Design reviews for a new site or region
How to review a new city hub or cloud region before anything is ordered: ask what must keep working, check the addresses, the failure domains and the capacity with numbers, and end in a decision with conditions, owners and dates
A colleague proposes a second cloud region for a company's dispatch system and asks you to review the network design. Which question is most likely to change the design?
By the time you review designs for a living, you rarely draw the network yourself. A practitioner brings you a proposal: a tenth city, a second region, a new factory, an acquisition. Your job is to decide whether the network can take it, and to decide in a way that other teams can rely on. This chapter is about that job at the level of the whole network, not one change. The documents it relies on are taught elsewhere in the track: the addressing plan, the change plan and rollback, the capacity report, the diagram and runbook and the circuit order. The review is where you check that they exist and agree with each other.
What the review is, and what it is not
A design review for a new site or region is a short meeting built on a written proposal. It settles the choices that are hard to reverse while they are still cheap. In a network those choices are few and they are the same every time: which address block the new place gets, what it shares with the existing network when something fails, who owns each link, and what the business has said must keep working.
It is not a change review. The change review on a Monday afternoon asks whether this window and this rollback are safe. The design review asks, weeks or months earlier, whether this shape is one the network should take at all. A bad design approved at the design review will pass every change review after it, because each change will be done correctly.
It is also not the owner of the policy or the money. The general craft of running a review, with triggers, entry criteria and four outcomes, belongs to architecture reviews and governance, and the recovery numbers that drive a region belong to disaster recovery and continuity. This chapter takes your angle: what a network reviewer checks, in what order, and what a network proposal must contain before it is worth a meeting.
Six questions the review must answer
Every proposal for a new site or region gets the same six questions. Writing them down is what stops the review from being whoever shouts loudest, or whoever asked last.
| Question | What a good answer looks like | Where it is taught |
|---|---|---|
| 1. What must keep working, and who said so? | A number from the service owner: how long it may be down and how much data it may lose, per service | Disaster recovery |
| 2. Which addresses, and do they collide? | A block from the plan, checked against every network it will ever connect to, including partners | An addressing plan |
| 3. What does it share with the rest? | The failure domains drawn: what fails together, and what does not | Network philosophies |
| 4. What will the links carry, now and after a failure? | A forecast with a range, and the load on the surviving path | Monitoring and capacity |
| 5. Who may talk to whom? | A rule set kept small, with an owner for each rule | Firewall rules and cloud security |
| 6. Who runs it at 3 am? | Named owners, a diagram, a runbook, monitoring, and a place on the rota | Diagrams and documentation |
Two more things sit under the six: what it costs, and when it is needed. A design that is right but needs a circuit that takes six weeks to deliver, for a site opening in four, is a design with a missing date.
What must keep working
Start here, because everything else depends on it. A region or a site is built to survive something, or to serve someone. If the proposal says “for resilience” and nothing more, it has not yet got a requirement. Resilience against what? A cloud region being unreachable for an hour? A cut fibre into a city? A mistaken change that takes out the core?
The honest answer comes from the owner of each service, as two numbers: how long it may be down (a recovery time objective) and how much recent data it may lose (a recovery point objective). The network engineer does not set them. You ask for them, and you write the design so that they can be met. When the owners have not set them, that is a finding, and it is often the most useful finding of the review.
Addresses
The cheapest mistake to avoid and the most expensive to fix. Check the proposed block against the whole plan, and against networks you do not control: a partner’s, a processor’s, an acquired company’s. Private addresses defined in RFC 1918 are reused everywhere, so a clash with a partner is likely, not rare. Check also that the block leaves room: a site that fills its block in two years needs renumbering, and renumbering is a project. The method is in the addressing plan; the review checks that the plan was used.
What it shares
Draw the failure domains, as in network philosophies: the set of things that fail together. A new region is a chance to build a new domain, or to quietly merge two into one. If you stretch the existing network across both regions, a mistake in routing in one region now reaches the other. That may be acceptable. It must be a decision, not a side effect.
Capacity after a failure
The normal-day load tells you little. Ask what the load is on the surviving path when the worst single failure happens. A pair of links at 40% each is at 80% when one fails, and the proposal to add a site must say what that becomes. The method for forecasts is in monitoring and capacity; the review asks for the failure case.
Access
A new site or region needs rules, and the first set tends to be wide because nobody knows yet what is needed. Ask for the smallest set that works, each with an owner, and a date to review the rest. Wide rules written in a hurry are the ones that a review of firewall rules later has to remove.
Running it
A network nobody on the rota can explain is a network whose owner is whoever built it. Ask for the diagram at the level the on-call needs, the runbook, the monitoring, and the answer to a plain question: with this added, who is paged, and can they fix it?
Three shapes for a new region
When the new thing is a cloud region, or a site with its own network, the proposal chooses one of three shapes. They are not new, and the choice is not technical alone. It is about how large you want the failure domain to be and how much work you want to run.
| Shape | What it is | What it buys | What it costs | Right when |
|---|---|---|---|---|
| Stretch | The existing network is extended, with one address plan and one set of routes over both places | Least to build; services reach each other with nothing changed | One failure domain: a bad route or rule in one place reaches the other | The two places are close, one team runs both, and they will never need to be apart |
| Apart | The new network is built on its own, with its own block, rules and links, and no link to the old | Smallest failure domains; a mistake in one is invisible to the other | Anything that must cross needs a deliberate path, and data cannot move freely | The new place hosts something independent, or data must not cross |
| Apart, with a shared transit | Each network stays its own, and both join a small shared network that carries the traffic that must cross | Domains stay separate; the crossing is one place you can control and watch | The transit is a new thing to run, and a new failure domain, which then needs its own care | You expect several regions, and you have the numbers to say what must cross |
Cloud providers describe this last shape as hub and spoke. The Azure Architecture Center’s reference for it describes a central hub network that connects to many spoke networks and holds shared services, and describes peering connections as non-transitive: traffic does not pass from one spoke to another through the hub unless you add a routed device there, or peer the two spokes directly. Other providers have their own names and limits for the same idea. Read the documents for the cloud you use, and treat the limits as part of the design.
The shared transit is the shape that sounds most mature and is most often built too early. It is a good answer when you know what has to cross. It is a poor one when it is chosen because the proposal could not say. Choose the smallest shape that meets the requirement, and write down what would make you move to the next.
What to settle now and what to leave
Not everything needs deciding at the review. The skill is telling the choices that are hard to undo from the ones that are not.
Hard to undo, settle now. The address block, because every rule and route will refer to it. The ownership of each link and each seam between teams. The shape: stretch, apart, or transit. Which services will cross between the places, and which must work without the crossing.
Easy to change, leave open. The capacity of a link, which a provider can raise. The number of rules, which a review can trim. The exact monitoring thresholds. The second path to a hub, if the first is sound and there is a stated trigger for ordering it.
The edge between the two is the seam between teams. At Ojaline, the network team of four owns the cloud networks and the links to the hubs, and the platform teams own the services that run in each region. A link from a new region to a hub sits on that seam. If the review does not name one owner for it, the first fault will be an argument about whose it is. Name the owner, in the record, before the link exists.
Writing the review and its decision
The document a network reviewer asks for has a fixed shape, and you should ask for it before the meeting, as a pre-read at least two days ahead. It has the purpose and date, the requirement with its numbers and who gave them, the options with what each costs, the six answers, the open questions, and a recommendation. If it cannot be written, the proposal is not ready, and you can say so at the door instead of in the room.
The review then ends in one of four outcomes, as in the staff chapter: approved, approved with conditions that each have an owner and a date, not yet with the gap named, or escalated because the answer needs money or a policy someone else owns. The two most often forgotten are “not yet” and “escalated”. A review that can only say yes or no teaches proposers to hide the gaps. “Not yet” tells them what to bring back.
Record the decision in a short record kept with the design, as Michael Nygard proposed for architecture decisions: the context, the decision and its consequences, in a page. A year later, when the tenth hub is the eleventh and someone asks why the transit was not built, the record is the answer.
Where practitioners disagree
Build for the network you have, or the one you will have. One camp builds the region with a transit because retrofitting one is painful. The other builds the smaller thing and writes down the trigger. Both are right in some circumstances. The test is whether the extra shape pays for itself in a number you can state, not whether it feels mature.
A gate or an advisory review. Some companies make a network review a gate: nothing is ordered without it. Others offer it as advice. A gate protects the network and lengthens the queue; teams that find it slow will bypass it. A sound compromise is a gate for the hard-to-undo choices only, and a light path for everything else.
Test the region before the business needs it. A second region that has never carried real traffic is a hope. Some teams insist on a regular failover exercise with the owners of the services; others consider it too costly for the risk. The disaster recovery chapter argues for exercises. Raise the point at the review, because a region approved without a plan to prove it works has bought the cost and not the safety.
Day to day
At Lead level, a Senior Network Engineer or Network Architect, the review is a cadence more than an event.
Weekly. Triage the proposals that have arrived. Apply the entry check: does the document answer the six questions? Send back what does not, with the missing items named. Most of the work is here, and it is where you save the meeting.
Before each review. Read the pre-read, check the addresses against the plan yourself, redraw the failure domains on one diagram, and work out the failure-case load from the capacity data. Ten minutes with the real numbers is worth more than an hour of opinions.
In the review. Forty-five minutes. The proposer states the requirement and recommendation in five minutes; the reviewers ask the six questions; you write the outcome and conditions as you go and read them back before people leave.
After. Put the conditions in a tracker with owners and dates. Check them. A condition that nobody checks is a wish.
Monthly. Look at the address plan: how many blocks are used and how many are left. Run the overlap check against the partner networks you know about.
Each quarter. Look back at decisions of a year ago and ask whether the numbers held. If the forecast was wrong, ask why, and change how you ask. Run or join a failover exercise with the SRE team if the company has one.
Each year. Review the standing choices: whether the shape you chose is still the smallest that meets the requirements, and whether the triggers you wrote have fired.
There is no review, because there is no network team. A new office or a second cloud account is set up by whoever knows most. Do the useful part anyway, in half an hour: write down what must keep working, pick the address block before you touch the router, and check it does not clash with the office or the cloud. A one-page note beats a meeting. The risk is the shortcut you cannot undo, such as two networks created with the same private block that later need to talk.
The network team is a few people, and a review is the first place the company hears that the network has limits. Keep it light: a pre-read, one meeting, a recorded decision. Name the seams, especially between the cloud team and whoever runs the sites. Build the address plan before the second region needs it, because renumbering later is a project. The danger is a review that depends on one senior engineer; write down the questions, so someone else can run it.
Several teams build networks at once, acquisitions bring their own addressing, and the review competes with a queue. The work is consistency: one proposal template, one place for the address plan, triggers that say which designs need the review and which take a light path. Politics enters through ownership: who funds the transit, who is paged for it, and who may say no to a region. Escalate those, with evidence, to the person who owns the money.
Template
# Design review: <site or region>
Author · Reviewers · Date · Decision needed by
## 1. What must keep working
Service | Owner | May be down for | May lose | Source of the figure
## 2. Options
Option | What it is | Cost | Right when
## 3. The six answers (for the recommended option)
Addresses: <block, checked against ..., overlaps found and resolved by ...>
Shared with the rest: <failure domains, drawn or listed>
Capacity: <normal peak; load after the worst single failure; arithmetic>
Access: <the smallest rule set, owners>
Running it: <owner of each link, diagram, runbook, monitoring, rota impact>
Date and cost: <lead times, order-by date, monthly cost>
## 4. Open questions
<What nobody has answered yet, and who must>
## 5. Recommendation and outcome
Approved / approved with conditions / not yet / escalated
Conditions: <condition · owner · date>
## 6. What would reopen this
<Dated or measurable triggers> WORKED EXAMPLE
Ojaline (1,400 staff, 300 engineers, nine city hubs, two of them core) proposes a tenth hub, opening in ten weeks, and a second cloud region. Edafe, a senior network engineer, wrote the review; Nadja, a senior engineer on the network team, reviewed it. All numbers are illustrative.
1. What must keep working. Two tier-1 services would run in the second region: dispatch routing and the nightly seller-wallet payout job (balances paid out by NIP), each with one owner. The proposal says only that they should recover “quickly”. Neither owner has set a recovery time or data-loss figure for losing a whole region. Finding: no requirement yet.
2. Options. Stretch the network over both regions: least work, one failure domain. Build the region apart: no shared faults, but dispatch could not reach its data. Build apart behind a shared transit: separate domains, one new thing to run and staff. Cost of the region: about ₦9 million a month for a warm standby of the two services, ₦16 million for a hot one: hot costs ₦84 million a year more (₦192 million against ₦108 million).
3. The six answers. Hub addresses: the nine hubs use nine /20 blocks in 10.16.0.0/16; the tenth takes 10.16.144.0/20, leaving six free. Region addresses: region one is 10.0.0.0/14, and the plan proposes 10.4.0.0/14 for region two, but the card processor’s link uses 10.4.8.0/24 on its side. Overlap: use 10.8.0.0/14 instead. Capacity: the two core hubs each have a 2 Gbit/s link to region one and peak at 0.8 Gbit/s, which is 40%. If one fails, the other carries 1.6 Gbit/s, which is 80%. The tenth hub adds about 0.15 Gbit/s: 1.75 Gbit/s, which is 87.5%. Running it: the network team of four owns the hub link; the new region link has no owner yet. The circuit for the hub has a six-week lead time, so it must be ordered by week 4.
4. Open questions. The recovery figures, from the two service owners.
5. Outcome. Tenth hub: approved with conditions. Address 10.16.144.0/20 recorded in the plan (Edafe, this week); circuit ordered by week 4 (head of infrastructure); capacity report on the 87.5% failure case to the next review (Nadja, three weeks). Second region: not yet. Bring the recovery figures from both owners and a costed choice between warm and hot; address block 10.8.0.0/14 reserved meanwhile.
6. What would reopen this. A recovery time under two hours; a second tier-1 service wanting the region; or a failure-case load above 90%.
Now you
You are the network lead at a 120-person Lagos insurer. It has a head office in Lagos and three branches, in Ibadan, Port Harcourt and Kano, plus one cloud region. Addresses: head office 10.100.0.0/16, Ibadan 10.101.0.0/16, Port Harcourt 10.102.0.0/16, Kano 10.103.0.0/16, cloud 10.110.0.0/16. The head of IT proposes a fourth branch in Abuja, opening in eight weeks, and a second cloud region as a recovery site for the claims system. The claims director has said claims may be down for at most four hours. The last restore test took six hours. The new branch would use 10.104.0.0/16. The proposer wants the recovery region to use 10.110.0.0/16 too, so that nothing is renumbered when it takes over. Head office has a 200 Mbit/s link to the cloud, peaking at 90 Mbit/s; Abuja would add about 12 Mbit/s. The circuit lead time is five weeks. You have two network engineers and no rota. Complication: replication between the regions needs both to be reachable at once. Write the review.
Self-check
Ojaline wants a tenth city hub in ten weeks and a second cloud region. Edafe's review finds the hub fits the existing design, though one core link would run at 87.5% after a failure. The region is for dispatch routing and the nightly seller-wallet payout job, but neither owner has set a recovery time. Region cost is ₦9 million a month warm or ₦16 million hot. A card processor's link overlaps the block proposed for the region. The network team is four people on a one-in-four rota. What do you recommend?
- BOOK Site Reliability Engineering, chapter 27: Reliable Product Launches at Scale Beyer, Jones, Petoff and Murphy (eds.), 2016
Describes how Google built a dedicated launch coordination team inside SRE and a checklist to qualify launches. Written for services, but the idea of a standing review with a checklist applies to a new site or region. Read: chapter 27; the sections on launch coordination and the launch checklist.
- BOOK Site Reliability Engineering, appendix E: Launch Coordination Checklist Beyer, Jones, Petoff and Murphy (eds.), 2016
The original checklist, reproduced. Read it to see how a good checklist asks questions that point to action items and further reading, then write your own for networks. Read: appendix E.
- POST Documenting Architecture Decisions Michael Nygard, 2011
The post that proposed keeping a short record of each significant decision. It is the model for the page that explains, a year later, why a region was built the way it was.
- DOC Hub-spoke network topology in Azure Microsoft Azure Architecture Center
A provider's own description of the shared-transit shape, with its limits on peering and routing. Use it to see what the pattern costs in one real cloud, and read your own provider's equivalent.
- DOC RFC 1918: Address Allocation for Private Internets Y. Rekhter, B. Moskowitz, D. Karrenberg, G. J. de Groot and E. Lear, 1996
The primary source for the private address blocks that every company reuses, and the reason a partner's network may collide with yours.
- BOOK The Practice of System and Network Administration, volume 1 (3rd edition) Thomas A. Limoncelli, Christina J. Hogan and Strata R. Chalup, 2016
The standard practical text on running networks and systems, including designing for operability and reviewing what you build. Read: the chapters on design and on operational practices; check the contents page of your edition for exact numbers.
All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.