Leading a network outage

Put the deadline and the repair side by side, treat the last change as the first suspect, prepare three levers (roll back, route around, wait) and set a decision time for each, give the vendor one owner and a deadline, and tell customers what they need to do and when you will next speak

45 MINNETWORK ENGINEERUPDATED 2026-11-21
PREDICT

Payouts over two private bank links began failing at 03:05. The routers at the Ferrowave end were upgraded between 01:30 and 02:10, and every post-check passed. It is 03:35. What is the strongest first move for the network lead?

At lead level you are no longer the engineer who finds the fault. You are the person the incident commander turns to for one question: what is the network doing, and what can we safely do to it? The method of finding a fault from evidence is in troubleshooting a live fault, and this chapter assumes it. How a company declares an incident, sets severity and runs a commander rota is in incident management. The technical lead’s seat in a large incident is in leading a sev-1. The manager’s side, staffing the response and protecting the rota, is in on-call and incidents for managers. The shape of the response and the postmortem are in incidents and postmortems. What is left is the network angle: the change history, the levers you can pull on the network, the outside parties, and the words customers read.

The model: two clocks and one suspect

An outage has two clocks. The first is the business’s: when does the harm become certain? The second is the repair’s: how long does each way of fixing it take? Engineers tend to watch only the second. The lead’s work is to compute the first, write it where everyone can see it, and make decisions against it.

Ferrowave’s clocks on the 25th look like this. The figures are illustrative, except the cast facts of the payouts run.

Fact Value What it tells you
Due at 06:00 on the 25th 31 batches, about 9,400 payouts The size of the harm
Executor speed about 3.5 payouts a second, so 9,400 take 44.8 minutes The run needs about 45 minutes of working links
Customers’ promise to staff paid by 07:00 The real deadline, not 06:00
Latest healthy start 06:15 07:00 minus 44.8 minutes
Payouts to the two failing banks, A and B about 3,600 (38% of 9,400) The part of the run at risk
Roll back the routers about 20 minutes a router, standby first About 45 minutes for the pair, with a test in the middle
Divert through partner bank C 15 minutes to set up; C’s ceiling is 1.2 payouts a second, so 3,600 take 50 minutes The diverted lane must start by 06:10

The second half of the model is the suspect. In most network outages the most useful fact is that something changed recently. Nothing else on the table explains why a fault began at 03:05 on a link that worked at 00:30. The suspect is not a verdict, and you stay open to the banks, the carrier and the load. But you work from the change first, because it is the cheapest thing to test and the cheapest thing to undo.

Start with what changed

Before you open a capture, read the change record: what was changed, on which devices, when it finished, who did it and what the post-checks tested. At Ferrowave, Platform and Security runs a pair of routers in a colocation facility in Lagos, where the private links to four partner banks end. The upgrade ran in the usual 01:00 to 03:00 window on the 25th. The standby router was upgraded first, traffic failed over to it, and then the other router was upgraded. By 02:10 both tunnels and both routing sessions were up, and a 64-byte test message to each bank passed.

The links were up. They were not working. This is the hardest class of network fault, because the dashboards are green and the first instinct is to look elsewhere. Njambi’s first test was to find the largest packet that crosses each link with the don’t-fragment flag set, and to compare it with the figure from the monthly test. On 24 June the largest payload that passed was 1,380 bytes. After the upgrade it was 480. A payout message is several kilobytes, so its packets were dropped, while pings and small test messages passed. That one comparison moved the suspect from “something about the banks” to “the new release on these two links”. The method of splitting a path and comparing a working case with a failing one is in the chapter on live faults.

The record also exposes the weakness in the change. The post-checks proved the links were up. They did not send a message the size of a payout. Changes, windows and rollbacks covers writing post-checks that test the thing the business uses. The lesson for the outage is smaller: when someone says the change passed its checks, ask what the checks sent.

The three levers: roll back, route around, wait

A lead has three levers in a network outage, and each has a time, a risk and a circumstance in which it is right.

Lever Time to take effect What it risks Right when
Roll back the change About 20 minutes a router at Ferrowave, so about 45 minutes for the pair Halves router capacity during each step; the old version might share the fault The change is the only recent difference and your own history shows the old version worked
Route around the fault 15 minutes to set up, then the third bank’s ceiling sets the speed Higher cost per payout, a lower ceiling (1.2 a second), and the broken links stay broken The fix cannot finish before the latest start, or you cannot trust it
Wait for the vendor Unknown: it is their clock Nothing improves while you wait Only for what you cannot do yourself, such as a missing image or a fix to the vendor’s own service

Notice what is not on the list: diagnosing for longer. Diagnosis continues, but it is not a lever, because it does not change the outcome by 06:00.

Prefer the lever you prepared. A rollback is in the change plan, with its steps and its test. Ferrowave’s previous release had run on this pair for 211 days without this fault. That is your own history, and it is better evidence about your own network than a vendor’s guess about every customer’s. A rollback that nobody has rehearsed is a different decision, and it needs a calmer hour than 04:00.

Roll back in an order that gives you a test. Njambi rolls back the standby router first, while the other carries traffic. After about 20 minutes she can send full-size messages through the rolled-back router. If they pass, she fails over to it and rolls back the second. If they fail, the rollback has not fixed it, and she learned that at 04:35 instead of 05:00.

Set a decision time for each lever. Take the latest healthy start for the work, subtract the lever’s duration and setup, then subtract a margin. For the diverted lane: 07:00 minus 50 minutes is 06:10; minus 15 minutes of setup is 05:55; minus a 25-minute margin is 05:30. So 05:30 is the hard checkpoint. If full-size messages do not cross the links by then, the diversion starts, whatever the vendor is saying. A decision made by the clock protects you from the pull to wait for one more test.

Treat waiting as a plan only with a date. “The vendor will patch it” is not a plan until they give a date you can compute against. Here the vendor gave none.

Rolling back and routing around without paying twice

An outage that moves money has a second danger: your repair can pay people twice. Diverting payouts to bank C is a change to where payments go, made in the dark, with some payouts already half sent. Ferrowave’s rule, which Sanne holds as Bank Connectors’ engineer, has three parts.

First, a diverted payout keeps its original idempotency key and reference. A new reference makes a new payout, and the employee is paid twice. This is the lesson of an earlier Ferrowave retry that paid some payouts twice, told in payments incidents, and of the idempotency lesson.

Second, payouts left in a sending state at bank A or B are requeried before anything is resent. The overnight failures, 38 payouts from 5 customers between 03:05 and 04:38, are requeried one by one after the fix.

Third, customers do not resubmit. Resubmitting a batch creates a new batch. The customer update has to say so in plain words, and it has to say it before the first customer reaches for the button.

The network lead does not own these rules, but must ask about them before a diversion, because the person who owns the routers is the one who flips the route.

The vendor and the carrier

Outside parties are levers you do not control, and the way to use them is to give each one a single owner and a clear request.

One owner per party. Njambi owns the router vendor. Sanne owns the partner banks. If the carrier were involved, a third person would own that call. The owner keeps the case number, the names and the times, and nobody else phones. Calls from four people to one support desk reset the case and produce four stories.

Open at the highest severity at once. A case raised at 03:58 reaches an engineer; a case raised at 09:00 joins a queue. Open it while you work, since the vendor’s answer is useful even if you act before it arrives. Providers, circuits and vendors covers the contract side, support levels and escalation paths.

Ask four questions. Is this a known defect, and what is its ID? Which versions and hardware revisions does it affect? Is our previous version affected? Is there a workaround? In Njambi’s case the vendor engineer, at 04:06, said it matched a known defect in handling certain packets inside tunnels, that the fix was in a later maintenance release with no date, and that the previous release was not known to be affected. Two of those answers helped. The missing date told her the vendor’s clock was not a plan.

Tell them your deadline. “Payroll runs at 06:00, so I will decide by 04:10 and act whatever you say” sets the terms. A vendor who knows your deadline may offer a workaround, and one who does not may say they will revert in four hours.

Write times in both zones. The vendor’s case stamps are in UTC, and Lagos is UTC+1 all year. When you assemble the timeline afterwards, a case entry at 03:06 UTC is 04:06 in your chat. Convert as you go, or the timeline will contradict itself.

Running the network side of the room

The commander runs the incident and you run the network. Four habits matter at 04:00.

One change at a time, announced first. Say aloud what you are about to do, on which router, and what you expect. Nothing else touches the network while you do it, which is the rule from leading a sev-1 applied to routers.

Capture before you change. Before the rollback, Njambi saves five minutes of evidence: the version, the size test, the logs, a capture on one tunnel. The vendor needs them, and so does the postmortem. The capture is a few minutes and the rollback does not suffer for it.

Keep your own way in. Work from the out-of-band console path when you reload a router, so that a bad step does not cut off the engineer who has to fix it.

Say what you know and what you do not. In your updates to the commander, separate three things: tested and true, believed, and unknown. “Large packets fail on both links, tested at 03:55” is tested. “The upgrade caused it” is believed until the rollback passes the same test.

What payroll customers need to hear

The commander approves what customers read, and a customer success manager usually writes it. Your part is to supply facts that are true and tested, in a form the writer can use. A good update to payroll customers has four parts.

  • What is affected. Payouts to accounts at two of Ferrowave’s partner banks, since 03:05. Say what it is, not how it works. A customer does not need the word tunnel.
  • What we are doing. One sentence: we have found the cause, a change to our network equipment, and are reversing it.
  • What you should do. For most customers: nothing. Do not resubmit a batch; a scheduled batch stays scheduled. Customers can cancel until 30 minutes before the schedule, so for a 06:00 batch the cut-off is 05:30, and an update sent at 04:30 should say so.
  • When we will next write. A time, kept whether or not there is news.

Two rules protect your credibility. Never promise a time you have not tested. “Resolved by 05:00” is a promise the rollback has not earned, while “we expect to confirm by 05:30” is one you can keep. And never put the vendor’s estimate in the update as if it were yours. Customers do not care that a vendor is slow; they care whether their staff are paid. Ferrowave has 210 customers, 41 of them on scheduled payouts, 31 of those on the 25th, so the 31 get the update first and the 5 whose overnight payouts failed get a separate note. The customer-facing practice as a discipline gets its own treatment in communicating during incidents, which is planned for the customer track.

After the outage

The timeline is the foundation of everything afterwards, and it is cheapest to build while you work. Keep one running document with a time in a single zone, a source for each line and a name for each action. Rebuilding it from chat the next day takes longer and is wrong more often. Then the actions, which at Ferrowave were these.

  • Post-checks that send a real-size message to every bank before a network change window closes. Owner: Njambi, due before the next change.
  • A calendar rule. No planned network change in the 48 hours before the 25th or the last working day, unless it is urgent. The January freeze on Payouts Core’s deploys did not cover the routers, and the change calendar should carry the business’s peaks.
  • A commit-confirm style rollback where the platform supports one, so that a change that cuts connectivity reverts itself. Cloudflare listed an automated rollback of this kind among the actions after its June 2022 outage, which is in the reading.
  • A vendor action. Track the defect ID and the fix date, and keep the pair on the previous release until a patch is tested in the lab.

The review itself follows incident management. Keep it blameless: the engineer who ran the upgrade followed the plan, and the plan lacked a test.

Where practitioners disagree

Roll back first or diagnose first. Some leads roll back at once, because the change is the suspect and a known-good state is worth more than a theory. Others want to understand the fault first, in case the rollback hides it. The position here is to capture five minutes of evidence and then roll back, unless the evidence points away from the change.

Change before a peak or never. Some teams ban network changes near paydays. Others point out that a payments company has a peak every month, so a ban leaves no window. A calendar rule with an exception route, as above, is the usual compromise.

Vendor on the bridge or off it. Having the vendor engineer on the call gives you instant answers and risks handing them the steering. Many leads keep the vendor on a separate line with one owner who relays, so that the room hears facts and not opinions.

Divert early or hold. A standing diversion costs money and may break contracts’ volume terms, so some hold it until the checkpoint. Others divert at once and roll back behind it. The decision time exists to settle it by arithmetic.

Day to day

At lead level the work that matters most happens when nothing is on fire.

Every week. Read the change calendar against the business calendar. At Ferrowave that means the 25th and the last working day, the 41 customers on scheduled payouts and any planned maintenance by a carrier or bank. Move or add checks for anything that lands near a peak.

Every month. Run the baseline tests that make an outage diagnosable: the largest packet that crosses each link, the throughput of the third-bank lane at its ceiling, and the failover of the router pair. Keep the numbers where the on-call can find them.

Every quarter. Rehearse one rollback in the lab or in a quiet window, with someone other than the author following the plan. Read the vendor’s support contract and check the escalation numbers still reach a person.

When an outage starts. Write the clocks first. Read the change record. Name the suspect. Take your evidence. Set the decision times. Open the vendor case, and say who owns it.

When it ends. Hand the timeline to the person who runs the review, send the final customer update, and write down who owes what by when. Sleep before you write the postmortem.

On the rota. Outages at 03:05 land on whoever is on call. The rota is a manager’s concern, and the manager’s chapter covers load and fairness; your part is to make sure the network runbook is good enough for the person who is not you.

Ferrowave’s other bad night, a stalled executor on 25 March, is told from the builder’s side in on call for what you built. It is a different fault in a different month, and its lesson, to bound the harm before hunting the cause, applies here too.

BY ORG SIZE
STARTUPunder 30 people

Under 30 people, nobody is a network lead. The network is one office router and the cloud provider’s, and an outage means the provider’s status page and a call to the person who set the router up. Leading it means deciding whether to wait for the provider or work around it, for example by tethering a laptop to a phone. Two things help most. Keep the router’s login and the provider’s support number where a colleague can find them at night. And know the one thing the business cannot live without for a day, so you know what to protect first.

SCALE-UP30 to 300

This is Ferrowave’s size: 140 people, the routers run by a platform team, one person who knows them well and no round-the-clock network cover. The network lead is paged by the product on call and becomes the technical lead of an incident by default. The work is to turn what is in one head into a rollback in the change plan, a baseline of tests, a named owner for the vendor and a calendar that knows the business’s peaks. An outage here is decided by the preparation of the previous quarter.

ENTERPRISE300 and up

At 300 people and up there is a network team, an operations centre and a major-incident manager. The network lead rarely commands. Your skill is the briefing: the change record, the clocks, the tested and believed facts and the recommendation, given in a minute to a commander who does not know the network. The politics are about ownership of shared links and of the vendor relationship, so agree beforehand who calls the carrier, who may roll back and who tells the business.

ARTEFACT An incident timeline and a customer update ~45 MIN
YOU PRODUCEA one-page incident timeline with the clocks, the decisions and the evidence, and a customer update that a payroll customer could act on

Template

# Incident timeline: <short title>
Date · Written by · All times in <zone>; vendor times converted

## The clocks
- Deadline for the business: <time, and what depends on it>
- Work to be done and its speed: <count, rate, duration>
- Latest healthy start: <deadline minus duration>
- Levers: <name, time to take effect, setup, latest start, decision time>

## Timeline
| Time | Source | What happened or was decided | Who |
|---|---|---|---|

## Decisions
| Time | Lever chosen | Evidence | Rejected, and why |
|---|---|---|---|

## Tested, believed, unknown
- Tested:
- Believed:
- Unknown, and who will close it:

## Customer update (<time sent>)
**What is affected:**
**What we are doing:**
**What you should do:**
**Next update:** <time, kept whether or not there is news>
WORKED EXAMPLE

Ferrowave, Friday 25 June 2027, as Njambi writes it up that morning. The incident started with an upgrade of the router pair and failed payouts to two partner banks, A and B. The commander approved the update below at 04:28.

# Incident timeline: payouts to two banks failing after router upgrade
Friday 25 June 2027 · Njambi · times in WAT (UTC+1); vendor times converted

## The clocks
- Deadline: staff paid by 07:00 for 31 batches, about 9,400 payouts, due 06:00.
- Run speed: 3.5 a second, so 44.8 minutes. Latest healthy start 06:15.
- Rollback: 20 minutes a router, standby first, about 45 minutes in all.
- Diversion to bank C: 15 minutes setup, 1.2 a second, so 3,600 payouts take 50 minutes. Latest start 06:10; checkpoint 05:30.

## Timeline
| Time | Source | What happened or was decided | Who |
|---|---|---|---|
| 01:30-02:10 | Change record | Router pair upgraded; 64-byte test messages passed | Platform and Security |
| 03:05 | Executor log | First full-size payout to bank A or B times out | |
| 03:18 | Alert | Five failures in 12 minutes to A and B | |
| 03:32 | Chat | Incident declared | Sanne |
| 03:55 | Router test | Largest packet that passes: 480 bytes, was 1,380 on 24 June | Njambi |
| 03:58 | Vendor case | Opened at highest severity | Njambi |
| 04:06 | Vendor (03:06 UTC) | Known defect, no fix date, previous release not known to be affected | Vendor |
| 04:10 | Call | Decision: roll back standby first, vendor stays on, bank C readied | Commander |
| 04:35 | Router test | Rolled-back standby passes full-size messages | Njambi |
| 04:38 | Change log | Traffic moved to standby | Njambi |
| 05:00 | Change log | Second router rolled back | Njambi |

## Decisions
| Time | Lever | Evidence | Rejected, and why |
|---|---|---|---|
| 04:10 | Roll back, vendor call in parallel | Size test; 211 days on the old release | Wait: no date. Divert alone: costlier, 1.2 a second, links stay broken |

## Tested, believed, unknown
- Tested: large packets fail on both links; the rolled-back standby passes.
- Believed: the new release caused it.
- Unknown: whether the patch fixes it; vendor to say.

## Customer update (04:30)
**What is affected:** payouts to accounts at two of our partner banks have failed since 03:05.
**What we are doing:** we found the cause, a change to our network equipment, and are reversing it.
**What you should do:** nothing. Do not resubmit your batch: it stays scheduled for 06:00. You can still cancel it until 05:30.
**Next update:** 05:30.

Check the sums: 9,400 divided by 3.5 is 2,686 seconds, 44.8 minutes, so 07:00 minus 44.8 minutes is about 06:15. For the diversion, 3,600 divided by 1.2 is 3,000 seconds, 50 minutes; 07:00 minus 50 minutes is 06:10, minus 15 minutes of setup is 05:55, minus a 25-minute margin is 05:30. The vendor’s 03:06 UTC is 04:06 in Lagos. The update promises a next update, not a fix time. It names no bank, no vendor and no estimate it cannot keep, and it tells the 31 customers with scheduled batches the one thing they might otherwise do wrongly: resubmit. The five customers whose overnight payouts failed get a separate note from the customer success manager, with the 38 payouts listed and the promise that each will be requeried, not resent.

Now you

You are Njambi, three months later: Thursday 30 September 2027, the last working day of the month. Ten customers have scheduled batches, about 3,000 payouts, due at 06:00; the executor needs about 14 minutes for them at 3.5 a second. About 900 of the payouts go to accounts at partner bank D. Your log, in mixed zones: 04:41 WAT, alert, link to bank D down. 03:52 UTC, you open a fault with the circuit provider. 04:10 UTC, the provider says a fibre cut and a repair of 4 to 8 hours. 05:20 WAT, bank D’s operations desk says it can enable the backup internet tunnel by 05:50. The backup was tested on 14 September at 0.8 payouts a second. Customers can cancel until 05:30, and staff must be paid by 07:00. Three of the ten customers have payouts to bank D. Write the timeline, the clocks and the update to the three customers, sent at 05:25. Decide which of the figures you may promise.

Self-check

DECIDE

It is 04:10 on Friday 25 June 2027 at Ferrowave. Payouts to accounts at banks A and B, about 3,600 of the 9,400 due at 06:00, are failing because large packets are dropped on the two private links since the router upgrade. Njambi has a size test, 211 days of the old release without this fault, and a vendor engineer saying it is a known defect with no fix date. Rolling back takes about 45 minutes for the pair, standby first. A diversion through bank C takes 15 minutes to set up and 50 minutes to run at its 1.2 a second ceiling, so it must start by 06:10. Staff are promised pay by 07:00. What does the network lead recommend?

READING
  1. DOC
    Managing Incidents Google, in Site Reliability Engineering, 2016

    Chapter 14 of the SRE book, on the roles and the habits of a managed incident. Read it for why one person should hold the coordination while others work on the system, then compare the technical lead's seat in this chapter.

  2. DOC
    Incident Response Google, in The Site Reliability Workbook

    The workbook's chapter on incident response, with worked cases of roles and handoffs. Read it for how the same ideas are applied in practice, after you have read the book chapter.

  3. DOC
    Customer Liaison PagerDuty, incident response documentation

    PagerDuty's public training page on the role that tells customers what is happening. Read it for how a liaison drafts updates and passes the incident commander's approval, which is the route a Ferrowave update takes.

  4. POST
    Cloudflare outage on June 21, 2022 Cloudflare, 2022

    A published postmortem of a network configuration change that took a large share of traffic offline. Read the timeline and the follow-up actions, which include staggered rollouts and an automated commit-confirm style rollback.

  5. BOOK
    The Practice of System and Network Administration, 3rd edition, Volume 1 Thomas A. Limoncelli, Christina J. Hogan and Strata R. Chalup, 2016

    The standard general text for the job. Read the debugging and incident chapters for a systematic method, then compare them with how your own team handles a fault under a deadline. Read: The chapters on debugging and on handling an incident report; check the contents page for the numbers.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.

RECALL CARDS Tap to flip. They join your review deck when you mark the lesson complete.
NEXT: AI in network operations: what to hand over →