Reliability and infrastructure strategy
At the head of infrastructure you place a few long bets: where the company runs, how much reliability each tier of service buys, how it pays for capacity, and how it would leave its provider. Write them in one memo the CFO and the risk committee can both read
Your payment flow was down for three hours during a cloud provider's regional incident. The board risk committee asks what you will do so that it does not happen again. What do you bring to its next meeting?
As a Head of Platform, Head of Infrastructure or VP Infrastructure you do not decide each SLO, each capacity plan or each vendor. Your teams do, using the practices in the rest of this track. You decide the few things that outlive them all: where the company’s systems run, how much reliability each class of service buys, how the company pays for its capacity, what the platform builds and what it rents, and how the company would leave its provider if it had to. Most of these are expensive to reverse. Together they are your infrastructure strategy, and the head of engineering and the CFO judge you on it.
This chapter does not teach strategy again. The kernel of diagnosis, guiding policy and coherent actions is applied by a staff engineer in Technical strategy and by an executive in Engineering strategy and planning. Your memo sits between them: narrower than the head of engineering’s, but with a budget and a team behind it, which a staff engineer’s lacks. Vendor evaluation and build versus buy are in The principal and the business. The budget vocabulary, unit cost, cost of revenue and the FinOps phases, is in Headcount, budget and cost. This chapter assumes all three.
What the strategy has to decide
An infrastructure strategy that tries to decide everything decides nothing. Five decisions belong to you. Each has a different horizon and a different person who signs it.
| Decision | Typical horizon | Reversibility | Who signs |
|---|---|---|---|
| Where you run: provider, regions, any own hardware | 3–5 years | One-way door: moving a provider takes quarters or years | Head of engineering, with the CFO; the board if regulated |
| Reliability by tier: which journeys get which resilience pattern | 1–2 years | Partly reversible, but a second region is hard to remove once teams depend on it | Head of engineering and head of product, for tier 1 |
| How you pay: commitments, their size and term | 1–3 years, the commitment term | Fixed for the term | CFO, on your recommendation |
| What the platform builds and what it rents | 2–3 years | Varies; managed services are easy to adopt and hard to leave | You, within the head of engineering’s architecture governance |
| The exit: how you would leave a provider, how fast, at what cost | Reviewed yearly | It is the reversal | You, with risk and, where regulated, the regulator’s expectations |
The table is the memo’s skeleton. Every other decision, the instance type, the queue, the deployment tool, belongs to the platform teams. How you organise those teams is the subject of Building an SRE or platform org.
Bezos’s one-way and two-way doors, used in architecture governance, tell you where to spend your time: the provider and the exit deserve a written argument; most platform choices are two-way doors to push down.
Reliability is bought by the tier
The most expensive mistake in infrastructure strategy is buying the same reliability for everything. Put every service in two regions and you pay to protect the analytics pipeline as carefully as the ledger; buy nothing extra and the ledger is as exposed as the analytics pipeline. Neither is a decision.
Tiering is the decision. Group journeys, not services, by what an outage costs: revenue lost per hour, customers who cannot get their money, a regulator’s impact tolerance, a contractual penalty. Then give each tier a target and a resilience pattern. The SLO for each journey is agreed with product, as in SLOs in practice. The head of engineering signs which journeys are tier 1 and what the company trades for them, as in Owning reliability, security and compliance. Your job is the price list.
Recovery time and recovery point objectives, recovery tiers and the four recovery strategies from AWS’s disaster recovery whitepaper are taught in Disaster recovery and business continuity. The same tiers decide who holds the pager in Building an SRE or platform org. At your level the question is the portfolio: how much of the estate sits in each tier, and what the whole set costs.
| Protection | Survives | Rough cost on top of a single zone (illustrative) |
|---|---|---|
| Multi-zone in one region | Loss of a zone | About 1.5x, for compute sized to lose one zone of three |
| Warm standby in a second region | Loss of a region, recovered in minutes to tens of minutes | A scaled-down copy, often 30–50% of the tier’s cost |
| Active-active in two regions | Loss of a region, with no failover step | About 2x, plus design work for writes in two places |
| Any of these on a second provider | Loss of a provider | All of the above, plus the engineers who keep two platforms at parity |
The zone arithmetic is in Capacity and cost. The ratios are illustrative; price your own tiers from your own bill.
Three rules keep the tiers honest. Tier 1 is small. If more than a handful of journeys are tier 1, the tiers are measuring importance to their owners rather than outage cost. Every tier has a degraded mode. A tier-2 service that fails should fail into something users can live with, as graceful degradation shows, not into a dependency that takes tier 1 down with it. No pattern counts until it has been tested. A second region that has never taken traffic is a hope. The disaster recovery chapter covers the exercises; your strategy funds them and reads their results.
The bill is part of the strategy
Your teams run the monthly cost review. You own the trend and what it says about the strategy. Unit cost, cloud spend divided by the business driver, is the number to put on the first page. Take Spinel, a fictional cross-border remittance company: 650 people, 200 engineers, 1.8 million transfers a month. Its cloud bill rose from $6.4 million on 16.0 million transfers last year to $9.6 million on 21.6 million transfers this year. That is $400 to $444 per thousand transfers, up 11%. Volume explains most of the growth. The 11% is the part that needs a reason in the memo: a new sanctions-screening service, a second region, telemetry growth, or waste.
Production hosting usually sits in cost of revenue, so a change in unit cost moves gross margin. Sarah Wang and Martin Casado’s The Cost of Cloud, a Trillion Dollar Paradox makes that argument at length, and the head of engineering chapter on budgets reads it for you. Two of its recommendations belong in your memo. Make infrastructure cost “a key performance indicator for the business”, which means unit cost in the CFO’s monthly pack, not only in your dashboards. And treat repatriation as a question about particular workloads. The essay says “repatriation likely only makes sense for a subset of the most resource-intensive workloads.” If one workload is large, steady and well understood, and you have people who can run hardware, cost it; otherwise say in one line why not.
Commitments are strategy, not procurement. Capacity and cost teaches the practitioner rule: commit to the floor. Your rule sits above it: the term must not outrun the strategy. A three-year commitment says the company will run that usage with that provider in that region for three years. If the memo plans a second region, a new provider for one workload, or a platform migration that changes the compute model, the commitment term has to fit around it. The CFO signs the commitment and should see that bet in writing.
One cloud, several, or your own
The provider question arrives after every large outage and at every board risk review. Answer it before it is asked, in the memo.
Start with what multi-cloud means, because the word covers four very different things.
| What people mean | What it protects against | What it costs | How common |
|---|---|---|---|
| Different workloads on different providers, often after an acquisition or for one managed service | Little; each workload still depends on one provider | A second set of skills, accounts and contracts | Common |
| Backups and records copied to a second provider or own storage | Losing data, and losing access to it in a stressed exit | Storage, egress and a tested restore | Cheap; often the best value |
| A warm standby of tier 1 on a second provider | A provider-wide failure, slowly | A second platform kept current, and failovers that decay unless exercised | Rare |
| One workload active-active across providers | A provider-wide failure, quickly | Double infrastructure, parity engineering, and only the features both providers share | Very rare |
Corey Quinn’s essay Multi-Cloud is the Worst Practice argues for the default you should start from: he calls multi-cloud a “worst practice” that should be “avoided by default”. His argument is that treating every provider as the same leaves you with the primitives they share: “You’re improving your data center at the expense of your cloud environment.” He also names the exceptions: “‘A customer demands it’ is one such reason and ‘people will actually die if this service goes down’ is another.” A regulator or a large partner can be the customer who demands it.
Gregor Hohpe’s Don’t get locked up into avoiding lock-in, which the principal track uses for vendor exits, gives you the model for the board. Lock-in is a liability, “the product of switching cost times the likelihood that it occurs”, and lowering it has a price: “Complexity can be the biggest price you pay for reducing lock-in.” He warns that most approaches of this kind “negate the very reason you’d want to go to the cloud: low friction.” For a head of infrastructure this turns into two separate risks.
Provider outage. A regional failure, like October 2025’s, is covered by a second region with the same provider at a fraction of the cost of a second provider. The October 2025 summary is a reminder that some provider services are global or depend on one region: some customers using root credentials or federation through signin.aws.amazon.com had errors signing into the console in other regions. So list your tier-1 journeys’ dependencies on global services, not only regional ones, and decide whether each needs a fallback.
Provider exit. The provider fails as a business, is sanctioned in a market, suspends your account, or raises prices beyond what you can bear. This is a slow risk. A plan answers it better than a second live platform can: your data held somewhere you control, infrastructure defined as code, an estimate of how long a move would take, and a tested restore outside the provider.
One prudential regulator’s text shows how this is framed. The UK Prudential Regulation Authority’s supervisory statement SS2/21, Outsourcing and third party risk management, applies to banks, building societies, PRA-designated investment firms and insurers. Section 10 of the 2021 text, as published on the PRA Rulebook and read on 7 November 2026, expects an exit strategy covering both a planned exit and a stressed one, “following the failure or insolvency of the service provider”. It lists cloud resiliency options: multiple regions, multiple zones, hybrid cloud, “multiple or back-up vendors”, and bringing data or applications back on-premises. Then it says: “There is no hierarchy or one-size-fits-all combination of cloud resiliency options,” and “The PRA does not prescribe or have a preferred form of exit in stressed scenarios.” The Bank of England lists later versions of SS2/21, one effective from 31 December 2024 and one from 18 March 2027, so read the version that applies to you on the day you write. Other regulators, such as the EU’s under the Digital Operational Resilience Act, have their own texts. In SS2/21 the requirement is a credible, tested, proportionate exit; a second live provider is one way to meet it, not the only one.
Data residency and the regulator
Where data may live is a gate, not a preference, and it changes. Data protection laws, central bank outsourcing rules, payment licence conditions and public-sector contracts differ in what they require. Some require data to stay in the country, some require a copy in the country, and some allow transfers abroad with safeguards. Each of these needs a different architecture: in-country processing, in-country replication, or a contract and an assessment.
Four rules keep the memo safe from your own memory:
- Cite the text, not a summary. Name the law, regulation or licence condition, link to the regulator’s own publication, and write the date you read it. A vendor’s compliance page or a law firm’s blog post is a pointer to the text, not the text.
- Have counsel confirm. You state what the architecture can do; your legal or compliance lead states what the rule requires.
- Mark what you could not confirm. “Unconfirmed: whether a copy in a neighbouring country satisfies the licence” is an honest line. A confident paraphrase is a risk.
- Review on a date. These rules are amended, and new markets bring new ones. Put the residency table on the strategy’s quarterly review.
Writing the memo
The memo has three readers. The head of engineering reads the decisions and the asks. The CFO reads the bill, the commitments and the unit cost. The risk committee, or the CEO at a smaller company, reads the tiers, the provider position and the exit. Write the first page so each of them finds their part without reading the rest: the diagnosis in four sentences, the decisions in a table, the asks.
The diagnosis follows the same rules as any strategy: specific, falsifiable, with numbers someone else can check. “Cloud costs are too high” is a mood. At Spinel, “cost per thousand transfers rose 11% while volume rose 35%, and two-thirds of the rise is the new sanctions-screening service, sized for a month-end peak that lasts about four hours” is a diagnosis. Put the reliability record beside it: incidents by tier over the year, minutes of tier-1 impact, and the one incident that shaped this memo.
Translate every option into the reader’s units, as the principal chapter teaches: customers affected, hours, dollars, the date that moves. “Warm standby in a second region” means nothing to a risk committee. “If the region fails, transfers resume in about 30 minutes instead of when the provider recovers, for about $1.1 million a year” is something they can decide on.
Then the part most strategies leave out: what would make it wrong. A provider price change above a threshold, a regulator’s new text, a market that needs a region your provider does not have, a tier-1 failover test that misses its target twice. Name the evidence and a review date.
Where practitioners disagree
Multi-cloud as resilience or as waste. Quinn’s default is one provider. Some regulated firms, and companies whose biggest customers demand it, run tier 1 across two. Both camps are right about their own situation. The disagreement is usually about which risk dominates, outage or exit, and how much the company will pay to cover it.
Managed services or portability. Using the provider’s managed databases, queues and identity buys speed and pushes operations onto the provider. Building on portable open-source components keeps the exit cheaper and the operations yours. Hohpe’s model settles most cases: pay for portability where switching is likely and expensive, and nowhere else.
Who owns reliability spend. Some heads hold a central reliability budget so tier-1 protection is not traded away by one team’s roadmap. Others push the cost to the product lines so the people who benefit see the price. The second changes behaviour. The first protects tier 1 when money is tight.
Day to day
Weekly, about two hours. Read the incident summaries with a tier lens: did a tier-2 failure reach tier 1, did a degraded mode work as designed. Glance at the cost anomaly report. Sit in the operations review your SRE leads run. When finance or a product leader asks something the memo should answer and does not, note it for the next revision.
Monthly. An hour with your finance business partner on actuals against forecast, unit cost and commitment utilisation. A call with your provider’s account team about their roadmap in your regions, quota, and anything that affects your exit; procurement handles discounts. A short tier review with the head of product when a new journey launches.
Quarterly. The strategy review: assumptions against evidence, the failover test results, the residency table, commitments due to expire and contracts due for renewal in the next two quarters. A one-page report to the head of engineering, and to the risk committee where one exists, with tier-1 minutes of impact, unit cost, and the status of the exit plan.
Yearly. Rewrite the memo four to eight weeks (a rule of thumb) before the planning cycle, so its asks reach the plan in time. Run the exit exercise: restore tier-1 data outside the provider and time it. Meet the regulator or auditors if your sector has them. Retire decisions that no longer hold.
On demand. After a large provider incident, read the provider’s post-event summary as closely as your own postmortem, run through Incident management. Then check it against your tiers and your dependency list before anyone asks whether you should be on two clouds.
There is no head of infrastructure. The CTO or a founding engineer makes these calls, and the strategy is one paragraph: one provider, one region, managed services for anything that is not the product, and backups that have been restored at least once. Multi-zone for the database is usually worth it. A second region rarely is. The unit cost is runway: know the monthly bill and when startup credits expire. The one-way door to watch is the free or credit-funded service that becomes the critical path with nobody having read its terms.
The first Head of Platform or Head of Infrastructure arrives, often because the bill crossed a line the CFO noticed or a large outage reached the board. This is when to write the first memo: tier the journeys for the first time, buy the first commitment sized to the floor, run the first disaster recovery test, and write down the provider position before an enterprise customer’s security questionnaire asks for it. The platform team is small, so every managed service it adopts frees people. Expect the first residency question from a new market or customer.
The memo is one of several: a FinOps team buys commitments, a risk function owns third-party and concentration risk, and regulators may have their own expectations of the exit plan. Multi-cloud often exists already through acquisitions, so the strategy decides what to converge, not what to add. The board risk committee reads your tier-1 report. The hard part is political: a business unit attached to its own provider, a regulator in one market, a contract signed at group level. Write the evidence so it survives each of them.
Template
# Infrastructure strategy, <period>
Author: <head of platform / infrastructure> · Decider: <head of engineering>
Readers: <CFO, risk committee, head of product> · Status: draft | adopted
Serves: <the engineering strategy it sits inside>
## Diagnosis
<Four to six sentences. Unit cost now and a year ago, and why it moved.
Reliability record by tier. The concentration or residency risk. Sources inline.>
## Decisions
| Decision | Choice | One-way door? | Signed by |
|---|---|---|---|
| Where we run | | | |
| Reliability by tier | | | |
| How we pay | | | |
| Build or rent at the platform layer | | | |
| Exit | | | |
## Reliability tiers
| Tier | Journeys | SLO | Recovery time | Recovery point | Pattern | Annual cost |
|---|---|---|---|---|---|---|
| 1 | | | | | | |
| 2 | | | | | | |
| 3 | | | | | | |
Degraded mode for each tier: <...>
## Cost
Unit cost: <metric>, last year <x>, now <y>, target <z> by <date>.
Commitments: <amount, term, expiry>; floor: <...>; term fits the plan because <...>.
## Provider position and exit
Position: <one provider | ...>. Protects against: <...>. Does not: <...>.
Global dependencies of tier 1: <...>.
Stressed exit: data held at <...>; restore outside provider timed at <...>;
estimated move: <time, engineer-months, cost>; triggers: <...>.
## Residency and regulation
| Market or rule | Requirement | Source and link | Read on | Confirmed by |
|---|---|---|---|---|
## What this asks of the plan
<People, money, dates that move. A recommendation; the decider decides.>
## Assumptions and review
| Assumption | Evidence we will watch | Review date |
|---|---|---| WORKED EXAMPLE
Calcite is a fictional casual mobile games company: 90 people, 35 engineers in six teams (three game teams of six, Live Ops backend 7, Platform 5, Data 5). It runs three live titles with 2.4 million daily active users (DAU) and makes $38 million a year from ads and in-app purchases. Camila, Head of Platform, wrote this; Haruto, the CTO, decides.
Diagnosis. Cloud cost $4.3 million this year, 11% of revenue, up 52% while DAU rose 20%. Per 1,000 DAU per month it went from $118 to $149. Analytics events are $1.5 million of the bill. Most of the growth is there, from events nobody queries kept for 25 months. Two launch-day outages last year, about two hours each, both from the player-save database saturating. The self-run container cluster has one expert. The fourth title launches in Q2, taking DAU to a planned 2.9 million.
Tiers. Tier 1, login, purchase validation and player saves: 99.9% a month, multi-zone, recovery point 5 minutes, recovery time 1 hour from backups. Tier 2, leaderboards and live events: 99.5%, degrade to cached results. Tier 3, analytics: 24-hour delay acceptable. No second region: no journey’s outage cost pays for one, and no market requires one (counsel, checked 2 November 2026).
Decisions. One provider, one region, managed services by default. Move from the self-run cluster to the provider’s managed container service by Q3 (reversible). Every launch has a load test at three times forecast peak as a gate.
Cost. Target $120 per 1,000 DAU by Q4. At 2.9 million DAU that is $4.18 million a year against $5.19 million at today’s unit cost. Levers (illustrative): sample non-revenue events 1 in 10 and keep 13 months, about $0.6 million; a one-year commitment at the $0.9 million compute floor, about $0.23 million at a 25% discount; non-production off at night and weekends, about $0.2 million. Together about $1.0 million, the gap to the target.
Exit. Player data in a Postgres-compatible managed database, exported nightly to storage outside the provider, restore timed twice a year.
Asks. Platform’s Q1–Q2 roadmap; no new hires. Review: if unit cost is above $135 in Q3, revisit.
Now you
You are Head of Infrastructure at Spinel, a fictional cross-border remittance company: 650 people, 200 engineers, 1.8 million transfers a month to 22 receiving countries, $210 million revenue. You run 30 engineers in Platform and SRE. Cloud is $9.6 million a year on one provider, in one European region with three zones, plus a second region that holds backups only. Unit cost rose from $400 to $444 per thousand transfers. A one-year commitment of $3.6 million, covering 60% of compute, expires in five months. Last quarter a database degradation in the primary region stopped the send flow for 2 hours 50 minutes. Complications: Spinel is licensed to start payouts in a new receiving market next year, and the licence conditions as summarised by your compliance team require that market’s transaction records to be held in-country, where your provider has no region. Lemlem, Head of Payments Engineering, wants tier 1 to include the cash-pickup partner integrations. Write the infrastructure strategy memo for the next two years for Ragnhild, the CTO. Treat the residency condition as unconfirmed until you have the licence text.
Self-check
You are Head of Infrastructure at Spinel, a cross-border remittance company: 650 people, 200 engineers, 1.8 million transfers a month, cloud bill $9.6M a year on one provider. Last quarter a managed-database degradation in the provider's primary region stopped the send flow for 2 hours 50 minutes on a Friday evening: about 9,000 transfers failed or were delayed, 1,400 complaints, and an incident report to a regulator. Tier 1 (quote and pay-in, sanctions screening, ledger, payout dispatch) costs $2.8M a year and runs in three zones of one region; the second region holds backups only. Divya, the Chief Risk Officer, has told the board risk committee that dependence on one provider is now a top-five risk. Ragnhild, the CTO, asks for your recommendation to the committee.
- POST Don't get locked up into avoiding lock-in Gregor Hohpe, 2019
Lock-in as switching cost times likelihood, its eight kinds, and why avoiding it costs complexity. The model to put in front of a risk committee before it asks for a second cloud.
- BOOK Cloud Strategy: A Decision-based Approach to Successful Cloud Migration Gregor Hohpe
A whole book on the decisions this chapter lists, written for the person who has to explain them upwards. Read the multi-cloud chapter before writing your provider position. Read: The chapters 'Multicloud: You've Got Options' and 'Cloud Savings Have To Be Earned'.
- POST Multi-Cloud is the Worst Practice Corey Quinn, 2020
The case for one provider by default, from a consultant who reads cloud bills for a living, with the exceptions he accepts. Read it as the default your memo has to argue away from.
- POST The Cost of Cloud, a Trillion Dollar Paradox Sarah Wang and Martin Casado, 2021
Why cloud spend is a gross-margin question, and why repatriation is a decision for particular workloads, not the whole estate. Read the recommendations section beside your unit-cost trend.
- DOC Disaster recovery options in the cloud Amazon Web Services
Backup and restore, pilot light, warm standby and multi-site active/active, in order of cost and complexity. The provider is AWS, but the patterns hold elsewhere. Read the cost and complexity notes before you fill in your price list.
- DOC SS2/21 Outsourcing and third party risk management Prudential Regulation Authority, 2021
How one prudential regulator frames cloud resilience: stressed and planned exits, a list of resiliency options with no hierarchy among them. Check which version is in force before you cite it.
- DOC Summary of the Amazon DynamoDB Service Disruption in the Northern Virginia (US-EAST-1) Region Amazon Web Services, 2025
A provider's own account of a regional failure that spread to services built on the failing one. Read it for the dependency chain, then list your own tier-1 dependencies on global and single-region services.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.