret-scanning hook in CI removes a whole category from the triage queue. A blessed authentication library with good defaults removes a whole category of review comments. A questionnaire answer library turns each customer questionnaire from days of writing into hours of checking. Projects are the only part of the week that makes the other three smaller.
The arithmetic is unforgiving. If the queues take all your hours this month, they will take more next month, because the company keeps shipping code, buying vendors and closing bigger customers. A week with no project time is a week in which you fell further behind.
Exceptions deserve their own mention because they look like questions and are really reviews. An engineer asking “can we ship without the scoped role and fix it next sprint?” is asking you to help the business accept a risk. That is a decision with an owner, a cost and an expiry date, and it gets its own section below.
Gatekeeper, advisor or toolsmith
Practitioners agree on the four queues. They disagree, sometimes sharply, about how much of each queue the security engineer should personally do.
The gatekeeper model says security reviews every design and every risky change before it ships. It catches things, and in regulated payments work some of it is mandatory: a change to card-data handling under PCI DSS needs evidence that someone qualified looked. Its failure is arithmetic. One reviewer for seventy engineers becomes a queue, the queue becomes a delay, and the delay teaches teams to bring you things late or not at all.
The advisor model says security’s job is to help teams make good decisions themselves: office hours, training, threat-modelling sessions the team leads, a channel where questions get fast answers. Bell, Brunton-Spall, Smith and Bird argue for this in Agile Application Security: security has to work inside the team’s iterations, at the team’s cadence, rather than as a stage gate at the end. Its failure is that advice is optional, and the team under the most deadline pressure is the one least likely to ask.
The toolsmith model says the best review is the one you do not have to do, because the safe path is the default: the framework escapes output, the deploy pipeline blocks plaintext secrets, the cloud account cannot create a public bucket. Google’s Building Secure and Reliable Systems puts much of its weight here, and the Lead-level chapter on security champions and paved roads covers how to build them. Its failure is time. Paved roads take quarters to build and adopt, and the queues do not stop while you build them.
Most mature teams run all three, deliberately weighted. Slack’s published goSDL process, in the reading, is a clean example: the engineer starts a review with a slash command, answers a short set of questions that produce a risk rating, gets a generated checklist for their components, and only the higher-risk features pull in a product security engineer for a full review. Low-risk work gets advice and a checklist. High-risk work gets a gate. Everything gets tracked. Tanya Janca’s Alice and Bob Learn Application Security calls the underlying idea “pushing left”: move the security conversation earlier in the life cycle, where it costs a question rather than a rewrite.
Where you sit on that spectrum is a decision about your week: a gatekeeper’s week is mostly reviews, an advisor’s mostly questions, a toolsmith’s mostly projects. If you have not decided, the queues decide for you, and they always choose gatekeeper.
What to know: the vocabulary of the week
You will hear these names in your first week, and each is a recurring piece of work with its own rhythm.
- Security design review. A conversation, usually 30 to 60 minutes, about a design doc before code is written. Often built around a lightweight threat model: what are the assets, the trust boundaries, the entry points, and what could go wrong at each. Threat modelling, later in this track, covers the method; the week needs only the habit.
- Code review for security. Reading the diff for the bug classes attackers use: injection, XSS, CSRF, broken authentication and session handling (hardening a login walks through one), and secrets in the wrong place (secrets rotation and replay). You will not review every PR. You will agree which paths require you: auth, payments, cryptography, permissions.
- The scanners. SAST reads source code for dangerous patterns. SCA, or dependency scanning, matches your libraries against published CVEs. Secret scanning looks for keys and tokens in commits. Cloud security posture tools look for misconfigured accounts. Each produces findings at a rate no human can read one by one.
- Triage signals. CVSS scores how bad a vulnerability would be if exploited. EPSS, published daily by FIRST, estimates how likely a CVE is to be exploited in the next 30 days. CISA’s Known Exploited Vulnerabilities catalogue lists CVEs seen exploited in the wild. Together with whether the vulnerable code is reachable in your system, they turn 400 findings into the twelve that matter. Vulnerability management covers the policy; your week needs a daily habit of applying it.
- Disclosure and bug bounty inbox. Reports from outside researchers, arriving through a vulnerability disclosure policy, a
security.txtfile (RFC 9116) or a bounty platform. Each needs an acknowledgement, a reproduction and a decision, on a timeline you published. - Security questionnaires. Customers buying B2B software send long questionnaires, often based on the Shared Assessments SIG or the Cloud Security Alliance CAIQ. In a company selling to banks or enterprises, this can be the largest single queue in the week.
- Exceptions, or risk acceptances. A documented, time-limited decision to run with a known weakness. More below.
- Audit evidence. Under SOC 2, ISO 27001 or PCI DSS, someone collects the tickets and exports that prove controls ran. At a small company, you.
Exceptions: the request you will get every week
Every week someone asks to ship with something you would rather they fixed. The service account has broader access than it needs. The dependency has a high-severity CVE and the upgrade breaks the build. The pentest finding will be fixed next sprint.
What goes wrong first. Saying no without an alternative teaches the team to stop asking. Saying yes in a chat message creates a risk nobody owns, with no end date, that the next auditor or attacker finds before you do. Both happen most often on the day you are busiest.
An exception that holds up has five parts:
- The risk in one sentence, in business terms. “Any compromise of the export service would expose every customer’s transaction history, not only the requesting customer’s.”
- A risk owner who signs. The head of the product area or the engineering director, not you. Security describes the risk and recommends; the business accepts it, because the business gets the benefit of shipping. This keeps the decision with the person who can trade it against revenue, and it keeps security from becoming the department that is blamed for both outcomes.
- Compensating controls. What reduces the risk in the meantime: narrower rollout, extra logging and an alert, a feature flag that can turn it off, a manual review step.
- An expiry date, short. Thirty to ninety days is a common rule of thumb. An exception without one is a permanent policy change nobody approved.
- An entry in the register, which someone reviews on a fixed day. An expired exception is either renewed by its owner, with a reason, or escalated.
Handled this way, exceptions are not failures. They are the honest record of the trade-offs a business makes, and the register tells your manager, the auditor and your successor exactly which risks the company chose to carry. At Head level the same register feeds the company’s risk register, which security risk and the board covers.
Day to day
The week below is for a product security engineer at Scaup, the business-banking platform in the opening story, after the team rebuilt its week: 180 people with about 70 engineers in nine product teams. The security team is two engineers and a manager who also covers compliance. The specifics are an example, not a standard. The shape is the point: the queues are served by whoever is on rotation, the other engineer gets project time, and a small number of fixed points each week keep everything visible.
The two-week rhythm
Google’s SRE book, in its chapter on dealing with interrupts, argues that interrupt work and project work should be separated in time rather than mixed in every day, ideally in week-long blocks: one person takes the pager and the tickets so everyone else gets unbroken focus. The advice was written for operations teams and transfers well to security. Scaup’s two engineers alternate:
Duty week. You own every inbound queue. You are the name in the security channel topic, the first responder for alerts, the person who triages scanner output and the disclosure inbox, and the one who takes new review requests and books them. You do not promise project progress this week. If the queues are quiet, you write up the answers you gave so the next person does not have to answer them again.
Build week. You own one project. Your calendar has the weekly fixed points and nothing else, and you answer the channel only if the duty engineer tags you for a second opinion. A build week with fewer than three clear days is a sign the rotation is leaking, and you say so at the Friday handover.
Every day on duty
First hour: triage. Read what arrived overnight, in this order. Detection alerts, because an alert that is a real intrusion gets worse by the hour. The disclosure inbox, because outside researchers were promised an acknowledgement within a published number of days. New critical and high findings from the scanners, filtered: is the CVE in the KEV catalogue, what is its EPSS score, is the vulnerable function reachable, is the service internet-facing, who owns it. Most findings close in that pass as unreachable, duplicate or false positive, each with a one-line reason. The rest become tickets in the owning team’s backlog with a due date from the SLA policy. This is the step that failed at Equifax, in the story that opens this track: a notice that went to a list rather than to a named owner who confirmed it.
Mid-morning: reviews. One or two booked design reviews, 45 minutes each, with the design doc read beforehand. You leave each with written notes in the doc: the threats you discussed, what the team agreed to change, what you are accepting, and whether you need to see it again. A review whose only output is a conversation will be remembered differently by everyone in the room.
After lunch: questions. Work the channel, any questionnaire due this week, and auditor requests. For every question you answer twice, write the answer into the shared knowledge base and link to it the third time. For questionnaires, answer from the answer library first and only write new text for the questions it does not cover.
Late afternoon: PR reviews and loose ends. Security-tagged pull requests, retests of fixed findings, and closing the loop on anything you promised in the morning.
The fixed points each week
| When | What | Who | What comes out |
|---|---|---|---|
| Monday, 30 min | Queue review and plan | Both engineers, the manager | The week’s top risk named; which reviews are booked; anything carried over |
| Tuesday and Thursday, 60 min each | Office hours | Duty engineer, anyone who drops in | Questions answered before code is written; review requests booked |
| Wednesday, 30 min | Vulnerability review with engineering leads | Duty engineer, the nine team leads (asynchronous for most) | Overdue findings: fixed, re-dated with a reason, or raised as an exception |
| Thursday, 30 min | Exception board | Manager, duty engineer, requesting team’s risk owner | Exceptions approved with expiry, renewed or refused |
| Friday, 30 min | Handover | Both engineers | Open items moved to next week’s duty engineer; one thing the duty week taught you, written down |
Each has a written output, and each makes a queue visible to someone outside security: overdue findings to the people who can schedule fixes, risk acceptance to the person who owns the risk, and you to engineers before they write the code, which is where Janca’s “push left” lives in practice.
Monthly and quarterly
Monthly. Read the exception register and chase anything expiring. Look at the queue metrics: time to first look at a critical finding, findings past their SLA by team, review requests that arrived after the build had started. That last number is the most honest measure of whether pushing left is working. Spend an hour on the disclosure reports and incidents of the month and ask which project would have prevented them.
Quarterly. Choose the next project from that list, with the engineering leads, because they will adopt it or not. Run an access review of production and admin roles. Scope the next external pentest. Run a tabletop exercise: a scenario such as a leaked cloud key or a compromised support account, walked through with the people who would handle it. Prepare audit evidence if a SOC 2 or ISO 27001 window is open.
A request’s journey
Here is one request through the system. On Tuesday the payments team posts a design doc for a bulk-payments API that lets accountants upload a file of up to 500 payees. The duty engineer sees it in the channel, books a review for Thursday, and asks two questions in the doc beforehand: how is the file’s payee list authorised against the account’s approval rules, and what stops a replayed upload paying twice? In the review the team agrees to require the same dual approval as the web flow and to use an idempotency key per file. The engineer writes four lines of notes in the doc, adds the API to the list of paths requiring a security PR review, and adds a line to next Monday’s queue review: confirm the idempotency work is in the sprint. Three weeks later the PR review takes twenty minutes because the design was already agreed, and nothing is blocked at launch.
Where weeks go wrong
The inbox becomes the job. Every hour goes to the queues, the projects slip a quarter at a time, and the queues grow because nothing reduces them. The fix is structural: a rotation, or at minimum two protected days a week, defended at the Monday planning.
Findings filed as output. Pasting scanner output into other teams’ backlogs feels productive and is mostly noise. Teams learn to ignore the security label. Triage first, file what matters, and measure what got fixed.
Late reviews treated as normal. If most design reviews arrive the week before launch, every review becomes block-or-wave-through, and you will usually wave through. Track it, show it to the engineering leads monthly, and move office hours to where the planning happens.
Answers that live in your head. If the same question reaches you every week, you are the bottleneck. Write it down, and point the next asker at the page.
Hero mode. One engineer takes every alert, every evening, until they leave or burn out and nobody else knows how anything works. Rotations and written runbooks are how a small team survives.
No without a path. Refusing an exception with no alternative pushes the risk underground. Offer a narrower version, a compensating control, or a date, and write the refusal down with its reason.
There is no security team. Security is a slice of a senior engineer’s or the CTO’s week, and the queues arrive anyway: the first enterprise customer’s questionnaire, a dependency alert, an investor asking about SOC 2. The cadence that works is small and fixed: thirty minutes on Monday for dependency and secret-scanning alerts, a shared page of questionnaire answers, a short exceptions list in the same doc, and one project per quarter, usually single sign-on everywhere and secrets out of the code. The risk is not too little process. It is no regular hour at all, so nothing gets looked at until a customer asks.
The first one to five security engineers are hired, and the queues arrive faster than the team grows. This is where the shape of the week is decided. Without a rotation, every engineer is interrupted all day and no project lands. With one, someone is reliably on duty and the others build paved roads. You set up the fixed points: office hours, a vulnerability review with team leads, an exception register with expiry dates. Questionnaire volume rises with every enterprise deal, and an answer library or a public trust page is often the first project worth doing.
The queues are owned by different teams: a SOC handles alerts, a vulnerability management team runs triage and SLAs, a GRC team handles questionnaires and audits, and product security handles reviews. Your week has fewer kinds of work and more coordination. Reviews come through a formal intake, often with a risk tier that decides how much attention each gets. Exceptions go to a governance board with business risk owners. The failure is the hand-offs: a finding that passes between three teams and is owned by none. Know who owns each step.
Template
# Security weekly cadence: <team or company>
Owner · Last reviewed · Engineers served: <n> · Security engineers: <n>
## Queues
| Queue | Sources | Owner this week | Turnaround target (source) | Where it is tracked |
|---|---|---|---|---|
| Reviews | design docs, security-tagged PRs, vendors | | | |
| Triage | scanners, disclosure inbox, alerts, pentest | | | |
| Questions | channel, questionnaires, auditors | | | |
| Exceptions | requests from teams | | | |
## Rotation
- Duty: <who, how long>. Covers: <queues>. Does not promise project work.
- Build: <who>. Interrupted only for: <criteria>.
- Handover: <day, time, what gets written>
## Triage order (daily, first hour)
1. Detection alerts
2. Disclosure inbox (acknowledge within <n> days)
3. New critical/high findings, filtered by: KEV, EPSS, reachability, exposure, owner
4. Everything else: weekly batch
## Fixed points
| When | Meeting | Attendees | Written output |
|---|---|---|---|
## Exceptions
Risk sentence · Risk owner (outside security) · Compensating controls · Expiry · Register link
## Project this quarter
<one project, why it shrinks a queue, the milestone for each fortnight>
## Monthly check
- Findings past SLA, by team
- Review requests that arrived after build started
- Exceptions expiring this month
- Questions answered more than twice that are not yet written down
## When the week breaks
Drop first: <...> · Never drop: <...> · Tell: <who, where> WORKED EXAMPLE
Scaup is a fictional business-banking platform: 180 people, about 70 engineers in nine teams, two security engineers and a manager who also covers compliance. The team wrote this cadence after a quarter in which neither engineer finished a project.
Queues. Reviews: design docs and PRs touching auth, payments, permissions or cryptography; target is a design review booked within five working days and a PR review within one working day (team rule of thumb, reviewed quarterly). Triage: dependency and secret scanning, cloud posture, the disclosure inbox, about 120 new findings a week before filtering; criticals looked at the same day. Questions: the security channel, roughly 25 a week, and two or three customer questionnaires a month. Exceptions: four to six open at any time.
Rotation. Alternating weeks. Duty covers all four queues. Build is interrupted only for a live incident or a critical finding in the KEV catalogue. Handover on Friday at 16:00 with a written list.
Triage order. Alerts, then disclosures (acknowledged within three working days, as the published policy says), then new findings filtered by KEV, EPSS above an agreed threshold, internet exposure and reachability. In the first month the filter turned 480 findings into 17 tickets, each in the owning team’s backlog with a due date.
Fixed points. Monday queue review; office hours Tuesday and Thursday; Wednesday vulnerability review with team leads, asynchronous unless something is overdue; Thursday exception board with the head of payments as standing risk owner for payment systems.
Project. An answer library for questionnaires: target is cutting a 250-question questionnaire from two days to half a day by end of quarter.
When the week breaks. Drop office hours and PR reviews for non-payment code first. Never drop the first-hour triage or the exception board.
Now you
You have joined Eider, a fictional customer-support chat tool used by 1,400 businesses, as its first security engineer. Eider has 90 people and 45 engineers in six teams. Dependency scanning shows 610 open alerts, nobody has looked at them in four months, and secret scanning is not turned on. The security channel gets around 20 questions a week, mostly answered by the CTO. Sales receives five enterprise security questionnaires a month, each 150 to 300 questions, and wants them back in three working days. The SOC 2 Type II observation window started last month. A team is designing a feature that uses an LLM to summarise support transcripts, which contain customers’ personal data. The complication: the CTO wants you to review every pull request touching authentication, about 15 a week, and you are alone until a second hire starts in four months. Write the weekly cadence for your first quarter. Say how you handle being a team of one, which project you choose, and what you tell the CTO about the PR reviews.
Self-check
You are the duty security engineer at Scaup, a business-banking platform. Your colleague is on leave. It is Tuesday morning and three things want today. First, three design reviews were requested: a bulk-payments API that starts build on Monday, a move of the statement-export service to a new message queue, and a marketing landing page that adds a third-party analytics script. Second, the vulnerability backlog has 140 open findings, nine of them critical or high and past their SLA, with SOC 2 evidence due in two weeks. Third, an engineer asks for a 60-day exception to launch the bulk-payments beta on Thursday with a service account that can read every customer's ledger, because the scoped role is not finished. What do you do with today?
- BOOK Agile Application Security Laura Bell, Michael Brunton-Spall, Rich Smith and Jim Bird, 2017
The case for security that works inside a team's iterations rather than as a gate at the end, and a clear account of risk, threat actors and common security misconceptions. Read: Chapters 1 to 3: Getting Started with Security, Agile Enablers, Welcome to the Agile Revolution. Then chapter 4 on fitting into an existing life cycle..
- BOOK Alice and Bob Learn Application Security Tanya Janca, 2020
A practitioner's account of pushing security left, and of the activities an application security programme actually runs week to week. Read: Chapter 1, Security Fundamentals, and chapter 7, An AppSec Program.
- POST Moving Fast and Securing Things Max Feldman, 2018
Slack's self-service security review process, goSDL: risk-rated intake, generated checklists, full review only for high-risk work, plus a triage channel and weekly office hours.
- HANDBOOK Dealing with Interrupts Dave O'Connor, in Site Reliability Engineering (Google)
The argument for polarising time into interrupt weeks and project weeks. Written for SRE teams; read it as the design of a security duty rotation.
- BOOK Building Secure and Reliable Systems, chapter 21: Building a Culture of Security and Reliability Heather Adkins, Betsy Beyer, Paul Blankinship, Piotr Lewandowski, Ana Oprea and Adam Stubblefield, 2020
How Google thinks about review, saying yes with conditions and convincing leadership, which is the human side of every exception and design review. Read: Chapter 21, especially the sections on a culture of review and a culture of yes.
- DOC Exploit Prediction Scoring System (EPSS) FIRST
The daily exploitation-probability scores that make the first hour of triage possible. Read the user guide before you build your filter.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.