Network strategy, budget and the board

How a head of network engineering writes a three-year strategy: price each exposure in naira, buy resilience where the loss is concentrated, set the budget against contract dates and lead times, and put one decision in front of the board

45 MINNETWORK ENGINEERUPDATED 2026-11-21
PREDICT

The CFO asks you, as head of network engineering, for a three-year network budget. Which document should you bring first?

A network strategy is the same kind of document as any engineering strategy, and you should write it the same way. Engineering strategy and planning teaches the kernel, which Rumelt calls a diagnosis, a guiding policy and coherent actions, and the annual cycle that turns it into money. Headcount, budget and cost teaches how finance reads a budget. Reliability and infrastructure strategy covers the company-wide bets: where it runs, what each tier of service gets, how it would leave a provider. This chapter does not repeat them. It teaches the network’s part: the decisions that are specific to circuits, sites and providers, and the arithmetic that lets you defend them to a CFO and a board.

What a network strategy decides

Most of a network’s long-term cost is fixed by a small number of choices that are slow to reverse, because circuits are bought on terms of years and take weeks to deliver. Those are the choices a strategy is for.

Decision What drives it The number you need
How many providers, and where they overlap The loss when one provider fails Minutes of provider-wide outage in your own log, and the cost of an hour
How much redundancy each site gets The share of the business that runs through the site Each site’s share of traffic or orders
How big the second path is What must keep working when the first fails Mbit/s of the essential traffic only
Capacity ahead of demand Growth against the lead time of an upgrade Order line and lead time, from monitoring and capacity
Who runs it The skills you have and the skills you can hire Cost of a managed service against the cost of the people
When workarounds end The risk of a temporary fix becoming permanent A date, written down

Three of the rows deserve a sentence each. The size of the second path is a policy, not a default. Kilnworth’s backup link is 50 Mbit/s against a 200 Mbit/s primary: a quarter of the capacity, enough if the policy is that only the essential traffic survives, and a surprise if nobody said so. Capacity is a lead-time problem. At Crustwell an upgrade of the Agbara link takes 12 weeks and costs ₦1.8 million a month more, which is ₦64.8 million over a 36-month term; that is a strategy-sized sum, so the decision to wait for 80% belongs in the plan and not in a ticket. And a workaround needs an end date. Crustwell’s second factory has reached head office over an address-translating internet VPN on a 500 Mbit/s line since the acquisition, and a leased circuit and a routed link are now coming. The strategy should say that the VPN is switched off on a named date. Without one, the temporary link is still carrying production in three years. The addressing side of that is in an addressing plan.

The diagnosis: exposures priced in naira

The diagnosis of a network strategy is a list of exposures. An exposure is a way the network can hurt the business, and you price it with three numbers.

Expected annual loss = events per year × hours per event × cost of an hour.

The first two come from your own evidence: the incident log, the provider’s monthly reports, and the circuit route maps that tell you which failures share a cause. Providers, circuits and vendors shows how to turn a service level into minutes: at 99.5%, a 30-day month allows 216 minutes of downtime, and the percentage hides the fact that one provider-wide fault can use the whole allowance in an afternoon. Separate the failure types, because they have different cures. A single circuit failing is handled by a second circuit from the same provider. A shared duct or a shared exchange takes out both circuits at once, and it needs a different route. A provider-wide fault takes out every circuit from that provider, and it needs a second provider.

The third number is the cost of an hour, and it is not yours. It is delayed deliveries, refunds, idle riders and support calls, and only finance can put a figure on it. Ivo, the finance partner for infrastructure at Ojaline, produces it, and Balarabe states it as Ivo’s. This matters politically as well as for accuracy. If the network team invents the hour cost, the whole case can be dismissed as inflated. If finance owns it, the argument moves to the arithmetic.

Three habits keep the number honest.

  • Say how small the sample is. Ojaline’s log has one provider-wide event and four shared-duct cuts in three years. That is enough to start and not enough to be precise. Present a range, and say what you will look at to tighten it.
  • Say where the decision flips. Work out the hour cost at which the answer changes. If the second provider pays back only above ₦29 million an hour and finance’s figure is ₦46 million, the decision is robust. If the two are close, the board should know the case is a judgement.
  • Split the loss by site. A network-wide figure cannot tell you where to spend. A site’s share of the loss, from its share of traffic or orders, can.

Loss in naira is not the only exposure worth listing. A regulator, a contract with a penalty clause or a reputational cost may matter more than the arithmetic, and the strategy should name it. But put the priced exposures first. They are the ones you can argue about with a number.

Guiding policies: where redundancy is bought

Redundancy is bought by the tier, as the reliability strategy chapter argues: the sites and services that carry the most loss get the most protection. For a network, that becomes a rule you can apply site by site. Rank the sites by their share of the loss. Price the protection for each: the extra circuit, its installation, the equipment. Then buy from the top while a site’s avoided loss exceeds its cost, and stop at the first site where it does not.

That is a marginal argument, and it is where strategies usually go wrong in one of two directions. Spreading the money evenly protects the quiet sites at the price of the busy ones. Buying everywhere because the first few sites paid back assumes the last site is as valuable as the first. The stopping point is also the policy’s most important sentence, because it is the thing you will be asked to defend: why nine sites and not four, or why four and not nine.

Two cautions apply to any second path.

It must fail separately. A second circuit on the same duct, the same building entrance or the same provider’s exchange adds cost and no protection. Put the route in writing in the order, as the providers chapter explains. Cloud providers publish the same advice for their own private links: separate connections on separate devices in more than one location is the top tier of AWS’s Direct Connect resiliency recommendations, and the availability target applies only when the customer meets the stated conditions.

It must be something the team can run. A second path adds route lines, alerts and failure modes. Ojaline’s static-route design from network philosophies has 28 route lines today and a revisit trigger at 60. A strategy that adds four circuits should say how many lines they add and whether that crosses the trigger. A resilient design the on-call cannot debug at 3 am is a new outage waiting for a trigger.

The options, and the money elsewhere

A strategy compares real alternatives, and one of them is always to spend nothing on this and put the money somewhere else. Four shapes cover most second-path decisions.

Option It protects against It costs you
A second provider at every site Provider-wide faults and shared ducts, everywhere The most money; the last sites cost more than they protect
A second provider at the busiest sites The same faults where the loss is concentrated A policy for the sites left out, and a review date
Broadband with SD-WAN as the second path Provider-wide faults, if the last mile differs Lower capacity and quality at peak, and a technology the team may not have run
No second path; spend on something else Nothing here The exposure stays; the money goes to a bigger risk

None is wrong everywhere. The first is right when the cost of an hour is high enough that even the quietest site pays back. The third is right when the essential traffic is small, the broadband in each city is independent of the circuit provider and the team has run it in production. The last is right when the priced exposure is small, or when another item is bigger: an upgrade of a core link that would run at 87.5% after a failure, as in the design review chapter, may protect more than a new circuit. Compare them in the same units, naira over the three years, and let the table decide.

The budget: contract dates, lead times and what leaves with the contract

A network budget is a calendar as much as a total. Three things set it.

Contract terms. Circuits are paid for monthly over a term, often 12, 24 or 36 months, and you owe the rest if you leave early. A three-year commitment to a single provider fixes the exposure in place and fixes the price. Put every renewal date, and the notice it requires, in the plan. A renewal is the moment you have most leverage. At Wrenpost, a second provider quoted ₦780,000 a month against ₦850,000 on the existing circuit, a difference of ₦840,000 a year, and a quote like that is worth getting even when you do not intend to move.

Lead times. A hub circuit takes about six weeks at Ojaline, and the budget year does not start when the order is placed. A circuit ordered in month 1 bills from month 3 or 4. Model the first year with the months you will really pay, not twelve.

One-off against monthly. Installation fees and appliances are one-off; circuits and licences are monthly. Finance reads them differently, and headcount, budget and cost explains how. Show them as separate lines so the board can see what continues after year one.

Hold part of the budget in reserve, released only when a stated condition is met. A capacity reserve released when the busy hour crosses the order line is easier to approve than a purchase made on a forecast. It also stops the budget from being spent on the first thing that looks urgent.

The board

A board does not approve a topology. It oversees money and risk, and it will ask three things: what are we accepting, what does it cost to accept less, and what happens if we say no. Write the paper around one decision. The CEO, the board and your peers covers how a head of function works with the three audiences. Here, state the decision, the three-year cost split into committed and new, the annual loss it is expected to remove, the hour cost at which the case flips, and the date you will report back with evidence. Say plainly what you are leaving exposed: the sites without a second path, and why.

Where practitioners disagree

Simple against resilient. Every second path is also a new thing to fail and to understand. Some heads of network engineering accept a known single point of failure rather than an untested pair, and say so in the strategy. They are right when the team is small and the loss is modest. They are wrong when one fault can stop the business and the log shows it has.

Expected loss against tail risk. Averaging loss over three years hides the one bad afternoon. A board may want a protection the arithmetic does not justify because it cannot accept the worst case. Report both: the expected figure and the worst event in the log.

SD-WAN against leased circuits. Advocates point to cost and independence from the circuit provider. Sceptics point to quality at peak and to the skills it needs. A pilot at one site, with a stated measure of how much of the essential traffic it carries, resolves it faster than an argument does.

In-house against managed. A managed WAN moves the running to a provider and the accountability stays with you. Contractors, outsourcing and vendors teaches the sourcing decision; the network team chapter, building a network team, is written separately.

Where it goes wrong

Redundancy bought by lead time. The sites that get a second circuit are the ones the provider can deliver first, not the ones that need it.

A second path that shares a duct. The paper says nine sites are protected and the route map says four are not.

The strategy as a vendor roadmap. It lists what to buy and never says what it prevents.

The hour cost invented by the network team. The case falls the first time finance questions it.

No review date. The assumptions go stale, the log gains a new event, and nobody reopens the decision.

Day to day

Annual cycle, eight to twelve weeks before the financial year. Gather the incident log and route maps, agree the hour cost with the finance partner, rank sites by exposure, price the options and write the strategy, then walk the head of engineering, the CFO and the CEO through it one by one before the paper reaches the board.

Quarterly. Review the strategy against the log: any new event, any change in hour cost, any renewal inside the next six months. Check the reserve conditions. Report progress on each coherent action and its owner.

Monthly. The capacity report from monitoring and capacity, the provider’s service-level report against your own measurements, and a look at the contract calendar. With the finance partner, spend against plan, including the months a new circuit has really billed.

Weekly. Your network team’s meeting, where the engineers raise what the strategy did not foresee, and any design review that touches a policy. When a new site or service is proposed, ask which row of the exposure list it changes.

Each year. A failover exercise on one protected site, to prove that the second path carries the essential traffic. A strategy that has never been tested is a belief.

BY ORG SIZE
STARTUPunder 30 people

There is no head of network engineering, and often no network engineer. The strategy is one page that the person who runs the cloud account and the office network writes for the founders: one provider or two, what happens to the business if the link drops for a morning, and a mobile data backup for the critical few. The budget is a few circuits and a firewall. The useful number is still the cost of an hour, because it tells you whether a second line of a few thousand naira a month is cheap.

SCALE-UP30 to 300

This is where the first real network strategy gets written. Sites multiply, a single provider carries everything, and the team of a handful is still installing and fixing by hand. The exposure list is short and the incident log has too few events, so the paper gives ranges. The head of infrastructure owns the budget and has a finance partner for the first time. Your first win is agreeing the hour cost, then buying resilience in the order of exposure.

ENTERPRISE300 and up

Strategy is layered: group standards, regional networks and a procurement office that owns provider contracts. The hard part is political and contractual: a regional head wants a local circuit, procurement has a preferred supplier, and a change to one site touches another division’s service. Exposure is priced by risk and finance teams in their own units, so translate your figures into theirs. Enterprise budgets also span managed services, so state who answers for failures in each.

ARTEFACT Write a three-year network strategy with a budget ~75 MIN
YOU PRODUCENetwork strategy memo and three-year budget

Template

# Network strategy and budget, <years>
Author · Date · Reviewed with: <CFO, finance partner, head of engineering>

## Diagnosis
Cost of an hour (from finance): <₦ per hour>, source: <who>
| Exposure | Events per year | Hours per event | Expected loss per year | Source |
|---|---|---|---|---|

Sites ranked by share of loss:
| Site | Share | Cost of protection over the term | Loss avoided over the term | Net |
|---|---|---|---|---|
Decision flips if the hour cost is below: <₦>

## Guiding policies
1. <Where redundancy is bought, and where buying stops, with the reason>
2. <How big the second path is, and what must survive>
3. <Rule for workarounds: each gets an end date>
Enforcement: <how each is checked>

## Coherent actions
| Action | Owner | Order by | Live by |
|---|---|---|---|

## Budget (₦m)
| Line | Year 1 | Year 2 | Year 3 | One-off or monthly | Committed or new |
|---|---|---|---|---|---|
Reserve (released when <condition>): <₦>

## Not doing
- <thing> — <exposure left> — <review date>

## Decision for the board
<The one decision, cost, loss removed, if no, review date>

## Assumptions and review
| Assumption | Evidence we will watch | If wrong, we will |
|---|---|---|
WORKED EXAMPLE

Ojaline (1,400 staff, nine city hubs, two of them core). The network team of four runs the hubs and the cloud networks. Balarabe, the head of infrastructure, wrote this memo with Ivo, the finance partner. All figures are illustrative.

Diagnosis. Ivo’s cost of an hour with every hub cut off in the delivery day: ₦46 million. Three-year log: one provider-wide fault of 170 minutes and four shared-duct cuts of about 5.5 hours each. Expected loss: provider-wide, one in three years × 2.83 hours × ₦46m = ₦43.4m a year; duct cuts, 4 in 27 hub-years × 5.5 hours × ₦46m = ₦37.5m a year, spread by hub share. Total ₦80.9m a year, ₦242.8m over three years.

Sites. Shares: Lagos 24%, Abuja 14%, Port Harcourt 12%, Ibadan 10%, Kano 9%, Enugu, Benin City and Kaduna 8% each, Warri 7%. A second-provider circuit costs ₦600,000 a month plus ₦1.2m to install: ₦22.8m over three years. Net over three years: Lagos +₦35.5m, Abuja +₦11.2m, Port Harcourt +₦6.3m, Ibadan +₦1.5m, Kano −₦0.9m, the rest negative. The case holds for the busiest four: ₦91.2m of cost (₦30.4m a year) against ₦145.7m of loss avoided (₦48.6m a year). It flips if the hour cost falls below ₦28.8m. Nine hubs would cost ₦205.2m: the last five cost ₦114.0m and avoid ₦97.1m.

Policies. Buy a second provider where the three-year net is positive; the route is in writing in each order. SD-WAN is piloted at Warri before it is considered for the rest. Every workaround has an end date.

Budget (₦m). Existing 15 circuits at ₦700,000: 126.0 each year. Tenth hub, committed: 12.6, 16.8, 16.8. Second provider at four hubs, billed from month 4: 26.4, 28.8, 28.8. SD-WAN pilot at ₦350,000 a month plus ₦1.2m to install: 5.4, 4.2, 4.2. New ask over three years: ₦97.8m. Reserve for upgrading both 2 Gbit/s core links, at ₦2.2m a month more per link: ₦52.8m a year from year 2, outside the ₦97.8m and released when a survivor link reaches its order line.

Not doing. A second provider at the other five hubs (₦114.0m for ₦97.1m of loss avoided); revisit after the pilot or if the hour cost passes ₦48m. Assumptions. The log is small: a second provider-wide event in year one would raise that loss from ₦43.4m to about ₦65.2m a year (two events in four years). Four circuits add about eight static route lines, taking 28 to 36, below the 60 that reopens the design; the tenth hub is itself a revisit trigger in network philosophies, so that review is already due.

Now you

You are head of IT at a 140-person Lagos pharmaceutical wholesaler with six depots. All six depots buy one circuit each from the same provider at ₦520,000 a month. Depot shares of orders: 30%, 22%, 18%, 12%, 10% and 8%. Finance says an hour with every depot cut off holds up ₦18 million of orders. Over three years the log shows one provider-wide fault of 180 minutes and three shared-duct cuts at single depots, averaging 5 hours each. A second provider quotes ₦490,000 a month plus ₦0.9 million to install each circuit, and the quote holds for 60 days. The current contract renews in five months and needs 90 days’ notice. The second provider will confirm in writing a route separate from the first provider’s for the top two depots, but not yet for the third. Write the strategy, the budget for the sites you protect, and the decision you would put to the board.

Self-check

DECIDE

Ojaline's 15 hub circuits all come from one provider at ₦700,000 a month. Finance puts an hour with every hub cut off at ₦46 million. The three-year log has one provider-wide fault of 170 minutes and four shared-duct cuts. A second provider's circuit costs ₦600,000 a month plus ₦1.2 million to install, and each hub would need one. The busiest four hubs carry 60% of the loss: three years of protection for them costs ₦91.2 million and avoids ₦145.7 million, while the other five cost ₦114.0 million and avoid ₦97.1 million. Nobody on the rota has run SD-WAN in production. Balarabe asks what you recommend.

READING
  1. BOOK
    Good Strategy Bad Strategy: The Difference and Why It Matters Richard Rumelt, 2011

    The kernel behind this chapter. Rereading it with an exposure list in hand is the quickest test of whether your network paper is a strategy or a list of purchases. Read: Part I on bad strategy, and the chapters on the kernel: diagnosis, guiding policy and coherent action.

  2. POST
    Writing an engineering strategy Will Larson, 2023

    Applies the kernel to engineering and sets the tests a policy must pass. Use it to check that each network policy is applicable, enforced and gives leverage.

  3. POST
    How to plan as an engineering executive Will Larson, 2023

    Separates the financial plan, the allocation and the roadmap and shows the order to settle them in. It is the frame your three-year budget sits inside.

  4. DOC
    Embracing Risk Google SRE book, chapter 3, 2016

    Treats reliability as risk on a continuum, with a cost on each side. It supports pricing availability against what the business loses, not buying the most you can.

  5. DOC
    AWS Direct Connect resiliency recommendation Amazon Web Services

    A provider's own tiers of connection resilience, with the topology each needs. A useful reference for what separate paths mean in a cloud link.

  6. BOOK
    The Practice of System and Network Administration, Volume 1 (3rd ed.) Limoncelli, Hogan and Chalup, 2016

    A long-standing reference for running infrastructure as a service with budgets and service levels, useful for the people and process side of the strategy. Read: The chapters on service levels, capacity and management skills.

All companies and people in these examples are fictional. Any resemblance to a real business or person is unintended.